ISO 9001:2015 – how to use TRIZ for QMS design and improvement

Slides:



Advertisements
Similar presentations
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
Advertisements

ISO 9001:2015 DIS 16 th October 2014 Mark Braham MSc, MCQI CQP The AA, Quality Assurance Manager The CQI, ISO9001:2015 Team Leader.
Understanding the Requirements Qimpro Standards Organization
ISO 9001: Countdown to 2015 Presented by Ellen Diggs Ellen Diggs Consulting February 11, 2015 It’s Not Just for Manufacturing Anymore!
Draft BY QI organization June 2014
ISO 9001 : 2000.
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
Chapter 10: Quality Management Systems Jennifer Sadorus Heather Heller.
TEMPUS ME-TEMPUS-JPHES
Quality Management.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
A Review ISO 9001:2015 Draft What’s Important to Know Now
ISO 9001:2015 Revision overview - General users
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
Welcome ISO9001:2000 Foundation Workshop.
Medicare Certification Systems Thilak Wickremasinghe, Director/CEO Sri Lanka Accreditation Board.
ISO 9001:2015 Revision overview - General users
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
An Overview of the International Quality Management Standard
University of Sunderland CIFM03Lecture 3 1 QMS / Standards CIFM03 Lecture 3.
Quality Management System
WHAT IS ISO 9000.
Quality Management Systems P.Suriya Prakash Final Mech Vcet
Continual Service Improvement Process
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Introduction to ISO 9001:2000.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Roles and Responsibilities
Normative Reference for ISO 9001:2015
So You Want to Know All About the Changes to ISO 9001 …
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
New ISO Standards Transition Workshop (Auditors)
a guidance to conversion
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
ISO, QMS & CIR Awareness 2013.
Quality management systems – Requirements
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
Awareness and Use of ISO 9000:2015: Quality management systems — Fundamentals and vocabulary US TAG to ISO/TC 176 This presentation is intended to be.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The common structure and ISO 9001:2015 additions
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
ISO : 9000.
New ISO Standards Transition Workshop (Auditors)
IAEA International Atomic Energy Agency ESTABLISHING THE SAFETY INFRASTRUCTURE FOR A NUCLEAR POWER PROGRAMME IAEA WORKSHOP ON LEADERSHIP AND MANAGEMENT.
ISO-9001:2015 Where we have been and where we are going.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Ireland ISO9001:2015 What Changed? Chris Dawkins 26 th January 2016.
Certified Internal Auditor-NABH. Terms and definitions  Audit/ Assessment: Systematic, independent and documented process for obtaining evidence and.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
WRTVC INTERNATIONAL GUIDELINES Requirements for
Steve Barfoot, President Advantage International Registrar, Inc.
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
INTRODUCTION TO ISO 9001:2015 FOR IMPLEMENTATION Varinder Kumar CISA, ISO27001 LA, ISO 9001 LA, ITIL, CEH, MEPGP IT, Certificate course in PII & Privacy.
Quality Management Systems – Requirements
ISO 9001:2015 versus ISO 9001:2008 And ISO 9000:2015 – Fundamentals and vocabulary versus ISO 9000:2005.
Quality Management System awareness
Agenda Who are we? 1 Introductions Journey so far 2
QUALITY MANAGEMENT SYSTEM
Transition ISO 9001:2008 to ISO 9001:2015
ISO 9001:2008 Quality Management Systems
ISO 9001:2008 – Key Changes NOTE: use of this webinar depends on the instructor/speaker using the text in the notes of the slides!! Examples and speaking.
An overview of Internal Controls Structure & Mechanism
ISO 45001:2018 The importance of a Safety Management System
Presentation transcript:

ISO 9001:2015 – how to use TRIZ for QMS design and improvement © 2015 Andrej Trebar Today Quality practitioners are placing considerable emphasis on achieving compliance with QMS standards (i.e. ISO 9001, EN 15224, ISO/TS16949, etc.) which is essential to ensure compatibility in the supply chain. TRIZ is a tool to improve creativity which is needed to help solve difficult problems or predict the future development of systems. Most often it is helpful in situations that present a serious threat to the organization’s survival (i.e. a competitor has better products or services at lower prices, the cost of materials is increasing faster than the prices of our products, or we could improve our market position if we could improve xxx). Predictions about the future form the bases upon which all decisions are made. Any improvement requires the prediction of evolution. This presentation will show how to use TRIZ for improving QMS for achieving better competitively of organizations. ISO 9001:2015 is the main reference used for this presentation. All other sources are given on individual slides on note pages.

