R.Schmidt TE-MPE-PE: members of the section Michael Jonker Mike Koratzinos Rüdiger Schmidt Daniel Wollmann – from 1 st November 2011 Arjan Verweij Carlos.

Slides:



Advertisements
Similar presentations
Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013.
Advertisements

February 2009 Summary of Chamonix 09 Steve Myers.
Chubaka Producciones Presenta :.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Overview of the recommendation on LHC Splices Consolidation Frederick Bordry, head of the CERN Technology Department, has called for a series of three.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
R.Schmidt Meeting CERN-IMA Stuttgart 21/09/ Agenda 15:20 Overview of activities in the domain of reliability at CERN, incl. overview of Stuttgart.
TS, Length of YETS EYETS LIU & CONS Project
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
U.S. Department of Energy’s Office of Science 20 th Meeting of the IEA Large Tokamak ExCo, May th Meeting of the IEA Poloidal Divertor ExCo, May.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
TE- MPE PE members 1.Bernhard Auchmann; 2.Zinur Charifoulline; 3.Michael Jonker; 4.Arjan Verweij; 5.Daniel Wollmann; 6.Rüdiger Schmidt; 7.Vera Chetvertkova.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
PostMortem Workshop January LHC “Post Mortem” Workshop: Introduction Initiative by Robin Lauckner, Adriaan Rijllart and myself, helped by many other.
Eva Barbara Holzer MPP, CERN Eva Barbara Holzer 1 Approval procedure for master threshold changes.
Fabio Formenti - Feb. 25th, LHC enhanced Quench Protection System project Review committee meeting February 24 th –26 th 2009.
CSCM Project Status and Prospects Andrzej Siemko on behalf of the CSCM project core team: Mike Koratzinos, Jens Steckert, Hugues Thiessen and Arjan Verweij.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Running scenario 2009/10 Run through components – and then synthesis.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Education Thesis: Layout and design of a high accuracy magnetic field measurement system for superconducting undulators. Thesis: Phase error reduction.
E. Todesco MAGNET (RE)Training E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC risk review, 5 th March 2009 Acknowledgements:
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
LEADE Meeting, February 6 th 2006 Highlights from the Chamonix Workshop Divonne, January 2006 D. Macina TS/LEA.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Registered participants participants from outside Cern.
Agenda Reorganisation MARS Offices Staff, fellows and students
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
ICE SECTION The coolest place to be! Elias Métral
LHC Enhanced Quench Protection System Review
Safety in Construction and Upgrade Phases
Looking back on 2014 and Perspectives for the MPE Group in 2015
The LHC - Status Is COLD Is almost fully commissioned
19th Hadron Synchrotron Incoherent effects section meeting
10th Hadron Synchrotron Incoherent effects section meeting
LHC Dipole Diode Insulation Consolidation Review (I) INTRODUCTION
M.Jonker CTC MPO-WG status
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Machine Availability and Reliability Panel (MARP)
Upgrade Strategy for the Experimental Vacuum Systems
CMS Goal of the experiment
Andrzej Siemko (CERN) and Marco Zanetti (MIT)
AMICI WP1 – Management, coordination and dissemination
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
Regional Coordination Group on SDG4-Education 2030 (West and Central Africa) Retreat UNESCO Regional Office Dakar, 8 December 2016.
McDonald’s calendar 2007.
2015 January February March April May June July August September
Presentation transcript:

R.Schmidt TE-MPE-PE: members of the section Michael Jonker Mike Koratzinos Rüdiger Schmidt Daniel Wollmann – from 1 st November 2011 Arjan Verweij Carlos Omar Maidana – Fellow starting the 2 nd year on CLIC budget Emmanuele Ravaioli – Fellow in third year Sigrid Wagner – Fellow in second year Kajetan Fuchsberger - Fellow since April (…supervision by M.Zerlauth and R.Schmidt) Juan Blanco Sancho – PhD student in the 3 rd year Scott Rowan – Technical Student from June Daniel Molnar – Technical Student from February (with Arjan) Michael Galetzka - Technical Student from September (with Kajetan) Friends…. Markus Zerlauth Andrea Appolonio - Technical Student from January in BE-OP

R.Schmidt Agenda Introduction and activities Offices Drink? Technical and doctoral students Conferences / IPAC 2012 Workshop on CLIC MP Circuit screening Your contributions

R.Schmidt Overview of our activities Main themes LHC Machine Protection and operation related to beams LHC Machine Protection and operation related to magnet powering LHC understanding of the powering system LHC maximum energy – this task has been clearly given by Steve M. and CERN MAC Powering tests (“hardware commissioning”) CLIC Machine Protection related to beams ITER collaboration on machine protection (interlock systems) Other tasks: outreach, consultancy, community service, … LHC related … No beam induced accident, no beam induced quench by the circulating beam MPPr (…and MPP) panels were established and work well No quenches due to electromagnetic waves for dipole circuits

R.Schmidt Details.... Involvement in LHC machine operation and protection –related to beam – MPP and MPPr (Kajetan, Mike, Juan) –related to powering (Arjan, Emmanuele, Mike, Daniel, Scott) –understanding quenches in presence of beam (Arjan) Powering tests (Mike, Kajetan, Michael G., Arjan, Andrea) LHC maximum energy and issues with diodes: Quench propagation, CSCM (thermal amplifier, Arjan, Mike, Daniel) LHC orbit nonconformities: studies for an interlock (Kajetan, Mike) Modelling of LHC circuits and comparison with experimental data (Emmanuele, Arjan, Daniel M., Scott) Preparation for splice consolidation during shutdown (Arjan, Daniel M.) LHC hazard catalogue and dependability studies (Sigrid, Andrea) Collaboration with ITER for machine protection (Michael J., Sigrid) –Prototyping the interlocks systems –RAMS studies for the LHC and ITER protection systems HiRadMat (Juan) –calculations and preparing an experiment for shock beam impact on matter –commissioning the HiRadMat beam line CLIC machine protection (Michael J. and Carlos)

R.Schmidt Other activities Mike Koratzinos, Michael Jonker. Rüdiger Schmidt, Juan Blanco Outreach and community service (presenting CERN to the public, teachers programme) Rüdiger Schmidt CAS, Lecturing, DESY advisory committee, IPAC organising committee, presenting CERN to the public, German committee for accelerator physics Michael Jonker Deputy RSO –Work on ALARA review working group. –RSSO discussions (Radiation Safety Support Officer) Arjan Verweij TSC (Technical Student Committee), AFC (Associate + Fellows Committee) deputy for TE SIPB scientific info policy board for TE

R.Schmidt Some info… LHC operation with ions until beginning of December –Now MDs –Then technical stop –Then ion operation –The Xmas stop Evian LHC operation workshop December Chamonix LHC workshop 6-10 February 2011 LHC operation starting in February with powering tests Beam operation in March Energy likely to be 4 TeV in 2012 CSCM (thermal amplifier) tests: not yet clear, but certainly not for all machine in the Xmas Stop

R.Schmidt 7 Circuit screening Has been proposed to perform before LS1, to understand other consolidation needs Part of the work will be in our team To be discussed in detail later What about RCO, and other non- conformities?