BERNARD PRICE Certified Professional Logistician Supportability Optimization to Achieve Availability Goals in Acquisitions.

Slides:



Advertisements
Similar presentations
Maintenance Philosophy Single spares storage warehouse? – Assumed to be the case Multiple spares storage warehouses? –If so, each will need to be equally.
Advertisements

Bernard Price Certified Professional Logistician Supply Management & Model Theory.

Department of Defense Supply Chain Material Management Regulation DOD R 23 May 2003 Office of the Deputy Undersecretary of Defense for Logistics.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1 Follow Up Items  What are Unbalanced Bids?  What are Best Value Contracts?  Analysis of Contract Approval Limits.
Chapter 13: Learning Objectives
Chapter 13 Inventory Management
Chapter 13 Inventory Management McGraw-Hill/Irwin
Advanced Forecasting & Procurement for Microsoft Dynamics NAV Presented to ABC Annual Conference 2011 May 12, 2011.
ITIL: Service Transition
Periodic inventory models – single level  The objective is to minimize holding and backlog costs.  Unsatisfied demand is backlogged  Holding and backlog.
Stracener_EMIS 7305/5305_Spr08_ System Availability Modeling & Analysis Case Studies Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering.
Fall Product Support Conference Hilton Head, SC November 7-9, 2005 Session #2: PBL Success Stories and Challenges Speaker Name: Steve Blessing,
22 Nov 05 OSD TLCSM Memo Containing PBL Performance Metrics Operational Availability Mission Reliability Logistics Response Time Total Life Cycle Cost.
Inventory Models  3 Models with Deterministic Demand Model 1: Regular EOQ Model Model 2: EOQ with Backorder Model 3: EPQ with Production  2 Models with.
Purchasing Fundamentals & Role Integration with MM in today context H.A. Nuwan Amila Index No. GDPSCM 12-15/27.
1 MODULE 2 Strategic and Operational Management in Public Sector Chief Information Officers (CIO)
Economic Aspects of Information Systems Updated 2015 MIS 2000 Information Systems for Management Instructor: Bob Travica.
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
Server Virtualization: Navy Network Operations Centers
9/10/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.
DEPOT AND ITEM LEVEL BUSINESS CASE ANALYSIS (BCA) & TOOL Bernard Price Certified Professional Logistician.
From Research Prototype to Production
CHAPTER 7 INVENTORY MANAGEMENT
Inventory/Purchasing Questions
Stracener_EMIS 7305/5305_Spr08_ Supply Chain Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305 Systems Reliability,
© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
10/25/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
RELATIONSHIPS OF RELIABILITY, AVAILABILITY & MAINTAINABILITY (RAM) TO OPERATIONAL READINESS & SUPPORTABILITY Bernard Price Certified Professional Logistician.
Inventory Decisions. What are Inventories? Stockpiles of raw materials, supplies, components, work in process, and finished goods. Appear at numerous.
Excellence in Analysis AMSAA AMC - Essential in Peace, Indispensable in War 14 April 2004 Stryker Supply and Maintenance Contractor vs Organic Logistics.
Module 2 Managing Material flow. Inventory Management 5.
1 Chapter 6 –Inventory Management Policies Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
INTEGRATING RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SUPPORTABILITY IN REQUIREMENTS Bernard Price Certified Professional Logistician ACHIEVING.
CAMELOT Coordination Analysis Motivation Execution Logistics Tracking.
Fully integrated AX module
Real-time management of inventory for items Inventory Concept LOGISTIC & WAREHOUSING.
I2 U Intelligent Supply Chain Management Course Module Seven: Inventory Planning.
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
© 2012 Pearson Prentice Hall. All rights reserved. Using Costs in Decision Making Chapter 3.
Capacity Planning Pertemuan 04
Inventory Management The goal of effective inventory management is to “meet or exceed your customers’ expectations of product availability with the amount.
Quantity Discount Economic Order Quantity (EOQ) Analysis Tools Bernard Price Certified Professional Logistician.
Computerized Beer Game
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
Recoverable Service Parts Inventory Problems -Ibrahim Mohammed IE 2079.
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
ITIL: Service Transition
Procurement- Lecture 3 Customer service and logistics
The Level of Repair Analysis
Key Enhancements Overview
Inventory Optimization-Introduction
Key Principles of Multi-Echelon Optimization (MEO)
BERNARD PRICE Certified Professional Logistician
Certified Professional Logistician
ACHIEVING A SYSTEM OPERATIONAL AVAILABILITY REQUIREMENT (ASOAR) MODEL
Certified Professional Logistician
Supply Management & Model Theory Certified Professional Logistician
Jerry-Ann L. Oluya BEN-32.   Scheduling is to establish the timing of the use of equipment, facilities, and human activities in an organization. The.
Topic 6 – Logistics and Supply Chain Management
BUSINESS CASE ANALYSIS (BCA) & TOOL Certified Professional Logistician
22 Nov 05 OSD TLCSM Memo Containing PBL Performance Metrics
 1. Go to the following address on the Internet:
CAMELOT Coordination Analysis Motivation Execution Logistics Tracking
Managerial Accounting 2002e
Capacity Planning For Products and Services
Presentation transcript:

BERNARD PRICE Certified Professional Logistician Supportability Optimization to Achieve Availability Goals in Acquisitions

Achieving a System Operational Availability Requirement (ASOAR) Model Optimally Allocates System Ao to an End Item Ao goal for the End Item Being Acquired Integrated Macro-Level RAM and Supportability Analysis to Help Generate Early-On Requirements Considers End Item Redundancy and Floats, Periodic Maintenance Actions, and Reliability of Other End Items In System in Ao Goal Determines Ao Inputs to Use in Supportability Optimization Models Drawback – Today Only DCSOPS Systems Analysis can Run ASOAR

System Supportability Optimization Modeling to Operational Availability SYSTEM Ao/ READINESS RATE REQUIREMENT END ITEM Ao GOAL LEAST COST MAINTENANCE CONCEPT FOR LRUs & SRUs LEAST COST SPARING MIX FOR LRUs & SRUs ASOAR COMPASS SESAME MAINTENANCE OPTIMIZATION SUPPLY OPTIMIZATION OPTIMAL ALLOCATION OF OPERATIONAL AVAILABILITY (Ao)

Multi-Echelon Multi-Indenture Logistics Chain Support Effectiveness Optimization End Item

LRU Cost to Failure Rate to Down Time Ratios Without LRU Spares are Compared (COST x MCTBF / CWT) LRUs with Lowest Ratios are Spared Forward First Sparing Lowers CWT to Increase Ratio for Next Spare The LRU Sparing Increase Stops When the Product of LRU Availabilities Equal the End Item Ao Target LRUs with a Ratio Higher Than the Final Ratio Meeting the Ao Target Will Not be Spared Sparing to Availability Concept Optimization Heuristic

GIVEN: LRU2 COSTS 20 TIMES MORE THAN LRU1 LRU2 HAS TWICE THE FAILURE RATE OF LRU1 WITHOUT SPARES, THEIR CUSTOMER WAIT TIMES ARE SIMILAR CONCLUSION: DUE TO HALF THE FAILURE FREQUENCY AND EQUAL DOWN TIME PER FAILURE, LRU1 IS HALF AS IMPORTANT FOR REDUCING DOWN TIME SINCE LRU1 COSTS 20 TIMES LESS, THE FIRST SPARE OF LRU1 YIELDS APPROXIMATELY 10 TIMES LESS COST PER UNIT REDUCTION OF SYSTEM DOWN TIME (1/2 X 20 = 10) ALTHOUGH LRU2 FAILS MORE, IT IS LESS COST EFFECTIVE TO SPARE IF THE CWT ASSOCIATED TO LRU2 WERE 10 TIMES GREATER THAN LRU1, THE SPARING COSTS PER REDUCTION IN SYSTEM DOWN TIME BECOMES APPROXIMATELY EQUAL Sparing Optimization Example

