12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.

Slides:



Advertisements
Similar presentations
MANAGING PROJECT SCHEDULING
Advertisements

Work Breakdown Structures
Estimating, scheduling and budgeting
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
Describing Process Specifications and Structured Decisions Systems Analysis and Design, 7e Kendall & Kendall 9 © 2008 Pearson Prentice Hall.
Management & Development of Complex Projects Course Code - 706
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Project Management: A Managerial Approach
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Project Time Management
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Roberta Russell & Bernard W. Taylor, III
Project Management Session 7
Engineering Design Development. Turner College and Career High School.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
Gantt Chart Engineering Design Development. Turner College and Career High School.
Workshop-3 Gantt and Pert Chart.
Project Management and Scheduling
PROJECT TIME PLANNING Process and Bar Chart Technique
Chapter 5 Planning
HIT241 - TIME MANAGEMENT Introduction
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Edward B. Farkas, Managing Director, Project Management Practice
Maximizing the Power of Microsoft ® Project and Microsoft ® Word Dr. John A. Estrella, CMC, PMP Presented to MPA Greater Toronto Area 20 February 2008.
SOFTWARE ENGINEERING BIT-8 APRIL, 16,2008 Introduction to UML.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Successful IT Projects slides © 2007 Darren Dalcher & Lindsey Brodie Successful IT Projects By Darren Dalcher & Lindsey Brodie
Planning the project Project Management (lecture).
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Project Management: A Managerial Approach
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Advanced Project Management Project Time Management Ghazala Amin.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
Chapter 3 Managing the Information Systems Project
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Dr. Hany Abd Elshakour 2/18/ :27 PM 1. Dr. Hany Abd Elshakour 2/18/ :27 PM 2 Time Planning and Control Activity on Arrow (Arrow Diagramming.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
SOFTWARE PROJECT MANAGEMENT
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
WEEK 3 Project Planning.
Survey Training Pack Session 17 – Budgeting and timelines for survey design and implementation.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
Creating a Work Breakdown Structure with Microsoft Project.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Production Planning and control – ME 1009 Unit 1 Introduction.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Process and customizations
Time Planning and Control Time-Scaled Network
Project Management MGT 30725
Management should be based on effective and thorough planning
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
ENGINEERING MANAGEMENT (GE 404)
PROJECT TIME PLANNING Process and Bar Chart Technique
ENGINEERING MANAGEMENT (GE 404)
Time Planning and Control Time-Scaled Network
THE HIERARCHY OF SCHEDULES
Modern Systems Analysis and Design Third Edition
Importance of Project Schedules
CHAPTER 6 PROJECT TIME MANAGEMENT
Modern Systems Analysis and Design Third Edition
Presentation transcript:

12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique

12/2/2015 2:45 AM 2  Planning is the process of thinking systematically about the future in order to decide goals  what our goals are, and how  how we are going to achieve them.  Planning means looking ahead, making preparations, and deciding the best course of action.  Planning is the process of thinking systematically about the future in order to decide goals  what our goals are, and how  how we are going to achieve them.  Planning means looking ahead, making preparations, and deciding the best course of action.  Definition of Planning

12/2/2015 2:45 AM 3  Dimensions of Planning Planning can be viewed from following points:  Subject TimeQuality Financial RiskOrganizational  Subject :- Time Planning, Quality Planning, Financial Planning, Risk Planning, Organizational Planning, …….  Organization CorporateProject  Organization :- Corporate Planning, Project Planning, …  Time Long-Rang PlanningShort-Range Weekly  Time :- Long-Rang Planning, Short-Range Planning, Weekly Planning, …. Planning can be viewed from following points:  Subject TimeQuality Financial RiskOrganizational  Subject :- Time Planning, Quality Planning, Financial Planning, Risk Planning, Organizational Planning, …….  Organization CorporateProject  Organization :- Corporate Planning, Project Planning, …  Time Long-Rang PlanningShort-Range Weekly  Time :- Long-Rang Planning, Short-Range Planning, Weekly Planning, ….

12/2/2015 2:45 AM 4  Why is TimePlanningnecessary?  Why is Time Planning necessary? timely completion  The increasing importance of timely completion. to facilitate communications  The continuous complexity and growth in the size of the project generates the necessity for specialization. Specialization may lead to a breakdown of communications. Time planning must be found to facilitate communications. resource management utilization of resources  Planning is essential for resource management and the efficient and maximum utilization of resources. controlling  Planning is basis for evaluating progress, controlling the work and making decisions. timely completion  The increasing importance of timely completion. to facilitate communications  The continuous complexity and growth in the size of the project generates the necessity for specialization. Specialization may lead to a breakdown of communications. Time planning must be found to facilitate communications. resource management utilization of resources  Planning is essential for resource management and the efficient and maximum utilization of resources. controlling  Planning is basis for evaluating progress, controlling the work and making decisions.

