Copyright © 2012 SCKCEN WP1: Reference design objectives and specifications Didier De Bruyn (SCKCEN), Presented by Alessandro Alemberti (ANS) 1 7th LEADER.
Didier De Bruyn & Rafaël Fernandez (SCKCEN), Luigi Mansani (Ansaldo), Antony Woaye-Hune (AREVA), Massimo Sarotto (ENEA) & Evaldas Bubelis (KIT) ICAPP’12.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
Copyright © 2013 SCKCEN MAX School - Frankfurt am Main – 1 st -2 nd October 2013 MYRRHA Multipurpose hYbrid Research Reactor for High-tech Applications.
TMT Handbook: Responding to a crisis resulting from the malevolent use of ionizing radiation Carlos Rojas-Palma et al. Belgian Nuclear Research Center.
Transportation Estimators Association Conference Saratoga Springs, New York October 4, 2008 Procedures Guide for Right of Way Cost Estimation and Cost.
WP 2. Benchmarking and best practice transfer Nataša Urbančíková Faculty of Economics Technical University of Košice.
Faiveley Plasturgie Group Presentation. Page 2 FP Présentation FP groupe 2012 The copying, distribution and utilization of this document as well as the.
Proposals’ Preparation Support Procedure (Pilot programme: 10 months) - Research and International Relations Service University of Cyprus.
Introduction Breadth How it Works The Next Steps.
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
IREEN Project Meeting 5 – Manchester September 18 th 2012 WP1 – Collaborative Network Jaak Vlasveld.
Task 3.3 Fuel Transfer System Conceptual design Joel Janssens SCKCEN LEADER WP3 Technical Meeting, Karlsruhe, 20/11/2012 Copyright © 2011 SCKCEN.
EUROPEAN LEAD FAST REACTOR The LEADER project aims to define an European Lead Fast Reactor configuration for an industrial-sized (600 MWe, the ELFR) reactor,
1 TCADS, Technology & Components of Accelerator Driven Systems, March 15-17, 2010, Karlsruhe (DE) Copyright © 2009 SCKCEN MYRRHA: ADS Programme in Belgium.
Finnish ICT Barometer 2007Copyright © VTT BIM - Experience in Finland Reykjavik Heikki Kukko.
© SCKCEN Academy Michèle Coeck Head SCKCEN Academy for Nuclear Science and Technology Activities of the SCKCEN Academy and BNEN.
Prof. Roy Levow Session 9.  Defining the APF  An Overview of the APF  The APF Core Values.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
Copyright © 2012 SCKCEN Didier De Bruyn (SCKCEN), with contributions from Rafaël Fernandez (SCKCEN), Luigi Mansani (Ansaldo), Antony Woaye-Hune (AREVA),
D29 - Roadmap for LFR development Davide Mattioli ENEA UTFISSM-PRONOC LEADER (Lead-cooled European Advanced DEmonstration Reactor) WP 1 - Task 1.1 Amsterdam.
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
Top Down Cost Estimate ELFR LEADER WP1.4 Status Petten, Netherlands Ferry Roelofs
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 64 Geneva, 07 June 2012 Informal document No. GRPE (64th GRPE, June.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
LEADER WP3 Conceptual Design Status KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Luigi Mansani
Senior Design Experience Semester II Project Requirements and Timeline
March 2, 2008 – GEC #2 Newcomerswww.geni.net1 The GPO Solicitation Process Feedback encouraged Chip Elliott GENI Project Director Clearing.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
United Nations Statistics Division EGM, May 2015 Issues affecting ISIC Rev.4.
Copyright © 2013 SCKCEN Pb-Bi target for Optimization toward higher yields SCKCEN Mentor : Dr. Lucia-Ana Popescu University Promoter : Prof.
Copyright © 2013 SCKCEN Legacy sites in Belgium K. Mannaerts, S. Pepijn FANC - AFCN D. Jacques, H. Vandenhove Institute Environment, Health and Safety.
ALFRED Control Rod and Safety Rod
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
Session 8Slide 8-1 The Mitigation Plan Session 8 Slide Deck.
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
Copyright © 2014 SCKCEN Production of medical radioisotopes at MYRRHA Lucia Popescu SCKCEN
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
LEADER WP3 Conceptual Design Status KIT Campus North, Karlsruhe, Luigi Mansani
LEADER Work Package 2 Status of activities Giacomo Grasso on behalf of Carlo Artioli – Work Package 2 leader UTFISSM-PRONOC ENEA LEADER PCC meeting Bologna,
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
DIRAC Phase 1 Reporting, Dec. 1 st, 2005 Reporting to the Commission Periodic Reports Interim Activity Reports Project Deliverables Final Reports.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
Task 2.1: Review of ELSY and Conceptual design & neutronic characterization of the ELFR Industrial Plant Kamil Tuček on behalf of Task 2.1 contributors.
“Design and safety analysis of Alfred” G. Forasassi President of CIRTEN CIRTEN Interuniversity Consortium for Technological Nuclear Research 3 rd LEADER.
Copyright © Texas Education Agency, All rights reserved. 1 Production Processes Statistics & Risk Management.
Customer contractor Sociologic Research on Awareness of Industrial Property Protection Possibilities December, 2015.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
Middle Fork Project Relicensing Process Plan April 25, 2006.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Copyright © 2013 SCKCEN MYRRHA Design overview Didier De Bruyn (SCKCEN) LEADER technical workshop Petten, February 2013.
NRG Contribution to LEADER WP1.1 Status LEADER Petten, Netherlands Ferry Roelofs
November 19th 2010, Bologna LEADER 1 1st LEADER PCC MEETING WP4 PLANT OPERATION, INSTRUMENTATION, CONTROL AND PROTECTION SYSTEM DESIGN.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
.  “Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted © and trademarked ™ as the.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
Progress Meeting 20 Nov 2012, Karlsruhe LEADER 1LEADER1 WP1 REFERENCE DESIGN OBJETIVES AND SPECIFICATION (SCK-CEN)
Large Synoptic Survey Telescope
Absent, yet Present? Tracing “Responsible Innovation” in Radiation Protection Research Michiel van Oudheusden Ricomet Conference – Vienna – June.
The DBD: Outline and Scope
SKADS Controller’s Meeting Timeline Annual Financial Report
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Review of the Art 17 Reporting - update to the Habitats Committee
Presentation transcript:

WP1: Reference design objectives and specifications Didier De Bruyn SCKCEN Fourth PCC meeting FP7 LEADER Bologna, 27 October 2011 Copyright © 2011 SCKCEN

Recall: Schedule D29 D01 D02 D30D30 R1 D29 R1D29 R2 D01: Updated design options for the LFR reference D02: Design options for the ETDR D29: Roadmap for LFR development D30: Cost estimate for LFR & ETDR © SCKCEN 2

Task 1.1 Roadmap The “Rev 1” version is on-going: Include PALLAS together with JHR & MYRRHA Include ELECTRA in parallel to the other facilities (from GUINEVERE to the industrial one) Rename the facilities to avoid misunderstanding Consider the current design updates (ALFRED – D02) Check the schedules with experts for the different concepts (detailed NRG level  global level) some misunderstanding NRG >< experts (Fukushima) recall the inherent favourable LFR characteristics (but no comparison!) Include a § on funding opportunities. © SCKCEN 3 Blue: foreseen & done Red: foreseen but not done Green: not foreseen but done

Renaming the different concepts ELSY is the design performed in an FP6 project, but also still the name of the FOAK facility, so the risk of misunderstanding is real! Proposal: 100 MW th Technology Pilot Plant: MYRRHA 300 MW th Demonstration: ALFRED MW th Prototype: ELSY  PROLFR Min 600 MW el Industrial plant: ILFR  ELFR DONE ! 4 © SCKCEN

Tasks 1.2 LFR options & 1.3 ETDR options Del 01 finalized & distributed. Del 02 written, distributed for comments & finalized (July ‘11). © SCKCEN 5

Task 1.4 Cost estimate Methodology proposed by EA after iteration with NRG, but input will be required from all partners (distribution proposed by EA); Some guidelines to ensure consistency : Costs are expressed in € (Dec 2010); Separate investment costs (engineering, licensing, construction) from operation costs (O&M, fuel cycle) Where to put D&D? Proposal: in investment Consider R&D? Proposal: no, but to be mentioned Interest during construction? Proposal: no (in other words overnight costs are calculated without escalation) Contingencies? Proposal: yes, preferably per item To allow comparison: recalculate the FP6 ELSY following those rules. © SCKCEN 6 Decision WP1 meeting 24 october ‘11

Some comments from the WP leader Good participation from most partners: NRG is interacting in 1.1 & 1.4 Good input from WP2 & WP3 partners Good feedback from reviewers Less good participation from AGH Not present in 2010 (for good reason) Few feedback since then (mixing with WP2 ?) Work has been performed so far, but sometimes by other partners than originally foreseen Can we envisage to re-distribute the WP budget? 7 © SCKCEN

Original distribution of resources 8 partnernamet1,1t1,2t1,3t1,4Total 1Ansaldo AGH6 6 3CEA 4CIRTEN 6EA55 7ENEA31 4 8KIT0,250, INR2 2 10JRC-Petten0,5 11KTH 12NRG437 13PSI 14SCKCEN SRS 16NRI 17Uni Bologna Total11,257, ,5

Copyright notice Copyright © SCK  CEN All property rights and copyright are reserved. Any communication or reproduction of this document, and any communication or use of its content without explicit authorization is prohibited. Any infringement to this rule is illegal and entitles to claim damages from the infringer, without prejudice to any other right in case of granting a patent or registration in the field of intellectual property. SCKCEN Studiecentrum voor Kernenergie Centre d'Etude de l'Energie Nucléaire Stichting van Openbaar Nut Fondation d'Utilité Publique Foundation of Public Utility Registered Office: Avenue Herrmann-Debrouxlaan 40 – BE-1160 BRUSSEL Operational Office: Boeretang 200 – BE-2400 MOL