SCT/Pixel Off-detector VCSELs

Slides:



Advertisements
Similar presentations
Electrical and thermal testing at Glasgow and Liverpool.
Advertisements

2003/04/071 Characteristic of 850-nm InGaAs/AlGaAs Vertical-Cavity Surface-Emitting Lasers Master’s thesis of Yuni Chang Speaker:Han-Yi Chu National Changhua.
S Digital Communication Systems Fiber-optic Communications - Supplementary.
PACS IIDR 01/02 Mar 2001 Photoconductor Detector Arrays1 Photoconductor Detector Arrays for PAC S IIDR - ESTEC Stefan Kraft ANTEC-GmbH Germany Günter.
IEEE10/NSS R. Kass N A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State.
Early Results from the COS Time-Dependent Spectroscopic Sensitivity Programs Rachel Osten TIPS presentation, Jan. 21, 2010.
1 Alan Barr, UCL Fixed Frequency Trigger Veto The problem: –Currents in wire bonds in presence of strong magnetic fields –DC current not a problem (small.
Detector lecturesT. Weidberg1 Opto-electronics Why use opto-electronics –General advantages –HEP experiments Elements of system –Emitters –Fibres –Receivers.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Wire and rod drawing.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
VCSEL Failures in ATLAS T. Flick, University of Wuppertal TWEPP 2010 Aachen,
LightABLE Production Status ID Week October 2014 Tony Weidberg1.
DPF 2013 R. Kass 1 P. Buchholz, M. Ziolkowski Universität Siegen OUTLINE Lessons learned… IBL/nSQP opto-board overview assembly experience radiation hardness.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
ATLAS Radiation Monitor integrating monitor integrating monitor Igor Mandić, Vladimir Cindro, Andrej Gorišek, Gregor Kramberger, Marko Mikuž, Marko Zavrtanik.
Optical Link Budget ECE 4006 Gb Ethernet Optoelectronic Links.
Status of the PiN diodes irradiation tests B. Abi( OSU), R. Boyd (OU), P. Skubic (OU), F. Rizatdinova (OSU), K.K. Gan (Ohio State U.)
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
K.K. GanUS ATLAS Review1 Optical Hybrids K.K. Gan The Ohio State University WBS
STATUS OF VCSEL BASED OPTO-LINKS JOSHUA MOSS, JENS DOPKE AUGUST 19, 2010 On-going analysis for the on-detector Pixel VCSELs TEMPERATURE MEASUREMENTS OPTICAL.
in non-hermetic 85/85 condition
Monitoring of FHEP Teacher Research Internship Fermilab – Summer 2011.
October 29-30, 2001MEIDEX - Crew Tutorial - Calibration F - 1 MEIDEX – Crew Tutorial Calibration of IMC-201 Adam D. Devir, MEIDEX Payload Manager.
S.Hou, Academia Sinica Taiwan. 2Outline Optical links for ATLAS Laser-driver  fiber  PIN-driver LHC modules in service Rad-hard requirement for LHC/SLHC.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Optical Links CERN Versatile Link Project VL – Oxford involvement CERN VL+ for ATLAS/CMS phase II upgrade – Introduction and aims – Oxford workpackage:
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
AOC Performance Death rates – Channel distribution & FEA Decrease in optical power with time Summary.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
C. Issever, Oxford 1 Status of Radiation Proposal Focus on: Amendment to Proposal Radiation Protocols.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Michał Dwużnik, for the SCT collaboration
WISDOM WP6 Manufacturability, Scalability and Functionality Study Start M0, End M35 WP leader is CIP Objectives –Assessment of manufactureability of the.
July 17, 2013 CERN T. Flick University of Wuppertal.
K.K. GanUS ATLAS Pixel Meeting1 Opto-IC/Board K.K. Gan The Ohio State University WBS & 4 July 9, 2003.
New Small Wheel muon trigger optical module New Small Wheel muon trigger optical module S. Hou 2014/08/29 Academia Sinica.
1 IRL Status and Plans Kurt Francis NICADD/Northern Illinois University AHCAL MEETING DESY, Hamburg December 9, 2013.
CERN, CT Workshop, ID Week, July 2 nd, 2007 Problems and solutions during the integration. Unconformities in the detector Claudia Gemme, CERN - INFN Genova.
Tony WeidbergOpto WG April '081 SCT Links Long Term Monitoring Summary quality installed links Techniques for monitoring long term performance –Data links.
PIN current degradation Versus 3 MeV proton fluence 3 MeV proton (a)(b) (c)(d) Study of radiation damage in VCSELs and PINs for the optical links of the.
December Status of MRS photodiodes ND280 Convener’s Meeting, 9 June 2006 Yury Kudenko INR, Moscow.
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Opto Working Group Meeting Summary Tuesday 8 March 2011 Tobias Flick and Francois Vasey.
Ageing tests of VCSELs in non-hermetic 85/85 condition Ageing tests of VCSELs in non-hermetic 85/85 condition S. Hou, 2014/08/26 Academia Sinica.
Opto temperature experience in the Pixel detector C. Gemme IBL meeting, 17 March 2009.
1 Back-Of-Crate : BOC Status Oct, 2002 BOC is the optical fibre interface for the ROD Receives module control data from ROD, performs clock-data encoding,
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
SCT Links Operation Performance from QA and operation
Progress on resistor failure diagnosis Ben J ( + Matt, Zander)
Integrating part of the ATLAS Radiation Monitor will measure
ATLAS pixel module assembly flow
General overview Place : Institue of Space Astrophysic (IAS, Orsay)
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
ATLAS optical system status, VCSEL failures, analysis and mitigation
SCT On-detector VCSELs
Exoplanets: The New Science of Distant Worlds
Date of download: 11/15/2017 Copyright © ASME. All rights reserved.
Introduction to Computers
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
Failure Prediction Mechanism for Pluggable Optical Interconnect at Facebook Data Centers
Update of US Testing Status
Module Failures on RODs
ME instrument and in-orbit performance
Presentation transcript:

SCT/Pixel Off-detector VCSELs MT packaged VCSELs in BOC in USA15. Truelight VCSELs, packaged by Minglee Chu  next slide. Same package used by SCT & Pixels (some Pixels used 8 way arrays). Tony Weidberg ATLAS VCSEL Meeting 19/8/10

Epoxy Epo-Tek 353ND over active surface of VCSEL Jig used for precision placement of array wrt guide pins  purely passive alignment MT-connector inside Infineon housing with spring Tony Weidberg ATLAS VCSEL Meeting 19/8/10

Failures Many failures with original production in 2008. Dead channels showed shifted IV curves Consistent with ESD. VCSELs are very sensitive to low level ESD (damage threshold 400V). Tony Weidberg ATLAS VCSEL Meeting 19/8/10

New Production New TXs were produced in 2009 with very much improved ESD precautions and extra ESD QA. 4 channels SCT TX failed in 2009 Early failures “delayed infant mortality” Burn-in @ 70C much lower than Truelight used, therefore early failures not surprising. Similarly there were 6 early failures for the Pixel TXs. No failures for > 6 months and then … Tony Weidberg ATLAS VCSEL Meeting 19/8/10

SCT Failure Rates Accelerating failure rate: total failures 81

Pixel Failure Rates Also see high failure rate in 2010 Total failures to date: 91 Tony Weidberg ATLAS VCSEL Meeting 19/8/10

Long Term Stability Effect of turning down TXDAC values estimated to be 3% Spikes associated with calibration runs

OSA Studies Measure optical spectra with OSA (as suggested by LAr) Define width at peak – 30 dB Very sensitive to higher order transverse modes. Widths of channels that have been operated are narrower than those that have not Look at pixel TXs which had 8 out of 12 channels operated  slide OSA is a diagnostic tool for detecting damage before power falls. Tony Weidberg ATLAS VCSEL Meeting 19/8/10

Tony Weidberg ATLAS VCSEL Meeting 19/8/10

Possible Causes of Failure (1) ESD (not so likely) EoS Special PCBs to monitor spikes on VDD installed in RODs in USA15. No confirmed spikes seen, VDD looks very clean. Temperature IR camera and OSA measurements. VCSEL T does not appear to be very high, can’t explain failure rates. VCSEL or package Tony Weidberg ATLAS VCSEL Meeting 19/8/10

Possible Causes of Failure (2) VCSEL Truelight VCSEL array was modified to obtain increased power by thinning the top DBR Gives lower reflectivity  higher threshold and higher slope efficiency  higher power at 10 mA. Device could be more sensitive to oxidation? Might explain damage growing from outside of oxdide aperture towards inside, hence loss of higher order modes and narrower spectra. Tony Weidberg ATLAS VCSEL Meeting 19/8/10

Possible Causes of Failure (3) Packaging Damage from wire bonding Standard gold wire bond process used Epoxy on VCSEL surface causing strain? Infineon spring exerting force on VCSEL and causing damage to lattice? Tony Weidberg ATLAS VCSEL Meeting 19/8/10

Ongoing Studies OSA for VCSELs on TXs with failed channels and old production TXs. LAr found narrow spectra was good indicator for OTx failures. Look at more failed TXs and compare with new production TX spares. EOS Monitoring Continue long term monitoring to detect rare events. Tony Weidberg ATLAS VCSEL Meeting 19/8/10

Alternative Manufacturer Perform accelerated aging test of AOC VCSELs 10 MT coupled AOC VCSEL arrays packaged by K.K. Gan. Operate in environmental chamber at 70C. Power 80 channels at 10 mA and measure pin currents. Tony Weidberg ATLAS VCSEL Meeting 19/8/10

AOC Lifetime Tests Environmental chamber T=70C VCSEL arrays on plug-in PCBs 10 mA DC drive current. Readout hfe photodiodes readout via ELMBs. Started 4/6/10 no failures so far Will perform OSA analysis on all channels and on reference array

OSA Studies Use OSA as a diagnostic tool to identify damage early before devices die. Minglee will run stress tests for Truelight arrays with Array with Infineon connector Array with MT w/o Infineon connector Array w/o glue on surface Periodical test with OSA to look for spectral narrowing Run at RT and 70C. First indications are that spectral narrowing can be observed after ~ 2 weeks  these tests should soon determine the cause of the failures. Tony Weidberg ATLAS VCSEL Meeting 19/8/10

Strategy Make spare TXs with current design as quickly as possible. Reuse old production for (2nd class) spares. Understand problem and make new and better TXs to be installed during 2011 shutdown. Tony Weidberg ATLAS VCSEL Meeting 19/8/10