1/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G070551-00-D - Wednesday, July 25, 2007 Recent Timing Diagnostic Results.

Slides:



Advertisements
Similar presentations
Time amTime mixed clocks types Time on watches & clocks Time word problems Time in pm.
Advertisements

11/12/2003LIGO Document G Z1 Data reduction for S3 I Leonor (UOregon), P Charlton (CIT), S Anderson (CIT), K Bayer (MIT), M Foster (PSU), S Grunewald.
Spring LSC 2001 LIGO-G W E2 Amplitude Calibration of the Hanford Recombined 2km IFO Michael Landry, LIGO Hanford Observatory Luca Matone, Benoit.
LIGO-G W Earth Tide Investigations Fred Raab LIGO Hanford Observatory August 15, 2001 PredictionFeedforward 30.
Time 1 day = 24 hours 1 hour = 60 minutes 1 minute = 60 seconds 1 year
G D The Initial LIGO Timing System Nearly Fatally Flawed CDS Meeting, January 30, 2008 Daniel Sigg, LIGO Hanford Observatory.
LIGO-G W LIGO Laboratory1 Educational Outreach Across LIGO Funding source: »LIGO operations »IPSE proposal submitted in 2003 (pending) »Advanced.
LIGO-G D LIGO calibration during the S3 science run Michael Landry LIGO Hanford Observatory Justin Garofoli, Luca Matone, Hugh Radkins (LHO),
LIGO Student Investigations
LIGO Reduced Data Sets E7 standard reduced data set RDS generation for future runs decimation examples LIGO-G Z Isabel Leonor (w/ Robert Schofield)
R. Stone for the LSC Center for Gravitational Wave Astronomy Department of Physics and Astronomy University of Texas at Brownsville. GWDAW, Boston, MA,
LIGO Hanford Observatory FY2001 Budget Request Fred Raab October 3, 2000.
LIGO-G Z Camp orientation / overview K. Riles - University of Michigan 1 Orientation and Overview Keith Riles (University of Michigan)
G D 1 LIGObservatory Environment David Shoemaker 3 July 2001.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
LIGO- GXXXXXX-XX-X Advanced LIGO Data & Computing Material for the breakout session NSF review of the Advanced LIGO proposal Albert Lazzarini Caltech,
Proposal to increase the credibility of LIGO timing using atomic clocks and an optical fiber based time distribution system Proposal to increase the credibility.
LSC Meeting, 17 March 2004 Shawhan, Marka, et al.LIGO-G E Summary of E10 / S3 Hardware Signal Injections Peter Shawhan, Szabolcs Márka, Bruce.
Report From Joint Run Planning Committee R. Passaquieti & F. Raab - LSC / VIRGO Collaboration Meeting rd July 2007 – LIGO-G Z.
LIGO-G DM. Landry – Amaldi5 July 9, 2003 Laser Interferometer Gravitational Wave Observatory Monitoring LIGO Data During the S2 Science Run Michael.
LSC General Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 UWM Data Analysis Facility LSC General Meeting, August.
G D Electronics Infrastructure for advanced LIGO LSC Meeting, Boston, July 25, 2007 Daniel Sigg, LIGO Hanford Observatory.
LIGO-G Z Detector Characterization SummaryK. Riles - University of Michigan 1 Summary of Detector Characterization Sessions Keith Riles (University.
LIGO-G I S5 calibration status Michael Landry LIGO Hanford Observatory for the LSC Calibration Committee LSC/Virgo Meeting May 22, 2007 Cascina,
LIGO-G D “First Lock” for the LIGO Detectors 20 October 2000 LIGO Hanford Observatory Stan Whitcomb.
G D The LIGO Timing System LSC Seminar, May 23, 2003 Daniel Sigg.
LIGO-G D Global Diagnostics and Detector Characterization 9 th Marcel Grossmann Meeting Daniel Sigg, LIGO Hanford Observatory.
Lecture 5 – Differential Correction
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
LIGO-G DM. Landry – Hanover LSC Meeting, August 18, 2003 LIGO S2 Calibration Michael Landry LIGO Hanford Observatory Representing the calibration.
LIGO-G D Status of Stochastic Search with LIGO Vuk Mandic on behalf of LIGO Scientific Collaboration Caltech GWDAW-10, 12/15/05.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
LIGO- G Z August 16, 2006August 2006 LSC Meeting - DetChar 1 Spectral Line Working Group Report Keith Thorne, Chair.
LSC Meeting, 19 March 2003 Shawhan, Leonor, MarkaLIGO-G D Introduction to Hardware Signal Injections Peter Shawhan, Isabel Leonor, Szabi Márka.
LIGO-G D LSC Meeting Nov An Early Glimpse at the S3 Run Stan Whitcomb (LIGO–Caltech) LIGO Scientific Collaboration Meeting LIGO Hanford.
ADVANCED NETWORK & SERVICES, INC. Surveyor Design and Results Bill Cerveny and Sunil Kalidindi Advanced Network & Services.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
LIGO-G Z S2 and S3 calibration status Michael Landry LIGO Hanford Observatory for the Calibration team Justin Garofoli, Luca Matone, Hugh Radkins.
11/12/2003LIGO-G Z1 Data reduction for S3 P Charlton (CIT), I Leonor (UOregon), S Anderson (CIT), K Bayer (MIT), M Foster (PSU), S Grunewald (AEI),
LIGO-G D Upper Limits on the Stochastic Background of Gravitational Waves from LIGO Vuk Mandic Einstein2005 Conference Paris, July
LIGO- G D Experimental Upper Limit from LIGO on the Gravitational Waves from GRB Stan Whitcomb For the LIGO Scientific Collaboration Informal.
LIGO-G Z Detector Characterization Issues K. Riles - University of Michigan 1 Detector Characterization Issues -- S2 Analysis & S3 Planning.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
LIGO-G Z Detector Characterization Issues K. Riles - University of Michigan 1 Introduction to Detector Characterization Sessions Keith.
LIGO-G D Online Digital Signal Processing NSF Review, October 23, 2002 Daniel Sigg, LIGO Hanford Observatory.
LSC meeting – Mar05 Livingston, LA A. Di Credico Syracuse University Glitch investigations with kleineWelle Reporting on work done by several people: L.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
LIGO-G D S2 Glitch Investigation Report Laura Cadonati (MIT) on behalf of the Glitch Investigation Team LSC meeting, August 2003, Hannover.
LIGO-G W Interferometer and modecleaner transients during the E2 run Rauha Rahkola and Ray Frey University of Oregon Rick Savage LIGO Hanford.
ScottHa and ScottHu “The Lesser Scotts” What’s new in VS2013 for Web Developers.
LIGO-G Z Report on the S2 RunK. Riles / S. Whitcomb 1 Report on the S2 Run Keith Riles (University of Michigan) Stan Whitcomb (LIGO–Caltech)
2011 All rights reserved National Metrology Centre Status Report about National Metrology Centre A*STAR By LIU Yanying Agency for Science,
LIGO-G D Glitch Investigation Update Laura Cadonati for the Glitch Investigation Group LSC meeting, Hanford November 12, 2003.
Gravitational waves from highly eccentric encounters of black holes: Preliminaries toward detection Birjoo Vaishnav, CGWA UTB Matt Benacquista, UTB Sergei.
Data Acquisition, Diagnostics & Controls (DAQ)
Gregory Mendell LIGO Hanford Observatory
Prospects and plans : LIGO interferometers Michael Landry LIGO Hanford Observatory LSC meeting, MIT Nov 4-5, 2006.
October 2006, LIGO Hanford Observatory
Reaching the Advanced LIGO Detector Design Sensitivity
Overview of E10 / S3 Hardware Injections
S2/S3 calibration Gabriela González, Louisiana State University Plus
Report on the S2 Run Keith Riles (University of Michigan)
Stan Whitcomb LSC meeting Livingston 21 March 2005
Virgo Update – LSC meeting
M Ashley - LSC Meeting – LIGO Hanford, 12 Nov 2003
Calibration: S2 update, S3 preliminaries
Measurements of Q in Suprasil 311SV
Arm Length Stabilization at LHO
For More Details:
Presentation transcript:

1/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Recent Timing Diagnostic Results Rubab Khan 1, Luca Matone 1, Szabi Marka 1, Daniel Sigg 2 1 Columbia University, GECo 2 LIGO Hanford Observatory LIGO-G D LSC-Virgo Meeting 2007 July 23-26, MIT, Boston

2/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 LSC Timing Diagnostic Results

3/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 LSC Timing Diagnostic Results 1 Day ~14 hours 7pm CDT

4/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Auxilary Timing Channels Detailed results are available from: first 20 months of S5 Per Science segments results are available for H1, H2, L1 at

5/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Example: Auxilary Timing Channels H1 (Feb 2007) EX, EY, LVEA PEM timing

6/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Example: Auxilary Timing Channels H1 (Feb 2007) EX, EY, LVEA PEM timing

7/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Example: Auxilary Timing Channels H1 (Feb 2007) EX, EY, LVEA PEM timing

8/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Cross Verification to Atomic Clock Detailed results are available from: first 18 months of S5

9/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Example: Symmetricom vs. Atomic Symetricom/Agilent 58503B GPS vs. Symmetricom CsIII Caesium Clock

10/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Example: Symmetricom vs. Atomic Symetricom/Agilent 58503B GPS vs. Symmetricom CsIII Caesium Clock

11/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Example: Symmetricom vs. Atomic Symetricom/Agilent 58503B GPS vs. Symmetricom CsIII Caesium Clock

12/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Example: Symmetricom vs. Atomic Symetricom/Agilent 58503B GPS vs. Symmetricom CsIII Caesium Clock

13/13 R.Khan, L. Matone, Sz. Marka, D. Sigg - Recent Timing Diagnostic Results - LIGO-G D - Wednesday, July 25, 2007 Summary LSC (DuoTone) results indicate stable timing performance –ToDo: cumulative database for S5 LSC timing Summary of timing information on auxilary channels is available on the web Summary of long term timing hardware comparison information is available on the web Hardware parts presently studied for Advanced LIGO are promising