FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE.

Slides:



Advertisements
Similar presentations
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Advertisements

Highway Maintenance and Preservation Needs
Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
Installation of Loops on resurfacing projects through maintenance Ted Swansegar
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
CONNECTICUT FY FY 2017 BIENNIUM GOVERNOR’S BUDGET DANNEL P. MALLOY, GOVERNOR February 26, 2015.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
Larry Galehouse, PE, PS, Director.  Established on July 11, 2003  Created to promote pavement preservation nationally and provide technical support.
Local Programs Update July 24, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
May 2014 Operations Planning Construction Design VISION Process 1.Receive design files from Projectwise -Create Maps to determine ownership and maintenance.
LAND AREA: 688 SQ. MI. – 3RD LARGEST IN OHIO 421 C/L MILES 393 BRIDGES (275 NBIS) 1,800 CULVERTS 5,000+ SIGNS 10 RAILROAD CROSSINGS (at grade) CURRENT.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
Things to look for and remember while preparing FD05 Estimates.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
Office of Project Development Department of Highways Retreat June 12, 2008.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
ONE BUSINESS SYSTEM FOR BROWARD SCHOOLS Budget, Finance & Procurement Elluminate Session.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Overview of FDOT’s Long Range Estimating System 2005 TEA Conference November 4, 2005 Daytona Beach, Florida.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
FE06 New Guardrail Program. Definition FE06 is a program to fund new guardrail locations statewide. Sections for this program are maintained in a guardrail.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Trail Funding Sources & General Information
Roadway Preservation Intranet Page. Location: Intranet/Roadway-Preservation.aspx.
2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
Things to look for and remember while preparing FD05 Estimates.
Local Rural Highway Investment Program (LRHIP)
Enacted in 1990, CAPP is funded with 0.45 cent of the fuel tax which generates approximately $28 million per biennium. The CAPP is a direct allocation.
Grant Maintenance Fall Title I Statewide Conference November 5, 2014.
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
INVENTORY AND HISTORY. Instructional Objectives n Types of inventory and historical data n Different methods of collecting inventory and historical data.
E-Rate Training for TASBO Members October 8, 2008 Presented by Susan Sullivan Director of Technology/Media.
2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
June 2012 Washington State Transportation Improvement Board Small City Funding Programs.
Bridget Malinowski February 2013 ROADWAY TRAFFIC CONTROL & COMMUNICATIONS MANUAL 1.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
Colbert County Budget Solutions John Bedford, P.E. County Engineer 2012 ACEA Convention.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Needs What is it? Needs What is it?. Minnesota Statute Apportionment of money to counties. Subd. 2. Money needs defined. For the purpose of this.
FACS-STIP Tool – Overview (Features, Attributes & Conditions Survey – Statewide Transportation Improvement Program) April 2010 Presentation for Roadway.
1 CARRY-OVER BUDGET (COB) REQUESTS WHY AND HOW TO SUBMIT THEM.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
KYTC Change Order (Contract Modifications).
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
1% Sales Tax Commission Board Meeting June 3, 2015.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
Roadway Pavement Management Plan
Boulder Junction Town Road Improvement Project
Boulder Junction Town Road Improvement Project
Overcoming Barriers to Implement Research Projects
Pavement Performance Measures In Georgia
Presentation transcript:

FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE

Items we will cover today  ESTIMATE PROGRAM  FUEL AND ASPHALT ADJUSTMENT CALCULATIONS  PES PROJECT CHECKLIST  ESAL PROGRAM AND CALCULATIONS  ESTIMATE PACKAGE, WHAT ITEMS ARE REQUIRED AND MUST BE INCLUDED OR WE WILL CALL OR YOU!  NECESSARY SPECIAL NOTES  TYPICAL SECTIONS  SUMMARIES YOU MAY NEED (BASE FAILURE, THERMOPLASTIC MARKINGS, TRAFFIC LOOPS, MILLING LOCATIONS, ADA RAMPS, Guardrail, Slide Sites)  PROJECT MAPS  Asphalt Warrants  STATE HIGHWAY ENGINEER, DESIGN AND CONSTRUCTION MEMOS  THE MAINTENANCE INTRANET SITE ADDITIONAL FILES (EO1’s, MA’s, Project Manager Toolbox, Photolog viewer, Bridge Viewer)

Maintenance Intranet site   A MAJOR PORTION OF TODAY’s TRAINING WILL INVOLVE THE INTRANET SITE  Major Updates will be posted on the site throughout the year. So check the site before preparing an estimate.  WE WILL DO AN BLAST WHEN A MAJOR UPDATE OCCURS.

FUNDING CODES/HANDOUT  FE01-MAINTENANCE  FE06-NEW GUARDRAIL  FE02-BRIDGE MAINTENANCE  CB06 AND CB01-RURAL SECONDARY  FD04-STATE CONSTRUCTION FUNDS  FD39-SECRETARY DISCRETIONARY FUNDS  FD51- FEMA REIMBURSIBLE PROJECTS  FD52-FEDERAL FUNDS (HSIP, NH OR OTHER FED PROJECTS

FD05-RESURFACING PROGRAM  STATEWIDE THIN ASPHALT MAINTENANCE PROGRAM DESIGNED TO SUSTAIN THE SURFACE CONDITION OF THE PAVEMENT. We do not address structure problems with this money.  MAINTENANCE IS NOT AN IMPROVEMENT OR BETTERMENT.  MAINTENANCE IS NOT RECONSTRUCTION OR REHABILITATION OR RESTORATION  It is 1 Inch, 1.25 or 1.5 Inches (D1,2, 3 only) OF ASPHALT SURFACE WITH MINOR LEVELING AND WEDGING OF PAVEMENT TO MAINTAIN DRAINAGE AND SECTION.

FD05 Budget  Current year, FY Budget is $97 Million.  FY Budget is ??? Million. It depends on the legislature.  Projects let before July 1 of each year will have a Deferred Payment Note.  FD05 projects will be sent to Construction Procurement for letting in February each year and progress with approximately 1/4 program per letting until we spend all the money.

UPCOMING FD05 FY  Estimate Packages must be to us early in the fall. If not your projects will be delayed going to a letting.  Pavement Management staff will discuss the priority rankings at the FD05 evaluation meeting held in each district in September.  We expect 1/3 each month by priority till all estimates are complete. Ex. If project No 1 and No 10 should be grouped or are contiguous you need to send them in together in the first 1/3 package.

BUSINESS PRACTICE  We update the PMS database after each bid letting to reflect the low bids.  Projects are let according to Priority Ranking. DR 1 is let before DR 20. When your District allotment runs out, we stop letting projects for your District.  If your windshield estimates are low, or bids are high you may lose projects that were originally allotted to you.

REMINDERS  We have a Limited FD05 budget  There are MORE NEEDS than funds  Limit shoulder trenching to 4FT (more width will have to be funded with other funds)  If you need more than 30% to 40% Level and Wedging, consider milling the entire road if you have adequate pavement structure.  Do not mill or overlay shoulders if they are in good condition.  More change orders equals less miles of road resurfaced!!!!

Contacts FE01 Project Field Reviews Rusty Wallace, Districts- 3,5, 9, and 11 Wheeler Nevels, Districts-4, 6, 8,12 TJ Gilpin, Districts 1, 2, 7,10 FE01 Panel Sign Maintenance Craig Caudill, - Statewide

THE END