Rocky Mountain Power - Utah Workgroups I and II Load Research and Peak-Hour Forecasting Presented by UTAH INDUSTRIAL ENERGY CONSUMERS Salt Lake City, Utah.

Slides:



Advertisements
Similar presentations
Electrical Systems.  This section discusses: –How utilities charge for electricity –How to calculate the avoided cost of electricity –How to use utility.
Advertisements

Utah Cost of Service and Rate Design Task Force Seasonality in Costs and Loads Maurice Brubaker June 15, 2005 Salt Lake City, Utah.
Thursday, September 16, Company sample rotation schedule ResidentialSchedule 6Schedule 23Irrigation X 2013X 2014X 2015X XX.
Line Efficiency     Percentage Month Today’s Date
WV Faculty Salaries Proposal. Full Professor WV salaries.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
Overview – Non-coincident Peak Demand
RETAIL RATE REVISIONS August 1, 2015 Presented By:
Presented by: Fadhila MICHAEL C. NAUGHTON. Purpose  Develop and demonstrate a method for deriving and testing regulatory preferences within and across.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Big Sandy Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Coincident Peak Load Forecasting Methodology Prepared for June 3, 2010 Meeting with Division of Public Utilities.
DSM Incentive Returns Proposal – Benefit/Cost Ratio Approach Utah Committee of Consumer Services Witness: David Dismukes Docket No T01 Supplemental.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Leveraging the Skills of Load Research to Add to the Bottom Line AEIC Load Research Conference Myrtle Beach, SC July 10-13, 2005.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
R OCKY M OUNTAIN P OWER C OMPANY DSM OPT-OUT PROPOSAL Utah Industrial Energy Consumers (UIEC) November 3, 2009.
1 ERCOT LRS Precision Analysis PWG Presentation February 27, 2007.
Load Research Status Presentation to the Load Research/Forecasting Working Group June 3rd, 2010.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
1 ERCOT LRS Sample Design Review PWG Presentation March 27, 2007.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
LOAD RESEARCH Irrigation Load Study Utah Cost of Service Task Force August 25, 2005.
FIRM TRANSPORTATION GAS SUPPLIER PRESENTATIONS GAS LOAD FORECAST.
Temperature Assumptions for Dynamic Ratings in ERCOT CRR Auctions Proposal to differentiate between Day (PeakWD & PeakWE) and Night (Off-peak) October.
WINTER PREPAREDNESS ARIZONA WINTER PREPAREDNESS ARIZONA.
PRODUCTION & OPERATIONS MANAGEMENT Module II Forecasting for operations Prof. A.Das, MIMTS.
Using the Trapezoidal Model to Derate NW Hydro Capacity Resource Adequacy Technical Committee July 25, 2007 Portland, Oregon.
Program Overview Solar resource will be built by j uwi, (pronounced “you-vee”), a developer based out of Boulder, Colorado. Solar farm will be located.
Customer Concerns with Implementing Demand Rates NASUCA and NARUC Conferences Austin, Texas November 2015 David Springe Consumer Counsel Kansas Citizens’
2015 SDG&E PTR/SCTD Evaluation DRMEC Spring 2016 Load Impact Workshop George Jiang May 11 th, 2016 Customer Category Mean Active Participants Mean Reference.
1 PG&E’s Response to the Summer 2006 Heat Storm LIOB Meeting September 14, 2006 Sacramento, CA.
Jan 2016 Solar Lunar Data.
Narragansett Electric Rate Classes
Baltimore.
Average Monthly Temperature and Rainfall
Resource Adequacy Demand Forecast Coincidence Adjustments
Nuffield Free-Standing Mathematics Activities Music Festival
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
CORPUS CHRISTI CATHOLIC COLLEGE – GEOGRAPHY DEPARTMENT
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
HOW TO DRAW CLIMATE GRAPHS
Behavior Modification Report with Peak Reduction Component
Electricity Cost and Use – FY 2016 and FY 2017
Study Results Drought Scenario Study
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Objective - To make a line graph.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

Rocky Mountain Power - Utah Workgroups I and II Load Research and Peak-Hour Forecasting Presented by UTAH INDUSTRIAL ENERGY CONSUMERS Salt Lake City, Utah August 12, 2010

How the Rocky Mountain Power Residential Sample Size is Calculated  RMP states that its goal is to provide precision of +/- 5% with 90% confidence for an estimate of the average of the twelve monthly system peak hours--using monthly kWs at time of system peak. The recorders were stratified by average annual kWh usage as follows: 0-750, , and over 1500 monthly kWh.  The average of the average kW is calculated for each stratum, yielding 3 averages. These averages are weighted by number of customers in each stratum to obtain one overall average. The average and the standard deviations from the strata are then used to arrive at the total sample size.  But, the 5% precision with 90% confidence criteria apply to only one number: the overall average kW across all months and customers. It does not to apply to any monthly figures. 2Utah Industrial Energy Consumers8/12/2010