Sparing to Availability vs Demand Support Sparing Provisioning Model Applied To All Items Demand Support Sparing Computation System Availability Stock Cost (Million $)

System Availability (%) Stock Cost (Million $) Provisioning Model Applied To All Items One Each of All Essential Items Spared at Each Organizational Level Sparing to Availability is Better than Sparing All Essential LRUs

Multi-Echelon Sparing Optimization to Ao Requirement Total Stock to Achieve Ao Goal Total Second Echelon Stockage Total Forward Level Stockage Sparing Cost A2 Goal Stock Availability At Second Echelon Supply Level (A2) MinCost

SESAME Selected Essential-item Stock to Availability Method Supply Chain Mission is to Support Operational Readiness & Performance Emphasis on Budgeting & Stocking to Achieve System Ao Performance Goals at Least Cost Decision Support Tool with Cost as a Major Factor in Sparing to Reduce Risk of Procuring Wrong Parts Identifies Initial Provisioning Requirements Prior to Production

SESAME Usefulness Optimizes Multi-Echelon Retail Level Initial Sparing to Achieve End Item Ao Requirement or a Procurement $, Weight or Volume Goal -OR- Optimizes Plus Up Sparing to Achieve End Item Ao Given the Present Retail Level Sparing Mix -OR- Evaluates End Item Ao Based on Sparing Mix, LRU Reliabilities and Logistics Response Times Maintenance Concept for each Essential Item is Proposed or Known

Evaluation: Evaluate Stock Levels in terms of A O - Existing stock in inventory - Vendor Recommendation Operational Performance Optimization: Determine Least Cost Mix of Spares that will meet Target A O Plus-Up: Augment Existing Stock Levels - to meet Target A O - Optimal increase “How much should I budget to meet my A O target?” “How good is the contractor’s recommendation?” “Given that my stock levels won’t meet my A O target, How should I augment them?” Decision Support Tools Budget Constraint Optimization: Determine maximum A O that can be achieved given a fixed spares budget “How much A O can I buy with my budget?” SESAME Execution Modes

SESAME Outputs Summary Data: Ao vs. $ Graph and Table Budget at Each Retail Support Echelon Budget Requirement by Year Initial Retail Support Spares Depot Pipeline Spares Consumption Spares Sparing for Each Unit at Each Echelon: Stock Quantities of Each Item Item Cost Contributions

End Item Level Inputs Ao or $ Goal to Optimize -or- LRU Sparing Mix to Evaluate Ao End Item MCTBF (Applies only when not computed by the addition of serially configured LRU failure rates) Number of End Items Fielded Each Year for Each Forward Support Level (Org or DS Unit may be Lowest Level modeled) Number of Lower Level Units Supported by Higher Level Unit For 2 level supply, Org or DS level and GS Level do not apply For 3 level supply, Org or GS Level do not apply Number of Clones Each Year for Each Applicable Unit Copies with same number of end items & Support Structure Saves inputting repetitive information Typically Contractor Input Typically a Government Input

Critical LRU Level Inputs Average Maintenance Time Parameters Time to Restore End Item if Spares in PLL, or ASL when no PLL Repair Cycle Time (Retrograde Ship Time + Turnaround Time ) Average Supply System Parameters Order & Ship Times to PLL and to ASL by Theater Wholesale/Depot Level LRU Stock Availability Time for Wholesale/Depot Level to Fill Backorders Data Needed for Each LRU Failure Factors (Annual Removals per 100 End Item) Average Procurement Cost Maintenance Concept (% Thrown Away & % Repaired Where) Typically a Contractor Input Typically a Government Input Input may come from Government or Contractor

