Status of work of Russian groups in the ATLAS collaboration CERN-Russia Joint Working Group October 2009 A.Zaitsev, IHEP, Protvino.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
JWG, 14 October, 2009, Vladislav Manko Status of work and plans of the Russian group in the ALICE Collaboration as of October, 2009.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
The 31 st Meeting of the CERN-Russia Committee Participation of Russian Institutions in the LHC Experiments 21 November 2009, Geneva Victor Savrin LHC.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
V.Gavrilov 1, I.Golutvin 2, V.Ilyin 3, O.Kodolova 3, V.Korenkov 2, L.Levchuk 4, E.Tikhonenko 2, S.Shmatov 2,V.Zhiltsov 2 1- Institute of Theoretical and.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
LHCb computing in Russia Ivan Korolko (ITEP Moscow) Russia-CERN JWGC, October 2005.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
CALORIMETER system for the CBM detector Ivan Korolko (ITEP Moscow) CBM Collaboration meeting, October 2004.
V.Gavrilov 1, I.Golutvin 2, V.Ilyin 3, O.Kodolova 3, V.Korenkov 2, E.Tikhonenko 2, S.Shmatov 2,V.Zhiltsov 2 1- Institute of Theoretical and Experimental.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
V.Ilyin, V.Gavrilov, O.Kodolova, V.Korenkov, E.Tikhonenko Meeting of Russia-CERN JWG on LHC computing CERN, March 14, 2007 RDMS CMS Computing.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
Russian groups in LHCb: Status report V. Egorychev CERN-Russia JWG, October 2009.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
V.Gavrilov 1, I.Golutvin 2, V.Ilyin 3, O.Kodolova 3, V.Korenkov 2, E.Tikhonenko 2, S.Shmatov 2,V.Zhiltsov 2 1- Institute of Theoretical and Experimental.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
ATLAS Tile Hadronic Calorimeter:
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
India in DØ Naba K Mondal Tata Institute, Mumbai.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
The ATLAS Tiles Hadronic Calorimeter
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
FCC-hh HCAL software goals Ana Henriques (thanks for Clement Helsens, Carlos Solans input)
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
The ATLAS Electromagnetic and Hadronic End-Cap Calorimeter in a Combined Beam Test Tamara Hughes University of Victoria WRNPPC 2004.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Why we need an improved LASER calibration system
Test Beam Request for the Semi-Digital Hadronic Calorimeter
for ATLAS data taking and data analysis
HCAL Commissioning and Related Activities
CMS ECAL Calibration and Test Beam Results
OPERETTE TEST BEAM EXPERIMENT :
Preparation of the CLAS12 First Experiment Status and Time-Line
Susan Burke, University of Arizona
Presentation transcript:

Status of work of Russian groups in the ATLAS collaboration CERN-Russia Joint Working Group October 2009 A.Zaitsev, IHEP, Protvino

Marzio Nessi

Inner detector TRT TRT commissioning and ATLAS runs: (MEPhI, PNPI, SINP MSU, LPI RUN Coordinator A.Romaniouk (MEPHI)) The major effort was dedicated to commission the entire TRT as a complete part of the ATLAS detector and prepare for stable operation with the beam. 14 combined and semi combined runs have been done during this year before start of the continues ATLAS operation. The main tasks: Minimize the number of the TRT dead channels Stopless recovery Validation of the Full-compression scheme of the TRT operation at high rate. Help to time in L1 triggers using cosmic particles. Detector alignment and calibration with cosmic particles. TRTViewer application. Gas system TRT operates with a base-line mixture (Xe/CO2/O2) in a CO2 environment. From Sept 25th TRT operates with the CO2 cooling system in a standard mode. A technique of the gas gain stabilization across the detector finalized and used as the standard operation mode of the TRT

