1 LCROSS Site Selection Workshop Introduction to Workshop and Overview of Process Dr. Jennifer L. Heldmann NASA Ames Research Center / SETI Institute.

Slides:



Advertisements
Similar presentations
PROPOSED PRIORITIES FOR SCIENCE AND COLLABORATION OCTOBER 2012.
Advertisements

Jose Castellano, Daniel McNeel Dr. Paul Higbie, Dr. Boris Kiefer Department of Physics i160.photobucket.com/.../shs_moonWater-1.jpg.
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
The Lunar Reconnaissance Orbiter NASA’s Next First Step To The Moon Noah E. Petro NASA Goddard Space Flight Center May 12 th, 2009.
LCROSS Our latest mission to the surface of the Moon. Developed and managed by NASA Ames Research Center in partnership with Northrop Grumman. Goal: to.
The Lunar Reconnaissance Orbiter (LRO) is the first mission in NASA's Vision for Space Exploration, a plan to return to the moon and then to travel to.
LRO/LEND LEND 1 LCROSS Site Selection Workshop October 16 th 2006 Lunar Exploration Neutron Detector Evaluation of Potential LCROSS Impact Sites Igor Mitrofanov.
A Synergistic Strategy for Robotic and Human NEO Exploration Tom Jones Florida Institute for Human & Machine Cognition IPEWG Aug 11 1.
School of Earth and Space Exploration Existing Lunar Datasets M. S. Robinson School of Earth and Space Exploration Arizona State University.
Welcome! To The Restructured, Reconfigured, NASA Advisory Council! Introductory slide courtesy of Harrison Schmitt, NAC Chairman.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
NASA Living with a Star Program Targeted Research & Technology Steering Committee NASA HQ & LWS TR&T Update September 16, 2008 Doug Rowland On Detail to.
Lunar CRater Observation and Sensing Satellite Project LCROSS Site Selection Workshop Oct , 2006 NASA/ARC, Mountain View, California LCROSS Orbital.
2013 TAC Workshop- Social Technology New Initiatives Subcommittee Sept 2012.
LCROSS Our next mission to the surface of the Moon. Developed and managed by NASA Ames Research Center in partnership with Northrop Grumman. Goal: to.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Elliot Sefton-Nash, Matt Siegler, David Paige LRO Diviner Team Meeting – UCLA – Weds. Feb. 13th 2013 – 09:00 Thermal Extremes in South Pole PSRs (LPSC.
Why look for water? Humans exploring the Moon will need water: –Option 1: Carry it there. –Option 2: Use water that may be there already! Carrying water.
November 30, 2006 Space Telescope Science Institute Conference Scott “Doc” Horowitz Associate Administrator NASA Exploration Systems Mission Directorate.
INTERPLANETARY MATTER ON THE MOON V.V.Shevchenko Sternberg Astronomical Institute, Moscow University THE SECOND MOSCOW SOLAR SYSTEM SYMPOSIUM MOONS OF.
Polar Topographic Knowledge Prior to LCROSS Impact David E. Smith 1, Maria T. Zuber 2 1 NASA/Goddard Space Flight Center 2 Massachusetts Institute of Technology.
Potentially Hazardous Asteroids: Characterization, Atmospheric Entry and Risk Assessment 9 July 2015 Ames Research Center Moffett Field, California IAWN.
1 Lunar Reconnaissance Orbiter (LRO) Overview 4/13/2005 Craig Tooley.
Rachel Weintraub Public Affairs Officer & TV Producer NASA Goddard Space Flight Center More information:
For the last 20 years, the Jet Propulsion Laboratory has sponsored the Planetary Science Summer School (PSSS) to give faculty, postdocs, and graduate students.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
Exo-Planet Task Force (ExoPTF) Jonathan Lunine (LPL) Stephen Ridgway (NASA)
Track 1. Track 2 TRACK LIST 1.An introduction to synthetic aperture radar 2.Mini-RF on LRO 3.The moon as seen by radar 4.The search for ice 5.Conclusions.
Modern Universe Space Telescope Visions 2003 Proposal Dennis Ebbets Ball Aerospace UV Optical Space Telescope Workshop STScI February 26, 2004.
Stellar Stars: Reflections of a Center CIO James F. Williams Ames Research Center August 15, 2011.
Presented to Kepler Pre-Launch Educator Workshop January 31, 2009 Shari Asplund Discovery and New Frontiers Programs Education and Public Outreach Manager.
