Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.

Slides:



Advertisements
Similar presentations
Overview of the GlueX Tagger and Photon Beamline..
Advertisements

The Physics of Nuclei, Nuclear Matter and Nucleosynthesis Report of the Nuclear Physics Advisory Panel.
12GeV Project CD-4 Leigh Harwood Associate Project Manager Accelerator Systems.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Future Sino-US Collaboration in QCD Phyics Ten-Year Anniversary of STAR-China Collaboration Haiyan Gao 高海燕 Duke University 1.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
Thomas Jefferson National Accelerator Facility R.. McKeown Page 1 View from Lab Management R. McKeown DNP12 Satellite Meeting October 25, 2012.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
Bob McKeown Presentation to SoLID Collaboration March 22, 2013 Jefferson Lab Update.
12 GeV Science Program R. D. McKeown JSA Science Council January 7, 2011 Thanks to A. Lung, L. Cardman, others.
UK Hadron Physics D. G. Ireland 10 October 2014 NuPECC Meeting, Edinburgh.
Questions for the Workshop. Questions as Identified on the Workshop Website 1.What is necessary to understand the elementary process of electro- production.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
J EFFERSON L AB – A N I NTRODUCTION Hugh Montgomery; May 14, 2012.
Jefferson Lab Nuclear Science Program QCD Evolution May 26, 2015 R. D. McKeown.
Thia Keppel 9/24/12. Accelerator schedule excerpts (Arne Freyberger) Accelerator Run II: Beam in hall 3/2014, or maybe as early as 1/2014 (?) > 1.1 GeV/pass,
Jefferson Lab Status APEX Meeting April 22, 2014 R. D. McKeown Deputy Director For Science.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Thomas Jefferson National Accelerator Facility R. D. McKeown Slide 1 R. D. McKeown Jefferson Lab College of William and Mary The 12 GeV Science Program.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
Overview of the GlueX Tagger and Photon Beamline..
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
SLAC, September 25, 2009 Searching for a U -boson with a positron beam Bogdan Wojtsekhowski Thomas Jefferson National Accelerator Facility  The light.
Jefferson Lab Overview Bob McKeown April 20, 2015.
Thomas Jefferson National Accelerator Facility Page 1 August 22, 2011 Jefferson Lab PAC Laboratory Overview Hugh Montgomery.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Jefferson Lab’s Enabling Technologies: A Call for Strategic Planning W. OREN JLAB Engineering Division 9 February 2012.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Anthony.
Hall A Installation Review John J. LeRose 2/25/2009.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Cost Optimization Models for SRF Linacs
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Jefferson Lab Overview
Page Headline Beam Commissioning Adam Bartnik.
Spin Precession At CEBAF
Future Trends in Nuclear Physics Computing Workshop
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Jefferson Lab Reliability Task Force and Initiatives
Alignment of the 12 GeV CEBAF Accelerator
Jefferson Lab Status Bob McKeown May 6, 2016.
CEBAF Injector Overview
Accelerator status after the 12 GeV upgrade
Introduction to Jefferson Lab
Operations Department
Preparation of the CLAS12 First Experiment Status and Time-Line
Jefferson Lab Status Bob McKeown October 21, 2015.
Operations Department
Thoughts on Energy Reach
View from Lab Management HPS Collaboration Meeting
Schedule Rolf Ent HPS Meeting, May 22, 2018.
Performance Recovery at CEBAF
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
Jefferson Lab Users Group Meeting Start of the 12 GeV Era
SOLID Collaboration Meeting
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
SNS-PPU upgrades the existing accelerator structure
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
E , Spokespersons: P. Bosted, R. Ent, E. Kinney, and H. Mkrtchyan
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Presentation transcript:

Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014

2 12 GeV Upgrade Project Scope of the project includes: Doubling the accelerator beam energy New experimental Hall and beamline Upgrades to existing Experimental Halls Maintain capability to deliver lower pass beam energies: 2.2, 4.4, 6.6…. New Hall Add arc Enhanced capabilities in existing Halls Add 5 cryomodules 20 cryomodules Upgrade arc magnets and supplies CHL upgrade Upgrade is designed to build on existing facility: vast majority of accelerator and experimental equipment have continued use The completion of the 12 GeV Upgrade of CEBAF was ranked the highest priority in the 2007 NSAC Long Range Plan.

3 16-month installation May Sept 2013 Accelerator commissioning start Oct 2013 Hall A commissioning start Feb 2014 Hall D commissioning start Oct 2014 Halls B & C commissioning start Jan/Feb 2016 Project Completion September 2017 Re-baseline Approved September 4, GeV Upgrade Project Schedule

4 12 GeV Project Highlights Hall C Hall D Hall B

5 Accelerator Commissioning Progress 1S 1R 2S 0R CHL1, CHL2 operational Linacs at 2K North Linac – 1090 MeV South LINAC – 1090 MeV CEBAF GeV Optics, Magnets great 2R KPP: machine capable of 12 GeV 1 pass at 2.2 GeV/pass for 8 hours with acceptable trip rate (50% uptime) 34 MeV 1124 MeV 2214 MeV

6 May 7, Passes 10.5 GeV Transported to Hall D Tagger Dumplet Completes CD4a Project milestone

7 Three year plan

8 Future Hypernuclear Physics at JLab A program of hypernuclear physics was proposed to the Jefferson Lab PAC40 in It was an extensive program that included measurements on: Elementary reaction p(  *,K+)  Few body systems (  N, 4  H) Medium mass nuclei (40Ca, 27Al,48Ti) Heavy nuclei: 208Pb

9 PAC Result The PAC deferred on approving the proposal, stating: “The beam time required for the full program constituted about 100 days. A significant setup time for this experiment requires both resources and significant planning. The PAC felt that the case had not yet been made for such a significant investment, and would encourage, as PAC39 had done, that the proponents work closely with the theory community to identify the most important cases for study. A future proposal should also clearly state the impact of measurements for our understanding of the  -N interactions. A careful analysis of how these sets of measurements and their uncertainties constrain nuclear theory would be of value. A dedicated Workshop focused on these questions could be very helpful. The PAC needs to see a sense of priority from the proponents.”

10 Charge to Panel Discussion It would be helpful if the workshop could provide guidance to the proponents, specifically to  Identify the most important one or two key measurements to be pursued at JLab that would provide a substantial advance in our knowledge of hypernuclear physics. These measurements could form the initial program motivating the mounting of a more extensive hypernuclear physics program at JLab.