Calorimeters LiAr BNPI TERMO project The goal of this project is the monitoring of temperature inside of LAr calorimeters. In July 2009 the codes for temperature monitoring was finally tested and implemented in ATLAS DCS. Noise measurement Special software was developed for noise measurement and monitoring in LAr end-cup calorimeters and implemented in ATLAS software. Simulation of EM end-cap calorimeter. The final version was tested inside ATHENA and approved by collaboration. ITEP Monitoring of FCal readout and HV channels: - no dead channels, only two channels with high noise, time alignment better than 2 ns Analysis of FCal testbeam data: - shower profiles: agreement with MC, performance well within requirements LPI Study of LVPS failures IHEP Beam tests of LiArg calorimeters

Calorimeters TileCal Combined runs (O.Solovyanov – run coordinator) Taken in April, May-June, Jul-August, September. Included TileCal + L1Calo + LAr + TRT + Muon system Cs scan : every 2 weeks. PMT voltage adjustments to keep gain to the level established with test beam. Test of optic fibers & scintillators. Test modules at bld 175 Fully operational LB and EB wedge. Digitizer test-bench. LVPS and ROD labs. Cs scan system. HV monitoring. Cooling. Muon scope. TileCal software Response of LB65 (in B.175) to the Cs source.

Muon detectors EEL/EES chambers: 62 pcs Number of tubes: ~ 16’128 pcs All EE chambers were equipped with electronics, certified and CR tested. Few results below: ASD noise allowed– 40kHz single tube, less 3 tubes with more than 20 kHz in singe chip; dp/dt – cut 10 mbar/day

Muon detectors EE Installation Sector 15 C Sector 13 C 5 oct Sotiris Vlachos - Athens NTU 10 chambers were installed 52 → installation at shutdown 2010 IHEP should finish preparation of remaining 52 chambers before installation

Muon detectors Commissioning

Operation tasks 14,2 FTE (Russia) 397 FTE (total) Russian contribution 3,6%

10 The prototypes of the real time ATLAS remote monitoring system are operational at Dubna and Protvino MOTIVATION Monitoring of the detector and data flows at any time Participation of the subsystem experts in the shifts and data quality checks remotely Training the shifters before they come to CERN Teaching Outreach Control Room at CERN at JINR at IHEP

Computing and software DAQ s/w commissioning and update DCS s/w commissioning and update Core s/w maintenance (Software Infrastructure Team) Distributed Data Management

Distributed Analysis Tests ATLAS RuTier-2 Four sites which intended to be used for physics data analysis participated in STEP09 exercise. The main (new activity for our sites) part of it consisted in mass data analysis. The corresponding jobs were submitted centrally with the help of GANGA robot Such type of jobs cause a very intensive data exchange between SE and WNs and not all the sites were ready to support the activity properly The aggregated results of data analysis part of STEP09 SiteefficiencyHzCPU/Wall#events IHEP90%11.039%550 M JINR35%8.628%220 M RRC-KI51%4.215%68 M PNPI10%0.85%4 M The reasons of poor results in some sites were studied and some correction procedures done. Mostly this is reconfiguration in the internal farm networking Now results in JINR and IHEP are comparable with IHEP results during STEP09. Situation in PNPI is considerably better but far from being acceptable and further improvements are needed. RRC-KI is under testing now The troubling feature is a rather low CPU/walltime ratio which means effective decrease of available CPU resources in 2.5 times.

Physics analysis ITEP Validation of Tower and Topo jet algorithms Jet tagging and veto in VBF Higgs production BNPI Search for heavy LRSM neutrino in electron-muon-dijet final state PNPI e/  performance Search for the “best” jet algorithm for Top IHEP Underlying events and MPI in events with Z bosons Deviations from DY due to unparticle exchange and ED SINP MSU Rare B-decays B±→J/ΨK± Bs→μμ Validation of Fast ATLAS Monte Carlo Simulation Measurement of charm and beauty production using lepton trigger and D-meson reconstruction Associated W and charm production MEPhI Search for heavy metastable quarks Search for AC leptons (τ’++, τ’--) Y and J/ψ in HI

Conclusion