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
To find water, NASA 'bombs' the moon Photo Credits-
LETS Phase 3 Review 4/29/08. Agenda Team Introduction Daedalus Concept Concept of Operations Subsystem Overview Daedalus Performance Daedalus Vision Questions.
Evaluating New Candidate Landing Sites on Mars: Current orbital assets have set the new standard for data required for identifying and qualifying new Mars.
USGS DIGITAL TERRAIN MODELS AND MOSAICS FOR LMMP M. R. Rosiek, E. M. Lee, E. T. Howington-Kraus, R. L. Fergason, L. A. Weller, D. M. Galuszka, B. L. Redding,
1 Lunar Reconnaissance Orbiter (LRO) Overview CRaTER PDR 6/27/2005 Craig Tooley.
Lunar Reconnaissance Orbiter Camera (LROC) Mark Robinson, PI Arizona State University School of Earth and Space Exploration Resource Mapping Surface Operations.
America will send a new generation of explorers to the moon aboard NASA’s Orion crew exploration vehicle. After that, on to MARS!!!
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
Discoveries in Planetary Sciencehttp://dps.aas.org/education/dpsdisc/ Water Found on the Moon Analysis of lunar rocks collected by Apollo astronauts did.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
PROPOSED 2018 Joint Rover Mission Plans for Proposed 2018 NASA & ESA Joint Rover Mission Landing Site Selection Matt Golombek Mars Exploration Program.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Ground-Truth Strategy Life in the Atacama 2004 Science & Technology Workshop Edmond A. Grin NASA Ames.
Apollo 50 Lunar Mission Concept Goal: Initiate a series of lunar campaign missions, inspired by Apollo 11, to explore the potential of the Moon for science.
On The Moon. The Design Process By the year 2020 NASA plans to guild a lunar outpost capable of housing teams of astronauts for six months or more. But.
Horizon Observations Hydrogen in the top 10 cm of lunar regolith should enhance the flux of albedo protons ejected at grazing (horizontal) angles relative.
Goldstone Radar Support for LCROSS Evaluation of Impact Sites Martin Slade October 16, 2006 National Aeronautics and Space Administration Jet Propulsion.
LRO SRR LRO Mission Overview.
Proposal of Chandrayaan 1 The main person behind it was Dr. A P J Abdul Kalam Signed up by the then Prime Minister, Atal Bihari Vajpayee in 2003 It took.
Lunar CRater Observation and Sensing Satellite Project Jennifer Heldmann LCROSS Observation Campaign Coordinator NASA Ames Research Center February 29,
SHOEMAKER CRATER – GOING WHERE WE CAN “SEE” Carlton Allen NASA JSC.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
NASA’s Goddard Space Flight Center LRO SRR LRO Mission Level 1 Requirements.
An inspirational space mission we can all be part of!
Lunar Surface Atmosphere Spectrometer (LSAS) Objectives: The instrument LSAS is designed to study the composition and structure of the Lunar atmosphere.
Study Overview Gravitational Waves Architecting Study Workshop December 20, Ken Anderson (Study Manager)
LUNAR MISSION TO CELEBRATE THE 50 TH ANNIVERSARY OF THE APOLLO LANDING 1.
ISRO – NASA Space Science Co-operation S.Seetha Programme Director, Space Sciene Programme Office, ISRO HQ & Co-Chair-INMWG Meeting on 24 th Feb 2016 at.
Mission: Moon!. What is it like on the Moon? Length of Day Atmosphere Temperature Water Radiation Gravity Landscape.
Ice At the Moon - How the Moon Mineralogy Mapper on Chandrayaan-1 Will Help Noah E. Petro NASA Goddard Space Flight Center March 4 th, 2009.
Lunar CRater Observation and Sensing Satellite Project LCROSS Astronomer Workshop Feb. 29, 2008 NASA/ARC, Mountain View, California Mission Design & Observation.
Preparation of the Self-Study and Documentation
ATom data management plan:
Lunar Reconnaissance Orbiter Camera
EO4WEF Community Activity
Lunar Reconnaissance Orbiter (LRO)
Afternoon Agenda Space Community Overview Constellation Overview
Presentation transcript:

1 LCROSS Site Selection Workshop Introduction to Workshop and Overview of Process Dr. Jennifer L. Heldmann NASA Ames Research Center / SETI Institute

2 Purpose and Scope The primary objective of the LCROSS mission is to help advance the Vision for Space Exploration by investigating the presence of water on the Moon. LCROSS : 1) is a co-manifested payload launching with LRO in October ) will use the impact of its upper stage launch vehicle to enable a monitoring spacecraft following closely behind to study the composition of lunar regolith in a permanently shadowed region. 3) will produce an ejecta cloud to be imaged and studied in detail spectroscopically in order to directly measure the concentration of water and to characterize other physical and compositional properties of permanently shadowed lunar regolith.

3 Target Selection LCROSS Targeting Criteria: The LCROSS targeting requirement [which flows down from the Level 2 requirement (owned by LPRP*)] to impact Shackleton, is +/- 10 km, but we anticipate a capability of +/- 5 km given the current lunar geodetic map. * LPRP = Lunar Precursor and Robotic Program, NASA Marshall Space Flight Center.

4 Target Selection LCROSS Targeting Criteria: The LCROSS targeting requirement [which flows down from the Level 2 requirement (owned by LPRP)] to impact Shackleton, is +/- 10 km, but we anticipate a capability of +/- 5 km given the current lunar geodetic map. The impact shall occur : poleward of 70° latitude at either lunar pole. in a region of permanent shadow in a region on the lunar nearside such that the impact plume is observable to ground-based observatories and Earth-orbiting assets

5 Process All members of the scientific community have been invited to present their recommendations for potential LCROSS impact sites. Workshop agenda finalized by Science Organizing Committee: SOC: Dr. Jennifer L. Heldmann (NASA ARC, LCROSS Science Team, Obs. Campaign Coordinator) Dr. Tony Colaprete (NASA ARC, LCROSS PI) Dr. Geoffrey Briggs (NASA ARC, LCROSS Deputy PI) Dr. Don Korycansky (UC Santa Cruz, LCROSS Science Team) Dr. Peter Schultz (Brown Univ., LCROSS Science Team) Each proposed site will be discussed in an open forum (ample opportunity during today’s Workshop for discussion).

6 Process LCROSS Site Selection Committee Dr. Peter Schultz (Brown University, LCROSS Project) Dr. Ben Bussey (APL, LPRP) Dr. Richard Elphic (Los Alamos Nat’l Lab, LP Neutron Expert) Dr. David Paige (UCLA, LRO Instrument PI) Dr. Jeffrey Moore (NASA ARC, Lunar Science) Dr. Christopher McKay (NASA ARC, Constellation Office)

7 Process Site Selection Committee (based on inputs from this Workshop) will provide an assessment of the best place(s) to impact. Site Selection Committee provides list of site(s) and rationale for each site to the LCROSS Project. Recommendations are due November 22, 2006.

8 Process Site Selection Committee (based on inputs from this Workshop) will provide an assessment of the best place(s) to impact. Site Selection Committee provides list of site(s) and rationale for each site to the LCROSS Project. Recommendations are due November 22, Then the Project will determine the impact to the Project for the recommended site(s). The Project then provides NASA Headquarters and LPRP the candidate site(s) along with the impact to the Project for each site. NASA HQ and LPRP make the final site selection decision.

9 Process Baseline impact site (listed in LCROSS Requirements document) is Shackleton Crater.

10 Process The Site Selection Committee will remain intact to provide further recommendations (if applicable) based on the acquisition of additional lunar data prior to the LCROSS impact.

11 Meeting Logistics All presentations in Conference Center Ballroom. Wireless login and password: See paper inserted behind your nametag. Food and drink on back table in Ballroom - please help yourself! Lunch will be off-site (recommend Castro Street, downtown Mountain View). Afternoon presenters: Please bring me your presentations sometime during the lunch break and we will load onto our laptop. Meeting ends promptly at 5:00 p.m.

12