Involuntary Resettlement 0P 4.12 Principles and Objectives WB Safeguards Training Workshop Tbilisi, May 2013.

Slides:



Advertisements
Similar presentations
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Advertisements

Conflict Affected and Fragile States Facility (CAF) Environmental and Social Challenges Trust Fund Two new Facilities: WBG Donor Forum – Paris – May 19,
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
Program Management Office (PMO) Design
CONSULTATION AND THE SAFEGUARD POLICIES ECA Safeguard Training for PIUs, May 17, 2011.
Training Workshop for Financial Intermediaries and Implementing Agencies May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World Bank.
INVOLUNTARY RESETTLEMENT Radhika Srinivasan, ECSSD
Lessons from Inspection Panel cases Alf Jerve, Panel Member October 9, 2013 The Inspection Panel Indigenous Peoples’ Lands and Development:
Climate Change Mitigation - The role of Financial Institutions
USAID Africa Bureau EIA Procedures for Sub-Projects
Involuntary Resettlement 0P 4.12 Principles and Objectives.
Introduction to World Bank Safeguard Policies and Project Preparation
Project Financing & Meeting International Social & Environmental Standards in Africa John Miragliotta, Sustainability Pty Ltd
Involuntary Resettlement 0P 4.12: Financial Intermediaries and Resettlement Planning Instruments.
Planning for Resettlement 0P 4.12 Instruments. Resettlement and Development No mitigation: Those losing land must make a sacrifice for national development.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Johnson Appavoo Operations Analyst WB Safeguards.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies.
Human Rights Training Tool. Develop a better understanding of the corporate responsibility to respect human rights relevant for the oil and gas industry.
Strengthening and Use of Country Safeguard Systems 2008 AECEN Forum Bali, Indonesia Strengthening and Use of Country Safeguard Systems 2008 AECEN Forum.
Environmental Impact Assessment (EIA): Overview
BioCarbon Fund Projects and World Bank Safeguard Policies Jean-Roger Mercier September 12, 2005.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
TRAINING ON WORLD BANK SAFEGUARD POLICIES Agi Kiss, Regional Safeguards Coordinator, Europe and Central Asia Tashkent, November 2013 Introduction and Overview.
Review and Update of IFC Policy and Performance Standards on Social and Environmental Sustainability and Disclosure Policy Background and Overview October.
Handbook for Post-Disaster Housing and Community Reconstruction
Performance Standards John Butler WB Safeguards Training Workshop November, 2013.
LARGE SCALE INFRASTRUCTURE DEVELOPMENT AND LAND RIGHTS IN SOUTH SUDAN “2014 WORLD BANK CONFERENCE ON LAND AND POVERTY ” Washington DC, March 23-27, 2015.
Involuntary Resettlement 0P 4.12: Planning Instruments WB Safeguards Training Workshop Tbilisi, May 2013.
PRESENTED BY: RAHIMA NJAIDI MJUMITA 3 RD APRIL 2012.
Module 23 Environmental Safeguards Accreditation Training, January 21 – 25, 2013 Public Consultation.
The Forest Carbon Partnership Facility FCPF Consultations with Indigenous Peoples and Forest Dwellers: Main Messages and Follow up Steering Committee Meeting.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Making the Grade: a survey of IFI social policies and the policies of the European Investment Bank (EIB) Tom Griffiths Forest Peoples Programme Rights.
BioCarbon Fund Projects and World Bank Safeguards Jean-Roger Mercier July 11, 2005.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Christopher Sheldon Senior Mining Specialist Mining Policy Division The World Bank Group Integrating Local Economic Development into World Bank Mining.
Involuntary Resettlement OPERATIONAL POLICY 0P 4.12 Resettlement Instruments Afshan Khawaja, OPCQC Zagreb, May 2009.
Financial Intermediary Lending World Bank Safeguards Workshop May 2013.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Mitigation and Impact management
CR TOOLKIT WORKSHOP MANAGEMENT TOOLKIT - RESETTLEMENT PLANNING Ref – ICMM CD TOOLKIT # 18 - Trainer: Martin Paining Date: 28 th of November, 2013.
M ODULE 6 PART 1: Planning and Stakeholder Management GLOBAL FUND GRANT CONSOLIDATION WORKSHOP DATE.
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
INTRODUCTION: World Bank Environmental and Social Safeguard Policies Training Workshop for Financial Intermediaries and Implementing Agencies May-June,
Georgian Legislation on Involuntary Land Acquisition and Resettlement and WB OP 4.12 Tbilisi, May 2013 Klavdiya Maksymenko.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Presenter: Johnson Appavoo Presentation prepared.
PARTICIPATORY GOVERNANCE ASSESSMENT (PGA) OVERVIEW OF PILOT RESEARCH IN CROSS RIVER STATE, NIGERIA Tony Atah, UN-REDD+ Stakeholder Engagement Specialist.
Module Land Acquisition and Resettlement Best Practices and Safeguards. Overall Safeguards presentation Jayantha Perera, PhD 1.
Module Review of Social Best Practices Jayantha Perera, PhD 1.
NATIONAL REDD+ SECRETARIAT Zonal Level REDD+ Awareness Creation Workshop MINISTRY OF ENVIRONMENT AND FOREST Tigray Regional State, Mekele September 3 &
World Bank Safeguard Policies Overview Disabilities & Safeguards Training Jean-Roger Mercier (ESDQC) July 11, 2006.
Involuntary Resettlement
Using Involuntary Resettlement on Highway Project to Alleviate Poverty: A Case Study from Hubei Shiman Highway Project, China Zhefu Liu
Involuntary Resettlement 0P 4.12 Principles and Objectives
Stakeholder consultations
GCF’s Environmental and Social Safeguards
NATIONAL REDD+ SECRETARIAT
Involuntary Resettlement Resettlement Instruments
Selected Project Covenants (1)
ADB Safeguard Policy Statement (2009)
Involuntary Resettlement 0P 4.12: Planning Instruments
ECA Safeguards Training Workshop
Ensuring Environmental and social safeguards
Relationship between World Bank and Romanian EA requirements
Dr. Abhash Panda Social Safeguards Specialist (October 28, 2016)
Involuntary Resettlement 0P 4.12 Principles and Objectives
Environment Safeguards
Social Safeguards “Procedures and approaches that can help to ensure that “do no harm” to people or the environment, but rather enhance social and environmental.
Social Safeguards “Procedures and approaches that can help to ensure that “do no harm” to people or the environment, but rather enhance social and environmental.
Presentation transcript:

Involuntary Resettlement 0P 4.12 Principles and Objectives WB Safeguards Training Workshop Tbilisi, May 2013

A Resettlement Overview Why does the Bank have an Involuntary Resettlement Policy? Why does the Bank have an Involuntary Resettlement Policy? How has the Bank’s policy evolved? How has the Bank’s policy evolved? What are policy objectives and key principles What are policy objectives and key principles What is role of Financial Intermediaries? What is role of Financial Intermediaries?

Why a Policy on Involuntary Resettlement? Bank funded investments, especially infrastructure development, often require the acquisition of privately and community owned land Bank funded investments, especially infrastructure development, often require the acquisition of privately and community owned land Land acquisition induced impacts include: physical relocation, loss of land and assets, disruption of livelihoods Land acquisition induced impacts include: physical relocation, loss of land and assets, disruption of livelihoods Without proper planning and management, involuntary resettlement may result in severe social impacts on affected populations Without proper planning and management, involuntary resettlement may result in severe social impacts on affected populations

Resettlement History No mitigation: Those losing land must make a sacrifice for national development objectives No mitigation: Those losing land must make a sacrifice for national development objectives Eminent domain: compensation for assets favors land owners. Eminent domain: compensation for assets favors land owners. Risks of impoverishment if interests of poor and vulnerable are not recognized Risks of impoverishment if interests of poor and vulnerable are not recognized Resettlement can be a development opportunity too: Extending the reach of project benefits Resettlement can be a development opportunity too: Extending the reach of project benefits