PDCA in ISO 9001:2015 Structure PLAN DO CHECK ACT 4 Context of the organization 5 Leadership 6 Planning 7 Support 8 Operation 9 Performance evaluation 10 Improvement Understanding of the organization and its context Leadership and commitment Actions to address risk and opportunity Resources Operations planning and control Monitoring, measurement, analysis and evaluation General Competence Nonconformity and corrective action Policy Quality objectives Awarness Requirements for products and services Expectations of interested parties Roles responsibilities and authorities Internal audit Communication Continual improvement Planning of changes Management review Design and development Documented information Scope of management system The slide above illustrates the clause structure of ISO 9001:2015 in more detail and in the context of the PDCA cycle – starting at clause 4. The following presentation is a brief commentary on those clauses including description of process approach and value definition of quality. Production and service provision Control of externally provided processes, products and services QMS ind its processes Release of products and services Control of nonconforming outputs

Representation of the structure of ISO 9001:2015 Standard in the PDCA cycle Quality Management System (4) Support & Operation (7,8) Plan Do Check Act Organization and its context (4) Customer requirements Needs and expectations of relevant Intersted parties (4) Leadership (5) Planning (6) Performance evaluation (9) Improvement (10) Customer satisfaction Results of the QMS Products and services This diagram is published in ISO 9001:2015 showing structure of standard in PDCA cycle. We are going to use this diagram to show which inventive principles are effective in different clauses of ISO 9001 standard and phases of PDCA cycle. Reference: ISO 9001:2015 Figure 2

Which inventive principles are most effective Quality Management System (4) Support & Operation (7,8) Plan Do Check Act Organization and its context (4) Customer requirements Needs and expectations of relevant Intersted parties (4) Leadership (5) Planning (6) Performance evaluation (9) Improvement (10) Customer satisfaction Results of the QMS Products and services 6,19,20,24,26 12,14,15,,25,28,24,32,40 7,8,13,15,17,18,21,22,27,29,30,31,35,36,38 3,5,9,10,11,31,33,34,40 The “TRIZ crossover QMS” application was designed as a software tool to improve creative thinking for teams and individuals when designing QMS or improving processes and products and services. It has the role of being a creative booster encouraging users to select inventive principles for solutions and implement the right method for their implementation. Reference: TRIZ training kit, http://www.quality-assurance-solutions.com/TRIZ-training.html 1,2,4,5,9,10,15,16, 22,23,24,33,37,39,40 All 40 inventive principles Reference: ISO 9001:2015 Figure 2

Contents ISO 9001:2015 Introduction 1 Scope 2 Normative references 3 Introduction 1 Scope 2 Normative references 3 Terms and definitions 4 Context of the organization 5 Leadership 6 Planning 7 Support 8 Operation 9 Performance evaluation 10 Improvement TRIZ techniques have been originally designed to be used for solving technical problems. Recently the use of TRIZ has been extended to business and management areas to help organizations to improve: business processes, business models, products and services, quality and productivity, Internal and external communication, competitiveness by improving value cost ratio, business strategies...

Contents Introduction 0.1 General 0.2 Quality management principles Introduction 0.1 General 0.2 Quality management principles 0.3 Process approach 0.4 Relationship with other management system standards

0.3 Process approach Risk based thinking is part of the process approach! Process owner is responsible for planning and assuring results. P PDCA in process approach Requirements are given in ISO 9001:2015, clause 8.1 Operational planning and control.

People in process are executing planed activities 0.3 Process approach People in process are executing planed activities P D

0.3 Process approach Results are checked before products and services are delivered to customer. P D C 8.6 Release of products and services

Customer internal or external 0.3 Process approach Customer internal or external If any nonconformities in products, services or process are detected, they are analyzed and corrective actions are performed to eliminate nonconformities. P D C feedback 8.7 Control of nonconforming outputs A

Customer satisfaction 0.3 Process approach We are monitoring customers’ perception of the degree to which their needs and expectations have been fulfilled, and acting upon the results in order to improve their satisfaction. Customer Products and/or services P D C feedback 9.1.2 Customer satisfaction The organization shall monitor customers‘ perceptions of the degree to which their needs and expectations have been fulfilled. A feedback Customer satisfaction A

0.3 Process approach A P D C A A First of all customer requirements, needs and expectations are gathered and analyzed. Customer Requirements, needs and expectations feed forward A Products and/or services P D C feedback 8.2.1 Customer communication (internal or external) Determination of requirements related to products and services. A feedback Customers’ satisfaction A

0.3 Process approach A P D C A A Customer Business plan Requirements, needs and expectations Business plan A Products and/or services P D C From ISO 9001:2015 Clause 0.3.1 General: Specific requirements considered essential to the adoption of a process approach are included in 4.4. The process approach involves the systematic definition and management of processes, and their interactions, so as to achieve the intended results in accordance with the quality policy and strategic direction of the organization (represented on figure above as “Business plan”). A Customers’ satisfaction Process owner shall align process goals to company goals … A

0.3 Process approach A P D C A A Customer Business plan Requirements, needs and expectations Business plan A Products and/or services Statutory & Regulatory requirements P D C See requirement ISO 9001:2015 in 4.2 Understanding the needs and expectations of interested parties. A Customers’ satisfaction … process owner shall ensure process to meet applicable statutory and regulatory Requirements, … A

0.3 Process approach A P D C A A Customer Business plan … Requirements, needs and expectations Business plan A Products and/or services Statutory & Regulatory requirements P D C Other processes (internal or external) can be considered as interested parties (see clause 4.2 Understanding the needs and expectations of interested parties). A Requirements of other processes Customers’ satisfaction A … … and coordinating his/hers plans to plans of other processes.

