Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model.

Slides:



Advertisements
Similar presentations
Jean-Michel Glachant & Sergio Ascari Florence School of Regulation
Advertisements

Safeguarding Investments In Gas Infrastructure Informal lecture Agency for the Cooperation of Energy Regulators, ACER - By Tim Boersma.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Completing the EU internal energy market
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Number of players The number of players at wholesale level is very limited (more then 97% of sources /production + import/ in one /incumbent/ hand) New.
Zone Merger – learning from experience and developing an evidential based approach Target Model Workshop 3, London 11 April 2011 Nigel Sisman Senior Adviser.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Walter Boltz, Chair of ERGEG Gas Working Group 1 st workshop, Vienna, 3 December 2010 CEER vision for European gas target model.
Gas Regional Initiative North West Region - Gas Target Model - BNetzA/Ofgem Pre-Comitology Meeting Bonn – 26 May 2011.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Dr. Stefanie Neveling Bundesnetzagentur (Federal Network Agency), Head of Section „Access to Gas Transmission Networks and International Gas Trading” Problems.
10 th SG Meeting, GRI SSE Milano, 5 May 2011 GRI South South-East Region.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Impact of Liberalization of the Electricity Market on Energy Efficiency, Quality of Supply and Environmental Performance Eric BONNEVILLE ECI Webconference.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
Electricity trading in emerging markets Vienna Economic Forum Tirana, Albania 8-9 June 08 1 EXAA 2008.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
4 th SAP Meeting, GRI SSE Milano, 4 May 2011 GRI South South-East Region.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
European Federation of Energy Traders 1 Brussels, 22 September 2009 Implementing the 3 rd EU Energy package Colin Lyle, EFET Gas Committee Chairman
Regulatory and development framework: the key role of TSO cooperation Sopot, November 28 th, 2011 Hervé MIGNON RTE (France)
Biomethane and the European gas infrastructure EBA Workshop 3 September 2015 Thierry Deschuyteneer Executive Secretary.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Improvement of transparency of regional Virtual Trading Points in SSE
Storage users in entry/exit regimes suffer from double charges for transmission
Background and Process
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Andrius Šimkus │ Energy Community Secretariat Tbilisi, 5 October 2018
Improvement of transparency of regional Virtual Trading Points in SSE
29th April 2014 Teleconference
Gas balancing – where next
Improvement of transparency of regional Virtual Trading Points in SSE
Eurogas Views on a Conceptual European Gas Market Model
Walter Boltz Chairman, CEER Gas Working Group
International Energy Conference Energy Security of South East Europe and the National Security A view on gas market liberation Sofia – June 15th,2018.
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Improvement of transparency of regional Virtual Trading Points in SSE
ERGEG comment to KEMA study on Art. 3 and 7
Presentation transcript:

Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model

2GTM Workshop in London, 11 April 2011 Internal EU gas market What do we want to achieve? Internal EU gas market How we want to achieve this? First we need to enable functioning wholesale markets (“markets”), where they do not exist yet. As second step we need to connect these markets better to move forward to an integrated market. Basic conditions need to be established in all countries No one size fits all solution possible

3GTM Workshop in London, 11 April 2011 Overview of the MECO-S model for EU gas market integration Improve effectiveness by realising economic pipeline investments MECO-S Model Pillar 1: Enable functioning wholesale markets Pillar 2: Tightly connect markets Pillar 3: Enable secure supply patterns Pillar 1: Structuring network access to the European gas grid in a way that enables functioning wholesale markets so that every European final customer is easily accessible from such a market. Pillar 2: Fostering short and mid-term price alignment between the functioning wholesale markets by tightly connecting the markets through facilitating cross-market supply and trading and potentially implementing market coupling as far as the (at any time) given infrastructure allows. Pillar 3: Enabling the establishment of secure supply patterns to the functioning wholesale markets. Foundation: Improving the effectiveness of pillars 1 to 3 by making sure that economic investments in pipelines are realised.

4GTM Workshop in London, 11 April 2011 Where do we have functioning wholesale markets yet? Depending on the definition applied between 1 and 5 functioning gas markets exist in Europe today! Shall we strive to create 25 functioning gas markets? Will this foster competition in the retail markets? Would the German gas market have developed the same if we had not reduced the number of zones (~20) by merging them? Would the French gas market have developed the same if we had not reduced the number of zones (5) by merging them? Can markets be enabled without liquidity only via better connection?

5GTM Workshop in London, 11 April 2011 How to enable functioning wholesale markets? Different pictures all over Europe call for different approaches which are not mutually exclusive If a country is capable of establishing a functioning market itself the establishment of one (or two, based on C/B analysis) zone within this country is important (e.g. GB, Germany, France, Spain); If a country is not capable of establishing a functioning market itself (e.g. due to lack of liquidity or size) Cross-border market areas (full merger) is one solution; or Accession to a larger, already functioning market; or Trading Regions – a single cross-border zone for wholesale markets with congestion-free interconnection to national end- user zones.

6GTM Workshop in London, 11 April 2011 The Market Area Model Features: One virtual point for wholesale trading Fully integrated wholesale market One balancing zone from import points to final customers Full integration of DSO networks Single set of balancing rules Single balancing entity Symbols Virtual point of the market area serving as the sole marketplace of the market area Entry or exit contract Exit contract Market Area A Country A Country B Market Area AB Cross- border market area National market area VP Final customers (A)Final customers (B) VP Final customers (A) VP

7GTM Workshop in London, 11 April 2011 The Trading Region Model Country ACountry B Trading Region AB End user zone A End user zone B Final customers (A)Final customers (B) VP Legend and Symbols End user zone = National balancing zone for national final customers, no matter the system (distribution or transmission) they are connected to Trading Region AB = Cross-border entry/exit system including all nominated points on the transmission systems of countries A and B Entry or exit contract Exit contract Virtual point of the trading region serving as the sole marketplace of the trading region and all attached end user zones. Shifting of gas between trading region and end user zone is done by nominating a virtual exit on the VP. VP Features: One virtual point for wholesale trading Fully integrated wholesale market Trading region is basically kept free of imbalances Final customers are balanced in national end user zones that may reflect national specifics End-user balancing may be done by national balancing entity Congestion-free interconnection between trading region and end user zones through the common virtual point (  virtual exit to end user zone)

8GTM Workshop in London, 11 April 2011 What needs to be done in all approaches? Prerequisite for merging market areas and creating trading regions: Absence or at least limited physical congestion As soon as we are talking about cross-border integration the following issues have to be analysed Entry / Exit Tariffication Redistribution of revenues and costs Alignment of regulatory framework Investments TSO as well as NRA cooperation

9GTM Workshop in London, 11 April 2011 MECO-S Model: Architecture at Large Legend and Symbols Hub to Hub capacity product and potentially market coupling Virtual point. VP Country ECountry F Trading Region EF End user zone EEnd user zone F Country CCountry D Market Area CD Market Area A Country A Market Area B Country B VP

10GTM Workshop in London, 11 April 2011 Common position of European gas industry associations on multi-system operation of TSOs

11GTM Workshop in London, 11 April 2011 The second step: connecting markets Connecting markets means price alignment between functioning markets and thereby driving market efficiency and public welfare on a European scale Connecting markets can happen at different timescales, e.g. short-term implicit auctions.

12GTM Workshop in London, 11 April 2011 Thank you for your attention!