TE- MPE PE members 1.Bernhard Auchmann; 2.Zinur Charifoulline; 3.Michael Jonker; 4.Arjan Verweij; 5.Daniel Wollmann; 6.Rüdiger Schmidt; 7.Vera Chetvertkova.

Slides:



Advertisements
Similar presentations
RRR Measurements in S23 during LS1 Emmanuele Ravaioli Daniel Rasmussen Scott Rowan Thanks to Z. Charifoulline, R. Denz, J. Steckert, H. Thiesen, A. Verweij.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Concept & architecture of the machine protection systems for FCC
A key quality attribute of a Future Circular Collider - Availability performance (RAMS) P. Sollander, Thanks to A. Apollonio, J. Gutleber, M. Lamont, P.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
TE-MPE-PE new member presentation Alejandro Fernández Navarro TE-MPE-PE TE-MPE-PE new member presentation Alejandro Fernandez 2.
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
R.Schmidt Meeting CERN-IMA Stuttgart 21/09/ Agenda 15:20 Overview of activities in the domain of reliability at CERN, incl. overview of Stuttgart.
First draft of the CLIQ test plan for the HQ2b magnet Emmanuele Ravaioli Thanks to Hugo Bajas & GianLuca Sabbi 02/05/2014.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Introduction to availability modelling in ELMAS Arto Niemi.
Beam Physics Work D.S List of Workpackages Area packages Main beam electron source (Steffen Doebert) Main beam positron source (Steffen.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
Experimental and Theoretical Study of Energy Deposition and Residual Activation Induced by Uranium Ions to Model the Beam Loss Hazards in the GSI Future.
R.Schmidt TE-MPE-PE: members of the section Michael Jonker Mike Koratzinos Rüdiger Schmidt Daniel Wollmann – from 1 st November 2011 Arjan Verweij Carlos.
CSCM type test: Diode Leads and Diodes Gerard Willering & Vincent Roger TE-MSC With thanks to Bernhard Auchmann, Zinour Charifoulline, Scott Rowan, Arjan.
Workshop on good programming style Summary Michał Maciejewski, Bernhard Auchmann, Lorenzo Bortot, Emmanuele Ravaioli, Jonas Ghini, Deepak Paudel, Arjan.
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - LMC158 Draft planning of beam induced quench tests at the end of 2013 run LHC Machine.
Eva Barbara Holzer MPP, CERN Eva Barbara Holzer 1 Approval procedure for master threshold changes.
TRACKING OF FAULTS AND FOLLOW-UP Accelerator Fault Tracking project Jakub Janczyk (TE-MPE-PE / BE-CO-DS) with input from: Andrea Apollonio, Chris Roderick,
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project 1 st Workshop FTEC 2015 Alejandro Fernandez Navarro.
TE-MPE Group Meeting 11 December /12/15 TE-MPE Annual Meeting1.
Eric Prebys/LARP 2/17/2016.  CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to.
Technical Meeting Diamond Detector Characterization in Frascati F. Burkart F. Burkart, O. Stein.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
D1/D2 Circuit Baseline Update Rationales for Baseline Discussion B. Auchmann, F. Rodriguez Mateos, A. Verweij, D. Wollmann CERN, TE-MPE.
Education Thesis: Layout and design of a high accuracy magnetic field measurement system for superconducting undulators. Thesis: Phase error reduction.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Inner Triplet Protection Strategy LHC & HL-LHC Daniel Wollmann with Inputs from B. Auchmann, G. Ambrosio, R. Denz, P. Fessia, E. Ravaioli, F. Rodrigues.
Coupling of 2D and 3D quench models Michał Maciejewski Bernhard Auchmann TE-MPE-PE
09/05/ Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project 2 nd Workshop of the Spanish Traineeship.
Registered participants participants from outside Cern.
Agenda Reorganisation MARS Offices Staff, fellows and students
Matthias Mentink Education / Job experience
Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project
Quench Simulation at GSI
STEAM Applications Part I The circuit point of view
The HL-LHC Circuits: Global View and Open Questions
Looking back on 2014 and Perspectives for the MPE Group in 2015
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
M.Jonker CTC MPO-WG status
FMEA of a CLIQ-based protection of D1
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
Machine Availability and Reliability Panel (MARP)
and Electrical Integrity Group First Plenary Group Meeting 22/01/2009
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
STPA FOR LINAC4 AVAILABILITY REQUIREMENTS
Dipole diode lead resistance measurement
Matthias Mentink Education / Job experience
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Initial Experience with the Machine Protection System for LHC
Remote setting of LHC BLM thresholds?
Agenda 9:00-10:00 Beam Interlock System Changes Following the 2006 Audit Benjamin Todd 10:00-11:00 Beam Dump System follow-up from the 2008 Audit Jan Uythoven.
Using the code QP3 to calculate quench thresholds for the MB
Andrzej Siemko (CERN) and Marco Zanetti (MIT)
Simulations of failure cases 1st STEAM Workshop June 2019
Other arguments to train two sectors to 7 TeV
Presentation transcript:

TE- MPE PE members 1.Bernhard Auchmann; 2.Zinur Charifoulline; 3.Michael Jonker; 4.Arjan Verweij; 5.Daniel Wollmann; 6.Rüdiger Schmidt; 7.Vera Chetvertkova – Fellow; 8.Lutz Hein – Fellow; 9.Daniel Egede Rasmussen – Fellow; 10.Andrea Apollonio - PhD student; 11.Florian Burkart - PhD student; 12.Emmanuele Ravaioli – PhD student; 13.Scott Rowan – PhD student; 14.Oliver Stein - PhD student; 15.Kevin Ashley Sperin - technical student; 16.Michal Maciejewski - technical student; 17.Jakub Tytus Janczyk - technical student; 18.Naeem Tahir – scientific from GSI / D associate will be with us for three months in summer

Changes… Juan Blanco …. PhD student, finished successfully his thesis and is now in Spain Has an own company and works in another company Sigrid Wagner ….Is now with General Motors, Toronto / Detroit Volkan Vatansever ….Submitted his Masters thesis last week Henri Antti Matias Riihimaki... Is back to Finland (?) Christian Buhl Soerensen... Arriving today

Changes… ……. likely to come back in January 2014 if not frozen

Back in France … what I missed 4 Bugnes Traditional receipt from central eastern France Only available around Carnival Get them in many bakeries and on the market

Agenda 5 General information Today: brief presentations of students and fellows (max 5 Minutes) Next week: presentation of different projects and activities … and a few brief presentations from those absent today

News 6 LS1 progressing well First powering tests: about August / September 2014 Beam operation LHC starting in 2015 Beam operation other accelerators starting from Spring 2014 CSCM tests in Spring / Summer on two sectors CTF3 continues to operate

Our section 7 Working on the protection of superconducting circuits incl. magnets and other elements Working on the protection from high intensity particles related Protection systems must be very reliable – therefore working on the reliability of particle accelerators

Activities in our section 8 Preparation of re-commissioning of the LHC powering system Preparation of CSCM (…thermal amplifier) Providing tools / software for magnet (circuit) protection systems and efficient commissioning Modelling of superconducting circuits (transients, quenches,..) Development of novel tools for modelling superconducting magnets (circuits), with particular attention to beam induced quenches –Tools such as PSPICE, MATLAB (Simulink), COMSOL, FLUKA, …. –Protection of Nb3Sn magnets and HTS elements in an electrical circuit CLIQ – a new method to protect superconducting magnets Preparation of beam operation (machine protection, beam related) –Calculation of “Safe Beam” thresholds Fast beam loss mechanism in LHC and their detection (diamond detectors)

Activities in our section 9 Beam induced damage and hydrodynamic tunnelling –Possibly experiments on beam induced damage of superconducting magnets Beam induced quenches, experiments and simulations at LHC Reliability of elements in the LHC beam interlock system CLIC: Machine protection, risk analysis and proposals for machine protection system, availability HL-LHC: Machine protection (work package 7 for HL-LHC) FCC: Machine protection and hydrodynamic tunnelling ITER Collaboration: building highly reliable protection systems Machine Protection Systems of Particle Accelerators: Development of Methods for Reliability Analysis with Regard to Safety and Availability –For LHC, HL-LHC, LINAC4 and ESS –Improved recording of LHC availability during operation (fault tracker project)

Roles 10 Chairing MP3 Scientific secretary of MPP Scientific secretary working group on availability Chairing MPPr Chairing BLM Threshold WG Organising / contributing to schools for accelerator physics and machine protection Others..

Outing …. ??? 11