0.3 Process approach A P D C A A Measurements of process effectiveness Customer Requirements, needs and expectations Business plan A Products and/or services Statutory & Regulatory requirements P D C The effectiveness of the process lies in being able to provide the desired output as needed by the Organization (defined as a goal in Business plan) and its’ Customer (defined in customers requirements). (Are we doing the right things?) From the ISO 9’001:2015, clause 0.3.1: The application of the process approach in a quality management system enables: understanding and consistency in meeting requirements; b) the consideration of processes in terms of added value; c) the achievement of effective process performance; d) improvement of processes based on evaluation of data and information. A Requirements of other processes Customers’ satisfaction A

0.3 Process approach A P D C A A Measurements of process effectiveness Goals planned Goals achieved Customer Measurement of process efficiency Requirements, needs and expectations Business plan A Resources planned Resources used Products and/or services Statutory & Regulatory requirements P D C A process characteristic indicating the degree to which the process produces the required output at minimum resource cost. (Are we doing things right?) A Requirements of other processes Customers’ satisfaction A

0.3 Process approach A P D C A A Measurements of process effectiveness Goals planned Goals achieved Customer Measurement of process efficiency Requirements, needs and expectations Business plan A Resources planned Resources used Products and/or services Statutory & Regulatory requirements P D C NCR NCR – Non Conformance Request: Measuring how many NCR were issued and what was the cost of correcting nonconformity. SCI – Customer Satisfaction Index: How are our customers (internal and external) satisfied with result of our process. A Requirements of other processes CSI Customers’ satisfaction A

Using TRIZ to detect N.C. A P D C A A Worsening features Nonconforming product is produced here Worsening features Measurements of process effectiveness Goals planned Goals achieved Customer Measurement of process efficiency Nonconforming product is not detected here Requirements, needs and expectations Business plan A Resources planned Resources used Products and/or services Statutory & Regulatory requirements P D C NCR A Requirements of other processes CSI Customers’ satisfaction A Improving speed and productivity Improving features Use 39×39 matrix for inventive principles

Using 39×39 matrix Worsening features Improving features #31 Harmful factors acting developed by an object #37 Complexity of a control #9 Speed 2, 24, 35, 21 3, 34, 27, 16 #39 Capacity / Productivity 35, 22, 18, 39 12, 17, 28, 24

Example: situation as-is Metal chips are falling into the lathe. Metal chips are jamming the lathe performing added value operation. To improve speed and productivity, operator is replaced by a robot. Metal chips that were generated by process are adverse factor jamming the system. Previously they were removed manually by operator, introducing robot they should be removed by some other means. Metal chips are removed by operator. This is not value added operation.

Identification of free resources GRAVITY Gravity field is: free, reliable, doesn’t need maintenance. We are going to use Inventive problem solving procedure of TRIZ crossover QMS application. Firs step: Problem determination – described on previous page. Second step: Determination of system contradictions – improving the speed of process metal chips are clogging the lathe. Third step: Formulate an ideal solution – elimination of the harmful function (clogging) without introducing additional resources. Fourth step: Identify sources for solution – using inventive principles #2, 24, 35, 21 and gravitation field. Fifth step: Determine the “strength” of the solutions and choose the best one – turning lathe upside down. Sixth step: Predict the development of the system considered within the problem – use the same solution for other similar operations Seventh step: Analyze the solution process – the process change has enabled us to use gravity as free resource. Other proposed solutions were based on introducing mechanical approach to removing metal chips (based on brush, blowing and magnetic mechanism). Gravity field can be used to remove metal chips from machine.

Using 39×39 contradiction matrix Worsening feature Improving feature #31 Harmful factors acting developed by an object #9 Speed 2, 24, 35, 21 Inventive principle Remove metal chips from the system Use gravity field to remove metal chips Change process – turn the lathe upside down Skip manual removal of metal chips Action

Example: situation to-be Turn the lathe upside down. Metal chips will be falling out of the system by gravity. This is effective use of gravity field (available for free) for removing metal chips. To improve speed and productivity, operator is replaced by a robot. Metal chips that were generated by process are adverse factor jamming the system. Previously they were removed manually by operator should be removed by some other means. Reference: Jack Hipple, Using TRIZ to make systems more reliable, http://media.asq.org/103239/web.mp4 Metal chips are collected periodically for recycling.