Actual Precision and Confidence Attained for Monthly Estimate Using RMP Sample Are Lower than Criteria  To achieve the 5% precision and 90% confidence criteria at the monthly level, RMP would need larger sample sizes than that it has calculated using the 12-month average kW at system peak.  This means, with the sample size as calculated by RMP, lower precision is attained than the 5% claimed.  The table below indicates the precisions actually attained each month using the current sample of 144 customers. 3Utah Industrial Energy Consumers8/12/2010

“Q.What is your opinion of the company’s load research program? A.The Company purports to be designing its load samples for the non- demand metered classes to meet a PURPA standard, discussed in Mr. Thornton's testimony, which mandates that samples be designed so that 90 percent of population load estimates are within 10 percent of actual loads. While the company may be designing samples in an appropriate way to meet this standard, the resulting estimates from their samples of over the last several rate cases and this case do not appear to be meeting the standard. ” Direct Testimony of Jonathan Nunes Docket No DPU Exhibit 9.0, Page 13 October 8, /12/2010Utah Industrial Energy Consumers4 The division also questions the accuracy of RMP’s Load Research Data Rocky Mountain Power - Utah

8/12/2010Utah Industrial Energy Consumers5 Sources: Exhibit RMP_(CCP-3R) McDougal Exhibit RMP _ (SRM-2), Page Class Loads Less than Jurisdictional Load Class Loads Less than Jurisdictional Load Class Loads Exceed Jurisdictional Load Class Loads Exceed Jurisdictional Load Large differences between class and jurisdictional loads have not been explained RMP REBUTTAL FILING Month (1) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total 3,079 3,123 2,860 2,794 3,591 3,952 4,169 4,113 3,799 2,656 3,390 3,442 40,968 (2) 2,918 2,896 2,900 3,001 3,661 4,005 3,746 3,761 3,563 3,655 3,218 3,327 40,650 (3) (161) (227) (423) * (352) * (236) * 999 (172) (115) (318) (4) -5% -7% 1% 7% 2% 1% -10% -9% -6% 38% -5% -3% -1% Summation of Absolute Values of Differences3,054 7% Total Utah Jurisdictional used in Inter-Jurisdictional Allocation Sum of Utah Retail Classes from Class COS Study Class Total Exceeds (is less than) Total Jurisdictional Difference as a Percent of Column (1) * Loads that are intentionally excluded from the class data account for no more than 40 MW of the difference (RMP Response to UIEC Data Request 10.22) Rocky Mountain Power - Utah

“Q.Is all of the load data for each rate schedule that is used to calculate demand related cost allocation factors in the class cost of service study in this case weather normalized? If not, please explain why not. A.Customer class load data used in the cost of service study in this docket is based on the same methodology employed in Docket In that case, the Company’s response to UIEC Data Request provided the following explanation regarding rate schedule load data: ‘Customer class load data used to calculate demand-related cost allocation factors employed in the class costs of service study is not weather normalized. However, this same customer class load data is calculated from forecasted energy data which is weather normalized according to the new methodology. A description of the differences between the new and previous methodologies is provided in the Company’s response to UIEC Data Request ‘ ” (Emphasis added) /Rocky Mountain Power July 29, 2009 UIEC Data Request /12/2010Utah Industrial Energy Consumers6 Another issue with the load data is that it is not adjusted to reflect typical “peak-making” weather Rocky Mountain Power - Utah

This causes loads at peak times to be understated because the losses are higher when the temperature is hot and the loads are larger. Because of the physics of electrical systems the difference between peak losses and average losses is greater for low voltage customers than for transmission customers. As a result the low voltage customer’s loads are understated relative to transmission customer loads, causing too much cost to be allocated to transmission customers. 8/12/2010Utah Industrial Energy Consumers7 Another problem with the class load data is that loads are adjusted using annual average loss factors Rocky Mountain Power - Utah

The sum of class loads must be reconciled to the separately determined jurisdictional loads and adjustments (calibration) should be made if differences are large. Expected sources of difference for sample classes: 1. Sample Accuracy 2. Lack of reflection of “Peak-Making” Weather 3. Unrecognized difference in peak losses that results in understatement of loads of low voltage customers 8/12/2010Utah Industrial Energy Consumers8 Conclusion Concerning Loads Rocky Mountain Power - Utah