Key Policy Objectives Avoid, minimize, or otherwise mitigate land acquisition and associated adverse impacts Avoid, minimize, or otherwise mitigate land acquisition and associated adverse impacts Assist all affected people to improve, or at least restore, incomes and living standards Assist all affected people to improve, or at least restore, incomes and living standards Resettlement as a development opportunity for households and community infrastructure Resettlement as a development opportunity for households and community infrastructure (Mitigating risks for affected people helps minimize risks to borrower and Bank, too) (Mitigating risks for affected people helps minimize risks to borrower and Bank, too)

Key Guiding Principles All affected persons should be compensated or assisted in other ways, regardless of legal status All affected persons should be compensated or assisted in other ways, regardless of legal status Compensation for all assets at replacement cost (enough to obtain assets of equivalent value) Compensation for all assets at replacement cost (enough to obtain assets of equivalent value) Income restoration may require supportive measures in addition to compensation for assets Income restoration may require supportive measures in addition to compensation for assets Affected persons should be involved in resettlement planning and implementation Affected persons should be involved in resettlement planning and implementation Consultation Consultation Information Disclosure Information Disclosure Grievance Procedure Grievance Procedure

Role of Financial Intermediaries Prepare and agree a Resettlement Policy Framework with the Bank, ensure FI capacity to oversee social safeguard subproject issues Prepare and agree a Resettlement Policy Framework with the Bank, ensure FI capacity to oversee social safeguard subproject issues Screen all proposed on-lending activities for land acquisition/associated resettlement impacts (going forward and in anticipation of project prior to funding) Screen all proposed on-lending activities for land acquisition/associated resettlement impacts (going forward and in anticipation of project prior to funding) Legal documents require compliance if IR impacts should arise Legal documents require compliance if IR impacts should arise For all subprojects involving relevant impacts, Bank approval of a resettlement plan required before accepted for financing For all subprojects involving relevant impacts, Bank approval of a resettlement plan required before accepted for financing

Recurring Issues and Problems Defining project scope: “Indirect impacts” and “linkage” in application of Bank policy Defining project scope: “Indirect impacts” and “linkage” in application of Bank policy Bridging the eligibility gap: Assisting vulnerable people and those who lack full legal recognition Bridging the eligibility gap: Assisting vulnerable people and those who lack full legal recognition Covering all costs: ‘Replacement cost’ valuation, transaction costs and transitional support Covering all costs: ‘Replacement cost’ valuation, transaction costs and transitional support Asset stock versus income flow: Going beyond compensation to livelihood restoration and incorporation of development opportunities Asset stock versus income flow: Going beyond compensation to livelihood restoration and incorporation of development opportunities In FI projects, ensuring coordination with sub- clients in implementation and reporting In FI projects, ensuring coordination with sub- clients in implementation and reporting

Capacity Building (at all levels) Discuss with client what mitigation measure is feasible. Discuss with client what mitigation measure is feasible. Try to use mitigation measures that fit within the National legal framework and consistent with local practice as long as you these comply with the spirit of OP 4.12 that no one should be “worse off” and mitigation measures are done within framework of development. Try to use mitigation measures that fit within the National legal framework and consistent with local practice as long as you these comply with the spirit of OP 4.12 that no one should be “worse off” and mitigation measures are done within framework of development. Ensure that the client sees you as their technical partner to help them overcome complex issues rather than someone who is a watchdog. If you explain clearly what is needed, they realize it is in their interest to do it right and that you will be there to help them implement it. Ensure that the client sees you as their technical partner to help them overcome complex issues rather than someone who is a watchdog. If you explain clearly what is needed, they realize it is in their interest to do it right and that you will be there to help them implement it. Building capacity with the local authority goes a long way so ensure the first interaction is positive and communication proceeds smoothly. Building capacity with the local authority goes a long way so ensure the first interaction is positive and communication proceeds smoothly.