Reactive power control in Wind Farms by using the capability of wind generators: real experience and results Milan, May 9 th, 2007 Emilio Fernández-Antón.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Seite 1 “Wind Power Plant Capabilities: Operate Wind Farms Like Conventional Power Plants” K. Rohrig, B. Lange, A. Gesino, M. Wolff, R. Mackensen, J. Dobschinski,
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
Lignite Project By Ramic, Haris. GLOBAL OUTLOOK FOR ENERGY World energy consumption is projected to increase at about 1.8%/year between 2000 and 2030(driven.
Electricity Technology in a Carbon-Constrained Future February 2007 Steven Specker President and CEO.
The Economics of Renewable Energy Figures and Tables By Jonathan M. Harris, Brian Roach, and David Timmons Copyright © 2014 Jonathan M. Harris.
Islamic Republic of IRAN
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Pärnu-Jaagupi Gümnaasium Estonia. Renewable energy is generally defined as energy that comes from resources which are continually replenished on a human.
Experience you can trust. 1 Solutions for large-scale wind power integration in the European system EWEC2009 Energy and power management Frits VerheijMarch.
Energy Sources Grouping task. nuclear oil gas Solar cells / PV biofuel / biomass wave hydroelectric coal geothermal wind tidal.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
IPCC Synthesis Report Part IV Costs of mitigation measures Jayant Sathaye.
1 LNI & JMJ, SmartGrid 2nd General Assembly Danish TSO Research and Demonstration Activities towards a Future Smart grid EcoGrid Energinet.dk, PMFU section.
1 Smart Distribution Systems: Sustainability Issues S. S. (Mani) Venkata Alstom Grid and University of Washington (UW)
Overview of the latest developments of the Hungarian energy market Mr. György Hatvani Deputy State Secretary of energy and industry Ministry of Economy.
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
Demand Response for System Operation in Spain. 23th June 2011.
Energy Renewable Energy in Germany Uta Zähringer - RENAC, Athens - September 15, 2009 placeholder partner logo Renewables Academy (RENAC) AG Schönhauser.
Presented by: Gerald W. Braun, Director Business Development June 17, 1998 A Business Unit of Amoco/Enron Solar Financing of Renewables: Considerations.
The SEC Power Forum Wolfgang Braun CEO Energy Transmission Middle East, SIEMENS Session IV: Opportunities in Transmission & Distribution Related Industries.
120 MW geothermal power plant, Iceland
Flow Battery Energy Storage Systems Kotzebue Electric Association Alaska Center for Energy and Power.
Status: Karsten Brinkmann PowerMex-CHP_CO2 bensheim engineers CHP – one Possibility to reduce CO 2 Karsten Brinkmann Promotion for CHP Berlin.
HomeNextPrevious I. INTRODUCTION II. WIND TURBINE GENERATOR MODEL III. STATCOM MODEL IV. SIMULATION RESULT CONTENTS OF TOPIC V. CONCLUSION Previous HomeNextHomePreviousNextHome.
Small Scale Wind Energy. Capacity factor The net capacity factor of a power plant is the ratio of the actual output of a power plant over a period of.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
© OECD/IEA 2010 Cecilia Tam International Energy Agency Martin Taylor Nuclear Energy Agency The Role of Nuclear Energy in a Sustainable Energy Future Paris,
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Electricity Market Design Presentation at the 31st USAEE/IAEE North American Conference November 5-7 Austin, Texas Lars Bergman IAEE and Stockholm School.
Development of renewable energy A chance and a challenge for Poland.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Wind Energy E U R O P E A N W I N D E N E R G Y C O N F E R E N C E & E X H I B I T I O N1 Athens, 1 st March 2006 Wind Energy in Spain Status.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
Integration of the German Offshore Wind Power Potential into the Electricity Supply System B. Lange, Ü. Cali, R. Jursa, F. Schlögl, M. Wolff, K. Rohrig.
Investments in Renewable Energies. A predictable business environment n A business friendly environment and a functioning and stable legislative are the.
Chapter 3 Wind Power of the world. 3.1 Development and utilization of wind energy in China  Wind power generation  Wind farm construction.
ICT4SMARTDG ICT Solutions to enable Smart Distributed Generation WP3 - Executive Summary 20th May 2011.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Last days of suppliers hegemony: customer driven market has come Athens, March 1 st, 2006 Ester Cámara Operations Manager Iberdrola Renewables Energies.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Renewables and System Services Ann Scully.
IBERDROLA RENEWABLE ENERGIES Large-scale integration - toward 12% penetration in Europe - A reality? Athens, February 26, 2006 Pedro Barriuso Otaola General.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
FUTURE FOR OFFSHORE WIND ENERGY IN SPAIN Wind Energy Department
© Copyright 2013, First Solar, Inc. Establishing Accurate Power Generation Cost Assumptions for ERCOT Planning Colin Meehan – Director, Regulatory and.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Production of Hydrogen from Renewable Electricity: The Electrolysis Component Workshop on Electrolysis Production of Hydrogen from Wind and Hydropower.
Steady State Analysis Of A Microgrid Connected To A Power System
World energy production by source in 2004: Oil 40% coal 23.3% natural gas 22.5% hydroelectric 7.0% nuclear 6.5% biomass and other 0.7%.
Delivering for 2020 TSO Facilitation of Renewables Studies EirGrid Customer Conference Jonathan O’Sullivan October 2009.
| faculty of law groningen centre of energy law The role of law in regulating offshore energy production and securing energy supply Hannah.
Energy and Matter: Natural Resources SCI What is a natural resource?
Betül Özer, Erdem Görgün, Selahattin İncecik
HYDROELECTRIC CORPORATION
UNIVERZA V MARIBORU FAKULTETA ZA ELEKTROTEHNIKO, RAČUNALNIŠTVO IN INFORMATIKO Smetanova 17, 2000 Maribor, Slovenija 26 TH POWER ENGINEERING– FERI 2017.
Project Area Processes and Diagnostics
Dominik Franjo Dominković. , I. Bačeković, D. Sveinbjörnsson, A. S
STATE ENERGY AND WATER REGULATORY COMMISSION
Intelligent Power Module
EU-IPA12/CS02 Development of the Renewable Energy Sector
NS4960 Spring Term, 2018 China: Expanded Renewables
Presentation transcript:

