Do not put content on the brand signature area Multi Actor Impact Simulation Prevalent practises / Challenges / Solutions EMTA, General Meeting Oslo –

Slides:



Advertisements
Similar presentations
International Telecommunication Union ITU Green Standards Week, Rome, Italy, September 5 – 9, 2011 ICT in Organizations Current Status of the ITU-T SG5.
Advertisements

3rd meeting COTS team April 25, 2007, Helsinki
NETLIPSE Infrastructure Project Assessment Tool Stuart Baker, Deputy Director of National Rail Projects Department for Transport, UK Zagreb, November 10,
Indicator 2.02 Acquire a foundational knowledge of accounting to understand its nature and scope.
Energy Proposal for a Council Directive amending Directive 2009/71/EURATOM establishing a Community framework for the nuclear safety of nuclear installations.
FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
1 Tools and mechanisms: 1. Participatory Planning Members of local communities contribute to plans for company activities potentially relating to business.
Evaluating public RTD interventions: A performance audit perspective from the EU European Court of Auditors American Evaluation Society, Portland, 3 November.
CN For agent use only. Not for use with the public. ING Annuity and Asset Sales Presents: ING Performance Trigger Index Strategy – A Story.
For agent use only. Not for public distribution. cn © 2008 ING North America Insurance Corporation Introducing… ING Protector Universal Life.
1 V Konferencja Ewaluacyjna Warszawa, Werner Schmidt Operations Evaluation The role of ex-post evaluation an EIB perspective.
1 European Investment Bank (EIB): Cooperation with local banks to support SME and Mid-Cap investments 1 st Danube Financing Dialogue - EU Strategy for.
Do not put content on the brand signature area General Project Management Course Kathleen Walsh, Gregory Lukowski and Víctor López University of Navarra.
Do not put content on the brand signature area Jamie Wewetzer Client Relations Manager, ING The Final 403(b) Regulations Are Here… For use.
Do not put content on the brand signature area Annuities & Regulation: a business point of view Tom Kliphuis, CEO of ING Insurance Central Europe Warsaw,
Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING.
For agent use only. Not for public distribution. cn © 2010 ING North America Insurance Corporation Introducing… ING Guaranteed Death Benefit.
World Green Roof Congress Brad Bamfield +44 (0) Whole Life Costs.
00 Table of contents Introduction SAM Sustainable Asset Management - key facts Dow Jones Sustainability Index - key facts Q&A Occupational Health & Safety.
Integration of Regulatory Impact Assessment into the decision making process in the Czech Republic Aleš Pecka Department of Regulatory Reform and Public.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING.
Do not put content in the brand signature area BCCH presentation ING Financial Education program Hungary 2012 Renáta Pásztor Dániel Lackó June 5, 2012.
Resource Efficiency Opportunities in the Building Sector
ISTEP: Technology Field Research in Developing Communities Instructor: M. Bernardine Dias CAs: Sarah Belousov and Ermine Teves Spring 2009.
Do not put content on the brand signature area Calibration of Stochastic Convenience Yield Models For Crude Oil Using the Kalman Filter. Delft –
RETIREMENT INVESTMENTS INSURANCE Accumulation and Protection Planning Combo A Protection and Retirement Strategy All In One.
Code Administrators Working Group Introduction 28 August 2008.
For agent use only. Not for public distribution. cn A Powerful New Sales Tool: The Life Insurance Capacity Calculator.
For agent use only. Not for public distribution. CN © 2008 ING North America Insurance Corporation Introducing… ING Protector Universal Life.
Practical Problems Experienced with Industrial DSM Projects Marius Kleingeld 15 August 2012.
1 ECGD3110 Systems Engineering & Economy. 2 Lecture 1 Introduction to Engineering Economics.
Successful IT Projects slides © 2007 Darren Dalcher & Lindsey Brodie Successful IT Projects By Darren Dalcher & Lindsey Brodie
Social Accounting – measuring impact. emphasis on early intervention to reduce the need for late, high cost crisis action; emphasis on early intervention.
Introduction to Saving. © Family Economics & Financial Education – Revised November 2004 – Saving Unit – Introduction to Savings Funded by a grant from.
Do not put content on the brand signature area Recruit the market Jan Paul Lottering Sr Consultant HR – ING Operations & IT Banking.
© 2013 ING North America Insurance Corporation CN RETIREMENT INVESTMENTS INSURANCE BLUEPRINT FOR BUSINESS: KEEP WHAT YOU’VE BUILT Key Person.
© 2014 ING North America Insurance Corporation. CN Premium Financing: Leveraging Assets for Wealth Transfer Planning SMART TOOLS FOR CREATING.
DG Environment European Commission Introduction to European ETV Promoting New Technologies Environmental Technology Verification Schemes Introduction to.
RETIREMENT INVESTMENTS INSURANCE Private Loans: Building Family Wealth While Retaining Some Control SMART TOOLS FOR CREATING FINANCIAL BLUEPRINTS.
Corporate Social Responsibility LECTURE 25: Corporate Social Responsibility MGT
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
RETIREMENT INVESTMENTS INSURANCE © 2013ING North America Insurance Corporation. CN Walton GRAT: Preserving Family Wealth with an Estate.
Social value reporting: An integrated approach John Maddocks – CIPFA
Framework and assessment methodology for policy coherence for development: Draft Report for OECD 16 th June, Paris Nick Bozeat.
Social Accounting and Audit (SAA) - Ten Simple Stages An introduction…
Initiation PlanningDesignExecutionControllingClosure.
Do not put content on the brand signature area Istanbul – May 2011 ORC Kick off – (Wholesale) Operational / Non Financial Risks (Information Tecnologies)
Interactive Business Dynamics
Peter Bandilla, Deputy Adviser, Lending in Central Europe
Small Business and Personal Credit
Importance of statistics data for regional cooperation
Feasibility.
Capital Project / Infrastructure Renewal – Making the Business Case
Consultation on the Finance Sector Supplement to the Natural Capital Protocol This project has been made possible by generous funding and support from.
THE FAIR METER TOOLKIT LIANDER AND STEDIN
Consultation on the Finance Sector Supplement to the Natural Capital Protocol This project has been made possible by generous funding and support from.
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Standards for success in city IT and construction projects
Communication and Consultation with Interested Parties by the RB
ESS Vision 2020: ESS.VIP Validation
Combating Cybercrime: Tools and Capacity Building for Emerging Economies WSIS 2015, Geneva Jinyong Chung May 25, 2015.
Evaluation in the GEF and Training Module on Terminal Evaluations
Draft Methodology for impact analysis of ESS.VIP Projects
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
A Blueprint to safeguard Europe’s Water Resources
GreenFleet, Murrayfield Stadium, 12th April 2019 Paul Hansen, Head of Devolved Administrations & Partnerships, CCS Grant Montgomery, Category Manager,
World-Changing Glasgow Transformation Programme Board Summary
Presentation transcript:

Do not put content on the brand signature area Multi Actor Impact Simulation Prevalent practises / Challenges / Solutions EMTA, General Meeting Oslo – May 21st 2015 Dirk Jan van Swaay Managing Director ING Bank

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Multi Actor Impact Simulation – Public Transport Agenda 1.Introduction 2.Impact Investment Global Trends 3.Good Decision Making, and quick 4.Examples Multi Actor Impact Simulation assessment tool 5.Conclusions and recommendations 6.Discussions and feedback 2

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Introduction Impact Objectives per actor vary, what is IMPACT ? Room for improvement: Impact Accounting, Benchmark, Reporting Funding – lending relationship to benefit Lessons learnt building MAIS models All actors to benefit from a common impact decision model 3

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Multi Actor Impact Simulation – Public Transport Agenda 1.Introduction 2.Impact Investment Global Trends 3.Good Decision Making, and quick 4.Examples Multi Actor Impact Simulation assessment tool 5.Conclusions and recommendations 6.Discussions and feedback 4

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline *Coined first by Antony Bugg-Levine in 2007 (Forbes, Feb ) Investments intended to create positive impact beyond financial return* Impact Investment, Global Trends Exclusion Best-in-class comparison Selection based on market capital Sustainability Indices Lack reliability Controversial Methodology Purpose – set BENCHMARK 5

