Real Time at TransAlta Presented by: Keith Christianson March 4 th, 2002 Monterey, California.

Slides:



Advertisements
Similar presentations
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Advertisements

Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
OnContact CRM Customer Relationship Management. CRM 7 Benefits Rich "client" experience, completely web-based Access data anytime, anywhere. Ease of navigation.
HP Quality Center Overview.
Energy Efficiency at Marathon Petroleum Wayne Kinnel Catlettsburg Energy Coordinator 1.
Tom Theising, C.E.M., C.D.S.M. (979) An Organized Approach to Energy Management SSCET, Sep 19, 2014.
VALUE NOW: Using PI Data to Improve and Optimize Process Control John Cunningham The RoviSys Company.
ISO 9001 : 2000.
PacifiCorp-CAISO EIM Initiative Overview
Project Management Information Systems A APPENDIX.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Solar Fuel for a Clean Planet. Who is Solel?  A technology company, providing a one-stop solution for utility scale solar fields  The only commercially.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
E-Mon Energy™ Energy Monitoring Software
Chevron’s Power Performance Monitoring Solution
Managing the Information Technology Resource Jerry N. Luftman
Generating electricity from natural gas: The way forward for Nigeria A presentation by: NNPC FSTP Class E, study group 3.
Engineering Technology Division
LEARN. NETWORK. DISCOVER. | #QADexplore Implementing Business Process Management: Steps to Success WCUG – November 18, 2014.
TIMKEN Bearing Diagnostics and Prognostics Using PI Reducing Unplanned Downtime Rich Browner - Program Manager Reliability Solutions The Timken Company,
Duncan Fraiser, Adam Gambrell, Lisa Schalk, Emily Williams
1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade.
1 Department of Water and Power City of Los Angeles Automatic Meter Infrastructure Program Mariko Marianes and John Yu.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
Brooklyn Navy Yard Cogeneration Partners
© 2010 Colt Telecom Group Limited. All rights reserved. Next Generation Data Centre Design Akber Jaffer 2.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
David I. McGeown "Where's the value in on site generation? Can real time metering and dispatch make a difference?
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
AGENDA Welcome and introductions Brief introduction to PSI Mobile Technical Overview Demonstration Q and A Next Actions.
Server Virtualization: Navy Network Operations Centers
Fleet Performance and Reliability in Generation Utilities
1 Demand-Side Management Technology Workshop: Motors and Variable Frequency Drives Sponsored by Basin Electric Power Cooperative.
South African Wind Energy Programme A Otto 2 nd Annual Wind Energy Seminar 28 September 2010, Gallagher.
2 © 2005 OSIsoft, Inc. – Company Confidential Paul Ireland Manager – Information Engineering, RWE npower Technology Services P I.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
041025_1 Your World-Class IT Business Solution _2 Bolt Networks, Inc. Providing you with world-class service and total technology solutions.
The Coupa Mission Enable organizations to spend smarter and save money by delivering the most innovative, easiest to use, fastest to implement and cost.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
PI – An Enterprise Integration Tool Mark Brown – Calpine Corporation Mark Bowles – Calpine Corporation Sam Jenkins – Calpine Corporation.
Page 1 GADD Software & GADD Analytics 1.5 Public version, January 2015, gaddsoftware.com GADD Analytics.
WORLD ENERGY OUTLOOK OIL & GAS SUPPLY MOEB/D Existing New Actual
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Critical Facilities Introduction – NYC Sept 15, 2009 Regional Seminar.
PI at NB Power Presented by Steve Boyko. Introduction About NB Power Our PI history Current PI status Specific PI applications Future PI applications.
Eastern Interconnection Phasor Project Modernizing North America’s Electric Grid Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability.
Interactive Training Skills: Evaluation Study Executive Summary Presentation Service Merchandise Company Date: Wednesday, April 6, 2011 CONFIDENTIAL Consultants:
Real Time Financial Analysis in Process Plants (Energy and Performance Information System)
OBTAINING QUALITY MILL PERFORMANCE Dan Miller
PLANT DATA MANAGEMENT SYSTEM 1329 Stratford Court Del Mar, California Telephone (619) Facsimile (619) Richard H. Hertzberg Larry.
Concepts in Enterprise Resource Planning Fourth Edition
TCF and FCF-Online How can help you generate MI you need to satisfy FSA requirementswww.fcf-online.com.
Managing Reliability and the Markets with PI
Network Model Management System (NMMS)
Chris Reichart Appointed Process Assignment November 6, 2015.
2015 NetSymm Overview NETSYMM OVERVIEW December
Residential and Retail Energy Conservation Products and Services CEO: Mark W Jago CrystalRenewablePower.com.
Creating & Building the Web Site Week 8. Objectives Planning web site development Initiation of the project Analysis for web site development Designing.
® IBM Software Group © IBM Corporation Prospecting Made Easy: Performance Dashboards IBM ® Lotus ® ActiveInsight™
Evolution of PI in an Expanding Utility’s Strategy John L. Ragone KeySpan.
E.ON Russia Production management September 2013 Deputy General Director on production Igor Popov.
© 2014 Level 3 Communications, LLC. All Rights Reserved. Proprietary and Confidential. Simple, End-to-End Performance Management Application Performance.
MyFloridaMarketPlace Quality Improvement Plan. Page 2 MFMP Quality Improvement Plan  The MFMP team has developed a quality improvement plan that addresses.
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
Cognos BI. What is Cognos? Cognos (Cognos Incorporated) was an Ottawa, Ontario-based company that makes Business Intelligence (BI) and Performance Management.
Application Outsourcing: Achieving Success & Avoiding Risk
Stevenson 5 Capacity Planning.
Selling IIoT Solutions to End Users
Presentation transcript:

Real Time at TransAlta Presented by: Keith Christianson March 4 th, 2002 Monterey, California

Presentation Overview Introduction to TransAlta and Real Time Project description Implementation and technology Benefit Assessment Future thoughts Conclusions

TransAlta Operations

TransAlta Profile Canada's largest non-regulated electricity generation company 4,115 MW from coal-fired and hydro plants in Alberta 1,340 MW from coal-fired plant and mining operation near Centralia, Washington 2000 MW Gas fired CoGen units with MW this year Industry Outlook On Jan. 1 Alberta generating plants began operating under long-term power purchase arrangements; their generation is now sold under contract to power marketing Companies. On July 4 announced plans to sell Alberta-based Transmission business, choosing to focus on the Generation business. Growth Strategy short-term target: increase total generating capability to 10,000 MW by 2002 and to 15,000 MW by plan to begin a 900 MW expansion of Keephills, Alberta coal- fired generating facility. (2005)

Belief that significant potential exists to: optimize plant equipment operation in Real Time optimize plant equipment operation in unison provide a direct assessment of business impacts of change (markets, equipment status, customer) make consistent KPIs visible to all (Dashboards) develop technology for rapid deployment  Therefore, do a pilot at one site to prove Real Time concepts Real Time for TransAlta

The site Major Heavy Oil extraction facility located in North Eastern Alberta, Canada November - doubled the plant output to 250 K barrels of synthetic crude oil per day TransAlta contracted to supply power and energy needs (hot water, steam, compressed air) Power exchanged with the Alberta Power Pool

Site host and selection A 360 MW cogeneration facility was constructed in 2001 Any surplus power is available for sale to the power grid. (pay for the gas) Available fuels are Coke, Coker Gas for boilers with supplemental natural gas.

Real Time benefits at this site Ideally suited to pilot Real time because: –Large, complex operation –Multiple process variables and constraints –Different and inter-related revenue streams: Power, Steam, Hot water, Compressed air to host (contracted) Power to AIS (provincial power grid) –Difficult and poorly understood contracts –Instrumentation availability -> quality Data –Potential to improve customer relations with host

Real Time project team Strong site commitment – operations, maintenance and management -> communications reps Opportunity to educate employees about the bottom-line impacts they can have - > ‘business’ training Project team from Gen, E-Bis, IS plus site personal

Project timeline Real Time site selectionFeb 1 st Vendor analysis and selectionMarch 1 st Real Time Information strategy April 24 th Operations data to Vendor for analysis May 11 th Vendor on-site; initial modelsMay 22 nd PI server installed Sept 7 th Functional Spec (plant models, KPIs)Sept 18 th On-site data collection and PI installation Oct 9 th Factory Acceptance TestingNov 2 nd Installation at site + SATNov 30 th Benefits Assessment 1Dec 21 st Benefits Assessment 2Feb 18 th Real Time on-line March 11 th

Overview – Optimizer screen

Generation – Optimizer Screen

Network Overview

Software Vendor Must Haves:  Comprehensive products  Strong customer references  Low cost implementation  Offer a what-if analysis tool  Provide a Performance Guarantee

Operations Optimizer Package Optimizer model based on design calculations with real time inputs via PI Process Optimizer provides suggested controller set-points to achieve targets (open loop mode) Field inputs are compared to models and substitute data as required Output is in Dollars What-if models

Software Features The system is configured to:  Perform Plant Modeling  Data Reconciliation  Performance Monitoring  Real-Time Optimization, both open, closed loop  Coordinated optimization between other systems  Equipment selection optimization  What-if studies on-line and off-line  Multi-time periods  Interface through PI hence easy to maintain, upgrade and modify

Off-line Performance Monitor  Process data is automatically collected via PI and submitted bi- monthly via the web.  The data is validated for consistency, accuracy  Data is compared against a pre-defined design models CG turbines, steam turbines, boilers, HRSGs  Performance parameters are calculated: efficiency, equipment deviation vs. original design conditions, actual cost of performance deviation.  The measurements indicate how the equipment is degrading from its original operating (‘as new’) conditions.  Report issued to the plant for review.

KPI’s and Metrics  Created a dedicated tool with PI to display plant specific metrics and KPI’s – graphs, export features…..  People, Reliability, Customer Satisfaction, EH&S, Earnings, EBIT, Equipment performance  Manually update 40% - rest uploaded from PI automatically  KPI data will be live and visible to all at site

So what ?  Operations Improved visibility of Operational data Operational data directly converted into ‘actionable’ information  Maintenance Ability to view equipment performance vs. benchmarks Moves in direction of predictive maintenance  Management Provides direct measurement of site benefits and revenue Confidence that best business decisions have been made for present real time market conditions Using the “What-if” models allow best business decisions to be tested prior to implementation  Site and Host Benefits

Benefits Assessment and Measurement  Target set for minimum increase in capacity.  Measured benefit was from: On-going improvements in process operation (direct benefits) One-off benefits from the optimizer (i.e.: open bypass valve or off-line Optimizer run)  Two week assessment period case studies and reviews, tracking of accumulated benefits Verification that Optimal condition was reasonable  Results

Potential Issues PI as a bridge – potential security issue Suggestions? Thoughts? Comments? Standards for measurements, screen development New Technology and Software – What will survive?

Conclusions - site The project demonstrated the concepts were correct: optimize plant equipment operation in Real Time optimize plant equipment operation in unison provide a direct assessment of business impacts of change (markets, equipment status, customer) make consistent KPIs visible to all (Dashboards) develop technology for rapid deployment Plan to move to Closed Loop mode this year

More Conclusions Evaluating other potential sites Standards for existing plants (KPI’s, data collectors, performance monitors) Citrix apps – Information Portal Anywhere, Any time by any one!

Thank You (780)