12/2/2015 2:45 AM 5 increase in production  For achieving an increase in production.  Financiers  Financiers require a workable plan. transfer of personnel  Essential in projects when their is transfer of personnel. Minimum risk  Minimum risk of the problems occurring. increase in production  For achieving an increase in production.  Financiers  Financiers require a workable plan. transfer of personnel  Essential in projects when their is transfer of personnel. Minimum risk  Minimum risk of the problems occurring.  Why is TimePlanningnecessary?  Why is Time Planning necessary?

12/2/2015 2:45 AM 6  WhoNeedsTimePlanning?  Who Needs Time Planning?  Customer/ Client/ Owner  Designer/ Consultant  Project management team (Manager, Engineers)  Cost estimating department  Planning and controlling department  Supervisors, foremen, labors  Supplier  Financiers  Customer/ Client/ Owner  Designer/ Consultant  Project management team (Manager, Engineers)  Cost estimating department  Planning and controlling department  Supervisors, foremen, labors  Supplier  Financiers

12/2/2015 2:45 AM 7  Processes of Time Planning activities 1.Visualize and define the activities. Logic 2.Sequence the activities (Job Logic). activity duration 3.Estimate the activity duration. 4.Schedule 4.Schedule the project or phase. resources 5.Allocate and balance resources. activities 1.Visualize and define the activities. Logic 2.Sequence the activities (Job Logic). activity duration 3.Estimate the activity duration. 4.Schedule 4.Schedule the project or phase. resources 5.Allocate and balance resources.

12/2/2015 2:45 AM 8  Visualize and define the activities work step (element) identifying and documenting 1. An activity is a single work step (element) that has a recognizable beginning and end and requires time for its accomplishment. Activity definition involves identifying and documenting the specific activities that must be performed to produce the deliverables and sub-deliverables. decompositionWork Breakdown 2. The technique of decomposition (Work Breakdown) may be used in defining activities. Decomposition involves subdividing project work packages into smaller, more manageable components to provide better management control. activity list 3. The output from activity definition is the activity list. Level of detail 4.The Level of detail of the plan should be considered in this phase. work step (element) identifying and documenting 1. An activity is a single work step (element) that has a recognizable beginning and end and requires time for its accomplishment. Activity definition involves identifying and documenting the specific activities that must be performed to produce the deliverables and sub-deliverables. decompositionWork Breakdown 2. The technique of decomposition (Work Breakdown) may be used in defining activities. Decomposition involves subdividing project work packages into smaller, more manageable components to provide better management control. activity list 3. The output from activity definition is the activity list. Level of detail 4.The Level of detail of the plan should be considered in this phase.

12/2/2015 2:45 AM 9  Visualize and define the activities Case Study: Install a new machine Activity Code Activity DescriptionDepends on LevelDuration (day) Inspect the machine after installation Hire the operator Install the new machine Inspect and store the machine after delivery Hire labor to install the new machine Train the operator Order and deliver the new machine

12/2/2015 2:45 AM 10  Sequence the activities identifying and documenting interactivity logical relationshipsorder 1. Sequence the activities or job logic refers to identifying and documenting interactivity logical relationships, i.e. determined order in which the activities are to be accomplished in the project. 2. Job plan must reflect the practical restraints or limitations that apply to most job activities. The types of restraints are:  Mandatory dependencies or hard logic (natural dependency),  Preferred logic (Discretionary dependencies),  External dependencies,  Resource restraints and  Safety restraints. 3. Predecessor activitiessuccessor activities 3. Predecessor activities mean coming before, while successor activities mean coming after. 4. Overlap 4. Overlap the activities to reduce the project time. identifying and documenting interactivity logical relationshipsorder 1. Sequence the activities or job logic refers to identifying and documenting interactivity logical relationships, i.e. determined order in which the activities are to be accomplished in the project. 2. Job plan must reflect the practical restraints or limitations that apply to most job activities. The types of restraints are:  Mandatory dependencies or hard logic (natural dependency),  Preferred logic (Discretionary dependencies),  External dependencies,  Resource restraints and  Safety restraints. 3. Predecessor activitiessuccessor activities 3. Predecessor activities mean coming before, while successor activities mean coming after. 4. Overlap 4. Overlap the activities to reduce the project time.

12/2/2015 2:45 AM 11 Case Study: Install a new machine Activity Code Activity DescriptionDepends on LevelDuration (day) 100Inspect the machine after installation Hire the operatorNone1 300Install the new machine500, Inspect and store the machine after delivery Hire labor to install the new machineNone1 600Train the operator200, Order and deliver the new machineNone1  Sequence the activities