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Sustainable Indices Controversial methodology* 46% Fund Managers trust DJSI 6 Reasons Identified Lack of standardization Lack of credibility of information Biased ratings Trade-offs Lack of transparency Lack of Independence * As identified by Rate the Raters 5 phase study ( ) 6

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Impact Investment, Global Trends 28 Agencies – assist on non financial reports Methodology Qualitative / Quantitative / Combination Detailed methodology not publically available Qualitative assessment examples Reputex / Trucost / Management & Excellence / GIIRS / Milieubarometer / GreenIntelli 7

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Impact Investment, Global Trends Challenges New Concept Lack of Standardization Industry Acceptance Steps taken Global Reporting Initiative (GRI) America (SASB) since 2011 EU proposed amendments to reporting directives 8

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Multi Actor Impact Simulation – Public Transport Agenda 1.Introduction 2.Impact Investment Global Trends 3.Good Decision Making, and quick 4.Examples Multi Actor Impact Simulation assessment tool 5.Conclusions and recommendations 6.Discussions and feedback 9

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Good Decision Making, and quick TCO PTA OEMs Consumer / passenger PTO Banks Lease 12 nov emb er NGO’s Knowledge Institutes Energy Suppliers Infrastructure … MAIS

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline 12 nov emb er Good Decision Making, and quick Financial costSocial cost Environmental cost

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline 12 november THEY ALL TALK AND TALK AND TALK AND TALK AND TALK AND TALK ABOUT COSTS, but DO THEY TALK ABOUT THE SAME COST? AND DO THEY UNDERSTAND EACHOTHER? AND DO THEY READ THE SAME AMOUNT? AND DO THEY TAKE WISE DECISIONS? Good Decision Making, and quick

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Multi Actor Impact Simulation – Public Transport Agenda 1.Introduction 2.Impact Investment Global Trends 3.Good Decision Making, and quick 4.Examples Multi Actor Impact Simulation assessment tool 5.Conclusions and recommendations 6.Discussions and feedback 13

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline 12 november Examples Multi Actor Impact Simulation

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline 12 november Examples Multi Actor Impact Simulation

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline 12 november Examples Multi Actor Impact Simulation

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Scopes Scope 3 All other indirect emissions Scope 2 From purchased electricity Scope 1 From own or controlled sources 17

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Multi Actor Impact Simulation – Public Transport Agenda 1.Introduction 2.Impact Investment Global Trends 3.Good Decision Making, and quick 4.Examples Multi Actor Impact Simulation assessment tool 5.Conclusions and recommendations 6.Discussions and feedback 18

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Conclusion and Recommendation Return (IMPACT + Financial) converge in risk and funding MAIS is a communication-tool between actors The use of MAIS aims to improve decision making (quality & speed) IMPACT needs to be made SMART SMART: Specific, Measurable, Agreed upon, Realistic and Time-based MAIS is made by and for the actors only Data and accounting rules in public domain, WiKi Expert Panel (reps from each actor) decide on rules and data The Dutch “polder” decision model has worked well Daily use is convincing, and confirms the value added Building MAIS does not have to be expensive 19

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Conclusion and Recommendation Build MAIS together with those with whom you interact Complete MAIS model before negotiation (PTA-PTO) starts Embed MAIS decisions and maintenance in your organisation Ensure that MAIS data is kept up to date Use (for free) what others have already developed Give the tool to the users (not via a consultant) Costs can be low and controlled (approx EUR 50k – 100k) Costs are marginal compared to contract value Limit Scope to what really matters 20

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Need  Honest, verifiable and robust assessment  Evaluate options at par  Set benchmark line – qualify / disqualify proposals 21 Conclusion and Recommendation

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline 22

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Multi Actor Impact Simulation – Public Transport Agenda 1.Introduction 2.Impact Investment Global Trends 3.Good Decision Making, and quick 4.Examples Multi Actor Impact Simulation assessment tool 5.Conclusions and recommendations 6.Discussions and feedback 23