Senior Project SR-60/Theodore St. November 14, 2014.

Slides:



Advertisements
Similar presentations
Metro DTA Workshop: August 15 th, 2012 Road Diet DTA Methodology PM 5-hr trip tables (2pm-7pm) were transposed to represent reverse directionality on network.
Advertisements

Data Collection Methods BluFax: vehicle identification using bluetooth MAC addresses – provides corridor traffic patterns (origin-destination data) and.
Statewide Mobility Performance Measures Team Meeting Webinar June 17, 2013.
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
The State Route 246 Central Avenue Ext. and Purisima Road Traffic Study May 2008.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Los Angeles County Metropolitan Transportation Authority Simulating I-710 Corridor Presented in the Western ITE Annual Meeting Santa Barbara, California.
The TRANSIMS Model: Combining Travel Demand and Microsimulation Operating Paradigms Presented to 2012 ITE District 6 Annual Meeting by John Kerenyi, P.E.,
1 Corridor System Management Plan A Case Study for the Interstate 580 in Alameda County Prepared for: 2009 Paramics Annual User Group Meeting Presented.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
North Queen Anne Neighborhood Traffic Management Plan November 2004.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
SCAG Region Heavy Duty Truck Model Southern California Region Heavy Duty Truck Model.
A GIS Approach to Pedestrian Level of Service Natalia Domarad 14th TRB Transportation Planning Applications Conference Columbus, Ohio May 5-9, 2013.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
2/27/06Michael Dixon1 CE 578 Highway Traffic Operations Lecture 16: Freeways Basic Sections.
Archived Data User Services (ADUS). ITS Produce Data The (sensor) data are used for to help take transportation management actions –Traffic control systems.
Lec 5: Capacity and LOS (Ch. 2, p.74-88)
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
Level of Service Section 4.5. Level of Service: The Basics MMeasure performance by density. RRatio of operating capacity to speed. UUnits: passenger.
October 6, :30 – 11:00. MPM Team Agenda Review of MPM program and team MAP-21 and other updates Mobility performance measures reporting On-going.
Evaluating InSync Performance in Microsimulation Aleksandar Stevanovic, PhD, PE Florida Atlantic University Transpo 2012 Bonita Springs, FL October 29,
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Roundabout Capacity Analysis Framework Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers.
Considerations when applying Paramics to Strategic Traffic Models Paramics User Group Meeting October 9 th, 2009 Presented Matthew.
Enhancing TDF Model Results Using Intersection Control Specific Delays and Turning Movement Level Matrix Estimation for a Downtown Circulation Study Presented.
Chapter 1: Highway Functions
Orem City Roundabout Feasibility Study Brigham Young University and the City of Orem Determination of available land Roundabout parameters established.
Freeway Capacity Analysis
Travel Speed Study of Urban Streets Using GPS &GIS Tom E. Sellsted City of Yakima, Washington Information Systems and Traffic.
Hcm 2010: work zones.
TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
Oregon’s Work Zone Traffic Analysis Program FHWA Work Zone Rule Virtual Workshop November 6, 2008 Irene Toews, P.E. Oregon Department of Transportation.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
2014 Freeway Congestion Monitoring Program MOITS Technical Subcommittee December 9, 2014.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice April 11, 2007.
LADOTD Statewide Traffic Engineers Meeting June 19, 2014 Traffic Signal Timing Project Update Nick J. Ferlito, Jr., P.E., PTOE Neel-Schaffer, Inc.
1 Congestion Measurement Mark Hallenbeck TRAC. 2 Historical Use of volume data –AADT –AWDT, –Hourly volumes To estimate delays Can produce a reasonable.
Regional Transportation Data Clearinghouse Update MWCOG Technical Committee 5 November 2004 Bob Griffiths, Martha Kile, Charlene Howard Department of Transportation.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Regional Traffic Signal GIS/Google Earth Introduction Many jurisdictions now use Synchro for traffic signal timing Provides opportunity for regional compilation.
Problem 4: Okeechobee Road Stopped Control Analysis.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
Chapter 9 Capacity and Level of Service for Highway Segments
Frank Farance1 Proposal for Adding Service To Roosevelt Island Frank Farance W: C: FARANCE H:
Applicability of Paths Derived in Regional Planning Models to Traffic Micro-Simulation Paul Ricotta, P.E., Caliper Corporation Jon Fricker, PhD, Purdue.
I-5 Expansion and Remodeling Analysis: City of Seattle CEE498 GIS Final Project Matt Elliott Tina Jang Justin Hughes Karina Pineda Amber Yamamoto
SR 44 at Grand Avenue Volusia County, FL River to Sea CAC/TCC Meetings May 17, 2016.
ITS Virginia Annual Conference April 20, 2012 Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other product and company.
Visit Our Website at: Click to edit Master title style.
Expertise SR 710 North Study An Evaluation of the DEIR/EIS Presentation to the City of San Gabriel City Council February 2, 2016 Leland C Dolley, Special.
1 Near-field NO 2 Impacts due to PM Traps for Diesel Engines Tony Servin, P.E. Atmospheric Modeling and Support Section Planning and Technical Support.
Case Study 4 New York State Alternate Route 7 Problem 2.
Date line +1+1 +2+2 +3+ a.m.p.m.
Summary of Traffic Conditions I210-E
The HCM and MAP-21 Performance Requirements: Opportunities
Quaker Lane & Seminary Road/ Janney’s Lane March 14, 2013
Clustering Analysis.
Current and proposed HOT facilities update
Naval Complexes Meeting April 15, 2019
Senior Project SR-60/Theodore St.
Senior Project SR-60/Theodore St.
Senior Project SR-60/Theodore St.
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Senior Project SR-60/Theodore St. November 14, 2014

Agenda Geometrics Team Updates Traffic Team Updates Existing Synchro Model 2040 Synchro Model Digital Mapping Team Updates Environmental Team Updates Media Team Updates

Geometrics Team Updates

Traffic Team Updates Existing Synchro Model 2040 Synchro Model

Existing Model  Added Freeway to model  LOS matches given Caltrans LOS  By adding truck percentages and signal timing sheets Existing Model 2040 ModelTo Do

Existing Model 2040 ModelTo Do

IDIntersectionCaltrans LOS (AM Peak Hour) Our LOS (AM Peak Hour) Caltrans LOS (PM Peak Hour) Our LOS (PM Peak Hour) 1Theodore St and Eucalyptus Ave AAAA 2Theodore St. and SR-60 EB Ramps AAAA IDIntersectionCaltrans Delay AM Peak Hour (sec/veh) Our Delay AM Peak Hour (sec/veh) Caltrans Delay PM Peak Hour (sec/veh) Our Delay PM Peak Hour (sec/veh) 1Theodore St and Eucalyptus Ave < < Theodore St. and SR-60 EB Ramps <106.1<103.2 Level of Service AM/PM (LOS) Delay AM/PM Peak Hour

2040 Model  Started modeling 2040 conditions  Not yet accurate  Projected 40% heavy vehicle volumes  Show pictures of comparison (report vs Caltrans table)  Show 2 using HCM2000 Existing Model To Do 2040 Model

What we need to do  Information we need  Future truck percentages  Zero’s and non existing segments  Are the signal timings for the 2040 no build alternative the same as existing?  Match the 2040 Model to Caltrans’ 2040 LOS values  Find out what we are missing to make our model match Existing Model 2040 ModelTo Do

Environmental Team

Digital Mapping Team Generator and Scanning Boundary GIS Map Discrepancies Why use parcel maps?

Media Team Updates