12/2/2015 2:45 AM 12  Estimate the activity duration time unit 1.Select the time unit (week, day,..) to be used. 2.Use one of the following tools and techniques for estimating the activity duration: Expert judgment Expert judgment Quantitatively Quantitatively based durations Duration of activity (D) = Quantity of work / [Production rate of a crew or equipment * No. of crews]. Where production rate = Quantity produced in unit of time Duration of activity (D) = Quantity of work * Unit rate productivity of a crew or equipment Where unit rate productivity = Time needs to produce one unit of output time unit 1.Select the time unit (week, day,..) to be used. 2.Use one of the following tools and techniques for estimating the activity duration: Expert judgment Expert judgment Quantitatively Quantitatively based durations Duration of activity (D) = Quantity of work / [Production rate of a crew or equipment * No. of crews]. Where production rate = Quantity produced in unit of time Duration of activity (D) = Quantity of work * Unit rate productivity of a crew or equipment Where unit rate productivity = Time needs to produce one unit of output

12/2/2015 2:45 AM 13 Case Study: Install a new machine Activity Code Activity DescriptionDepends on LevelDuration (day) 100Inspect the machine after installation Hire the operatorNone Install the new machine500, Inspect and store the machine after delivery Hire labor to install the new machineNone Train the operator200, Order and deliver the new machineNone130  Estimate the activity duration

12/2/2015 2:45 AM 14  Schedule the Project or Phase  Scheduling  Scheduling is the determination of the project time and the timing of the activities comprising the project.  In scheduling we consider the questions of how long the project is expected to take and when each activity may be scheduled (started and ended) Time Planning Technique  To schedule the project, the planner needs a Time Planning Technique.  Scheduling  Scheduling is the determination of the project time and the timing of the activities comprising the project.  In scheduling we consider the questions of how long the project is expected to take and when each activity may be scheduled (started and ended) Time Planning Technique  To schedule the project, the planner needs a Time Planning Technique.

12/2/2015 2:45 AM 15  Time Planning Techniques  Practically every project is sufficiently complex that its breakdown and its inner relationships must be recorded on paper or other media, and not only in the head of the planner. paper model  Therefore as a plan is formulated some type of "paper model" of the project should be developed to communicate results of the plan to others and to serve as a basis for evaluating progress and controlling the work.  Practically every project is sufficiently complex that its breakdown and its inner relationships must be recorded on paper or other media, and not only in the head of the planner. paper model  Therefore as a plan is formulated some type of "paper model" of the project should be developed to communicate results of the plan to others and to serve as a basis for evaluating progress and controlling the work.

12/2/2015 2:45 AM 16  Bar Charts and Linked Bar Charts;  Network Model (Analysis), either  Activity on arrow (AOA),  Activity on node (AON),  Precedence Diagram  Line of Balance;  Time-location Diagram.  Bar Charts and Linked Bar Charts;  Network Model (Analysis), either  Activity on arrow (AOA),  Activity on node (AON),  Precedence Diagram  Line of Balance;  Time-location Diagram.  Time Planning Techniques

12/2/2015 2:45 AM 17  BAR CHART Gantt  During World War 1, Henry Gantt developed the Bar chart planning technique.  A bar chart graphically describes a project consisting of well-defined activities, the completion of which marks its end.  An activity is a task whose performance contributes to completion of the overall project. Gantt  During World War 1, Henry Gantt developed the Bar chart planning technique.  A bar chart graphically describes a project consisting of well-defined activities, the completion of which marks its end.  An activity is a task whose performance contributes to completion of the overall project.

12/2/2015 2:45 AM 18  All activities are listed in a column at the left side of the diagram.  A horizontal time scale extends to the right of the list.  A bar presenting each activity is drawn between its corresponding scheduled start and finish times.  All activities are listed in a column at the left side of the diagram.  A horizontal time scale extends to the right of the list.  A bar presenting each activity is drawn between its corresponding scheduled start and finish times.  BAR CHART

12/2/2015 2:45 AM 19  Case study

12/2/2015 2:45 AM 20  Case study

12/2/2015 2:45 AM 21  Preparing a Bar Chart

12/2/2015 2:45 AM 22  Uses of Bar Chart Planning Technique  Showing the order of the different activities  Showing when operations should start and finish  Checking what labor or equipment are needed and when  Checking out delivery dates for materials  Explaining to everyone concerned what is due to happen and when  Forecasting cash flow  During execution, the chart used to control the work  Showing the order of the different activities  Showing when operations should start and finish  Checking what labor or equipment are needed and when  Checking out delivery dates for materials  Explaining to everyone concerned what is due to happen and when  Forecasting cash flow  During execution, the chart used to control the work

12/2/2015 2:45 AM 23  Advantages of Bar Chart  Simple graphical form  Easy understood for all levels of management  Good form of communication.  Simple graphical form  Easy understood for all levels of management  Good form of communication.

12/2/2015 2:45 AM 24  Limitations of Bar Chart  Very cumbersome as the number of activities, increases  Logic is not expressed in the diagram  Difficult to use it for forecasting the effects of changes, It is therefore limited as control tool  No indication where management attention should be focused  Ineffective for project shortening  Very cumbersome as the number of activities, increases  Logic is not expressed in the diagram  Difficult to use it for forecasting the effects of changes, It is therefore limited as control tool  No indication where management attention should be focused  Ineffective for project shortening

12/2/2015 2:45 AM 25  Logic is not represented in the Bar Chart