FACTORS TECHNICAL COST/PRICE PRAG MANAGEMENT SUBFACTOR CONTRACT COSTS/PRICES COST REALISM (if not Fixed Price) SPT IMPROVEMENT PLAN DATA SHARING PLAN OP AVAIL* TECHNICAL INPUT RISK FACTORS SUPPORT INPUT RISK FACTORS * EVALUATION RESULTS IN AN ADJECTIVAL RATING FOR QUANTITATIVE THRESHOLDS SUPPORT- ABILITY Evaluation Plan with Supportability in Competitive Solicitations

Optional Evaluation Plan with Supportability FACTORS TECHNICAL COST/PRICE PRAG MANAGEMENT SUBFACTOR CONTRACT COSTS/PRICES COST REALISM (if not Fixed Price) SPT IMPROVEMENT PLAN DATA SHARING PLAN OP AVAIL* * EVALUATION RESULTS IN AN ADJECTIVAL RATING FOR QUANTITATIVE THRESHOLDS CONTRACTOR DESIGN INPUT FACTORS SUPPORT INPUT FACTORS FROM GOVERNMENT & CONTRACTOR

COMPASS Usefulness Optimizes Maintenance Concepts (Level of Repair Analysis) to Achieve an End Item Ao/Readiness Requirement at Lowest Total Support Cost Compares Similar Maintenance Level Alternatives (Source of Repair Analysis) for Best Value Evaluates Design Breakdown Impacts to RAM Related Logistics Support Costs Supply Sparing Mix Optimization to End Item Ao is Embedded

Maintenance (TMDE, etc.) Supply Support (Spares) Level of Repair Decisions Source of Repair Decisions Model Objective

Outputs Maintenance Policy Where: Org, Intermediate, Depot, Contractor, Discard How: ATE, Common TMDE, Special TMDE Initial Provisioning Net Present Value Costs AoAo COMPASS Outputs

Net Present Value Costs Estimated Initial Provisioning Consumption (Replenishment) Spares Inventory Holding Transportation (Shipping spares back and forth) Requisition Cataloging Enter and maintain line on PLL/ASL Common Labor Screening Documentation Test Program Set Development & Maintenance Contractor Variable per repair costs Fixed costs Contact Team Common Test Equipment Special Test Equipment Special Repairmen

A o Target & Maintenance Concept if not optimized Total Number of Systems Fielded Operating Hours per Year & MTBF if not computed Support Structure Number of Sites at Each Maintenance Level Order and Ship Times to Each Retail Support Level MTTR & Restoral Time if DS is forward supply General Cost Parameters Shipping Cataloging, Bin, Inventory Holding Cost % Typically a Contractor Input Typically a Government Input Input may come from Government or Contractor End Item Level Inputs

Critical Inputs LRU/SRU Level Hardware Failure Rate False Pull Rate Repair & Screening to Replenish Stock Turnaround Time Labor Time Labor Rate Contractor Repair if Repair & Return Used Setup Costs Response Time Typically a Contractor Input Typically a Government Input Input may come from Government or Contractor LRU/SRU Level Inputs Unit Price Washout Rate Material Cost Support Equipment/TPS Tech Manual Cost Cost per Repair Cost per False Pull

Equipment Breakdown Failure Mode 1: LRU1SRU1 Failure Mode 2: LRU1SRU2 Failure Mode 3: LRU1SRU3 Failure Mode 4: LRU2SRU3 Failure Mode 5: LRU2SRU4 End Item LRU1LRU2 SRU1SRU2SRU3SRU3SRU4 Equipment Breakdown

RAM REQUIREMENTS EVALUATION SOURCE SELECTION EVAL WITH LRU DATA OPTIMUM SUPPORT PRIOR TO FIELDING FIELD OR TEST DATA EVALUATION - Applicable Tool - Supplemental Tool Use of Models Optimizing to Ao Requirements/Goals