Classification: Statoil internal Status: Draft Statoil - an important source for value creation and jobs in Bergen and Hordaland
2 Many employees – major purchases Sandsli – employees Mongstad employees Kollsnes – 200 employees Ågotnes – 70 employees Offshore personnel resident in Hordaland – 800 people. 26 Statoil service stations Statoil purchased goods and services worth NOK 10 billion in Hordaland during 2004.
3 Central in regards to production Harstad Stjørdal Bergen Stavanger Offices Fields operated by Statoil Many important fields and installations are tied to Bergen through geography, logistics and organization. In addition comes processing facilities on Kollsnes and Mongstad Refinery at shore.
4 Sandsli, Bergen Production units Troll/Kvitebjørn Gullfaks Huldra/Veslefrikk Visund Other units Operations support Unit Traffic management centre Training centre
5 Kollsnes: An expanding gas processing plant Processes gas from Troll A, Kvitebjørn and Visund. NGL extraction plant The gas is exported via two independent pipelines to continental Europe.
6 Statoil Mongstad: Oil and gas refining for the future Refinery Crude oil terminal Second largest oil port in Europe – About 2000 ship calls per year. Petrol production is roughly twice Norway’s own consumption
7 Troll: North sea gas giant Platform 80 km north-west of Bergen 472 metres high Delivers 50 per cent of Statoil’s gas production Field On stream since 1996 Will deliver gas to Europe for years The gas comes ashore at Kollsnes
8 Gullfaks A, B & C: Long lived giants with still more to give On stream in 1986, 1988 and 1989 First field developed by Statoil Producing about barrels of oil per day Major future challenge is to extend producing life Already well beyond first predicted life expectancy
9 Other fields with connection to Bergen Huldra & Veslefrikk Oil and gas Huldra remotely operated from Veslefrikk “Late-life” Visund Produces both oil and gas Gas piped to Kollsnes, oil to Gullfaks Huldra Visund Veslefrikk
10 Kvitebjørn Came on stream in Oct 2004 Delivers dry gas to continental Europe via Kollsnes Delivers NGL to Mongstad for processing into butane, propane and naphtha The reservoir is metres down, and features high pressure and temperature
11 Demanding supply services – managed from Sandsli More than 1 mill tonnes of supplies shipped to rigs and installations. 50 ships working for Statoil on the NCS passengers carried by helicopter offshore bed- nights. Total procurement by operations support in 2004: NOK 17 billion.
12 Some future developments Camilla/ Belinda 2008 Valemon 2010 Hild gas 2009 Hild oil 2008 Dagny 2009 SLP B Compression 2008 Huldra hale- produksjon Troll Videreutv Gudrun 2010 Gjøa 2009 Brage N ? Alpha Cook 2011 SOL POL