Reactive power control in Wind Farms by using the capability of wind generators: real experience and results Milan, May 9 th, 2007 Emilio Fernández-Antón Technical Services Iberdrola Renewables Energies

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES : IBERDROLA’s renewable capacity will reach over 7.000MW as established by the Strategic Plan International Capacity National Capacity These figures imply an average annual growth of over 850 MW International capacity will reach a significant importance with over 20% of total capacity New technologies will add power: TermoSolar, PV, Wave Energy and Bio-mass

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES3 Iberdrola is applying its own professional production management model to wind energy Maximize economic performance of every wind farm during the extension of its lifetime Starting point Production Management Model Main goal Iberdrola’s 100 years utility culture Wide O&M expertise:  Hydroelectric  Gas combine cycles  Nuclear  Renewables  Fuel oil  Coal  Cogeneration Iberdrola doesn’t develop a wind farm to sell it Iberdrola develops to create value Systems and procedures Strategy Organization & functions “Dominate technology and key management factors”

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES4 Wind in the Grid. Iberdrola’s position Large scale integration on the grid may be one of most important barriers for the development of wind energy. Will we reach the EU on wind energy generation if we do not find the way of solving these problems? Iberdrola has got a valuable experience in the Spanish case: wind energy must be quite alike conventional plants. Additionally, the grid must be able to feed in as much as wind energy be possible. Iberdrola, as one of the main player of the world market, is using its position in the wind sector to… –propose technical improvements to manufacturers, pushing the market to give solutions to these new requirements –define and install new solutions for wind energy management, showing they are useful and feasible –cooperate with the OS and the sector to achieve realistic solutions

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES5 Reactive Power Requirements. The Spanish case. During the last two years, these requirements had to be fulfilled in Spain: Bonus (%) Power FactorHigh LoadMedium LoadLow Load Lagging <0, <0,96 & ≥ 0, <0,97 & ≥ 0, <0,98 & ≥ 0,9702 <1 & ≥ 0, Leading <1 & ≥ 0,98020 <0,98 & ≥ 0,9720 <0,97 & ≥ 0, <0,96 & ≥ 0, <0,958-4

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES6 Iberdrola’s Results (I) Each Iberdrola’s turbine regulates reactive power. Each Iberdrola’s wind farm regulates reactive power in the connection point. Additionally, Iberdrola’s wind farms follow special requirements from the System Operator (REE) when the grid needs it. Results have been achieved exclusively based on the wind turbine regulation capability, no capacitors or similar solutions at the substation have been used.

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES7 Iberdrola’s Results (II). Fulfilling regulation [PE] BORDECOREX NORTE From: 01/01/2007 To: 31/01/2007 DateTimeP(kWh)Q2(kWh)Q3(kWh) Cos Phi Lag/LeadPeriodBonus Total ,12% 01/01/20070: ,88INDValle8,00% 01/01/20070: ,92INDValle8,00% 01/01/20070: ,91INDValle8,00% 01/01/20071: ,91INDValle8,00% 01/01/20071: ,92INDValle8,00% 01/01/20071: ,91INDValle8,00% 01/01/20071: ,91INDValle8,00% 01/01/20072: ,92INDValle8,00% 01/01/20072: ,92INDValle8,00% 01/01/20072: ,92INDValle8,00% 01/01/20072: ,92INDValle8,00% 01/01/20073: ,93INDValle8,00% 01/01/20073: ,93INDValle8,00% 01/01/20073: ,91INDValle8,00% 01/01/20073: ,91INDValle8,00% 01/01/20074: ,91INDValle8,00%

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES8 Iberdrola’s Results (III). Fulfilling TSO requirements During the day 15/02/2007, (01:32 a.m.), REE asked for a reduction of the consumed reactive power in Pedregal Wind Farm, due to the low voltage level. Thanks to its centralized Renewable Energies Control Centre (CORE), Iberdrola reduced the reactive power absorbed by the Wind Farm, going to fdp=1. Consequently, the voltage level grew, reaching stable levels.

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES9 Iberdrola’s Results (IV). Fulfilling TSO requirements. Active Power.

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES10 Iberdrola’s Results (V). Fulfilling TSO requirements.Reactive Power.

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES11 Iberdrola’s Results (VI). Fulfilling TSO requirements. Voltage Level.

May 9th, 2007 IBERDROLA RENEWABLES ENERGIES12 Conclusions Iberdrola’s wind farms are able to regulate reactive power and voltage level, cooperating with TSOs in order to assure the grid stability. The obtained results shows that wind farms can cooperate with the grid stability in a similar way that conventional power plants do.