PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 9/13/2007 Don Lynch. 9/13/2007 Weekly Planning Meeting 2007 PHENIX Shutdown April-June 2007: Complete run, De-mount HBD West, Begin.
Advertisements

PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
PHENIX WEEKLY PLANNING 11/1/2007 Don Lynch Daylight Savings Time ends Sunday Nov. 4 at 2:00 AM.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
5/5/11 1 PHENIX WEEKLY PLANNING 5/5/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 7/19/2007 Don Lynch. 7/19/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 8/9/2007 Don Lynch. 9/9/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/18/2007 Don Lynch. 10/18/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/20/2008 Don Lynch. 3/20/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 7/26/2007 Don Lynch. 7/26/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch

1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane design review2/12/28 Lab Holiday (Presidents Day)2/182/18 Next scheduled Maint. Day?2/272/27 Mu Trigger FEE Prototype II install2/27 2/27 Complete new beampipe design2/292/29 End PP run3/123/ GeV Run3/133/14 End of Run 83/155/27 Install new UPS~3/15~3/31 End of Run Party4/44/4 Install Gas house UPS’s4/156/13 Install HBD 7/159/15

1/31/2008 Weekly Planning Meeting3 Yesterday’s Brief Maintenance Access MuTrigger FEE Prototype II test walkdown (crawldown?) Permit is in place Other items - ?

1/31/2008 Weekly Planning Meeting4 Next Maintenance Access: Feb 27th Install and Test Mu Trigger prototype FEE Field fit CM access stair hardware Other Tasks ?

1/31/2008 Weekly Planning Meeting5 CM Ladder/Stair Shutdown Access Ladders done Railing to be ready for next access

1/31/2008 Weekly Planning Meeting6 Tent Preparation – Done Approval to flow gas received!! Safety systems – Installation complete, mini-blue sheet done Equipment Issues – Need specs for 3T (Tilting Transport Table) and GMHOS (gap, module and ½ octant storage) racks, then need to fabricate assemble and install. Work plan – Revised and submitted for approval. Includes 4 new PHENIX/RPC procedures Need to develop detailed production procedures and update workplan as necessary. Security – Comply with C-A policy when necessary RPC Factory Support, cont.

1/31/2008 Weekly Planning Meeting7 RPC Factory Issues, cont. Area to the west of RPC factory is now re-posted and cordoned with yellow tape as a controlled area. A corridor has been left to access the bathroom. Any activities which will need to traverse the posted area (e.g. delivery of materials, equipment etc. through the roll up doors) will require a work permit

1/31/2008 Weekly Planning Meeting8 RPC & Mu Trigger FEE Detailed Schedule. In progress, details next week 33 Major subtasks 227 detailed tasks/milestones

1/31/2008 Weekly Planning Meeting9 New Beampipe Design & Review Current beampipe IR region: 3 inch (76.2 mm) OD Be section,.04” (1 mm) wall thickness 55” (1400 mm) long Proposed beampipe IR region: 1.61 inch (41.0 mm) OD Be section,.02” (0.5 mm) wall thickness 31.5” (800 mm) long Design to be ready for final review by 2/29/08 Procurement March 08 Ready for installation March 09

1/31/2008 Weekly Planning Meeting10 New Beampipe Design & Review

1/31/2008 Weekly Planning Meeting11 New Beampipe Design & Review

1/31/2008 Weekly Planning Meeting12 CM Crane Uses Gorbel 1-ton capacity Ceiling mounted Bridge Crane, modified to be supported by 2 Steel Channels attached to CM Bridge and hoist to be removed for running. Crane Design ready for review Waiting for design review.

1/31/2008Weekly Planning Meeting13 MuTr North, Station-2, Octant 7(bottom) Same Setup as Summer 1 Chassis -> 2 ADTX boards

1/31/2008 Weekly Planning Meeting14 New Platform 8’ x 2.5’ Muon Trigger Rack Platforms HBD/RXNP MuTrgrFEE NMuTrgrFEE S VTX FVTX NCC N NCC S RPC1 S RPC1 N New Platform 8’ x 2.5’

1/31/2008 Weekly Planning Meeting15 MMN and Station 1Scaffolds

1/31/2008 Weekly Planning Meeting16

1/31/2008 Weekly Planning Meeting17 Design Reviews Mu Trigger FEE Prototype (Informal, currently in process) CM Crane (analyses complete) MMN Scaffolding 2/19-2/22 Station 1 Scaffolding 3/3 – 3/7 RPC Prototype 3/17-3/28 (Prototype design, installation, gas system, electronics, safety) Mu Trigger FEE N & S 3/17-3/28 MuTrigger N & S rack platform 4/21-5/2 RPC Stations 1, 2 and 3 6/22-6/20 MMS scaffolding 2/2/09-2/6/09

1/31/2008 Weekly Planning Meeting18 Other Work VTX, FVTX and NCC prototype support Integration Physical and Rack space Infrastructure upgrades New Counting House Door VTX Prototype for run 8 ?

1/31/2008 Weekly Planning Meeting19 Safety, Security, Etc. : Training - good efforts to get up to date. I will update the requirements list next week Procedures – I will put procedures used in shutdowns on line next week on the engg web site. Look them over the next few weeks to refresh your memory on the various tasks. Winter is not over yet. Cold & snow coming next week? Other Issues?

1/31/2008 Weekly Planning Meeting20 5 Year Plan 2008 Install stations 1& 2 of MuTr FEE upgrades (north), 1 octant Cu absorber (S), 1 half otants each RPC2/3 S, MMN sta. 2 scaffolding, MuTr Sta 1 N&S scaffolding, 1 octant of MuTrigger FEE upgrades (south, sta 1 & 2), MuTr N stn. 1 & 3 decaps, MuTrigger rack platforms (N&S), CM crane, remove/replace beampipe, infrastructure upgrades & repairs, misc. subsystem work, 1 RPC rack in South tunnel, MuTrgr FEE N & S racks 2009 Remove HBD & RXNP, scaffolding in MMS, MuTr S stn. 1 & 3 decaps, RPC2 N, RPC3 N, north Cu absorbers, partial VTX, iFVTX, MuTrgr S sta 1 & 2, MuTrgr S rack, 2 racks in N tunnel, infrastructure upgrades & repairs, misc. subsystem work 2010Remainder of VTX barrel, partial FVTX, south Cu absorber completed, MuTrgr FEE stn. 3 S, any remaining MuTr decaps, infrastructure upgrades & repairs, misc. subsystem work 2011RPC1 N&S, NCC N, remainder of FVTX, DC West upgrade/repair, remove absorbers, infrastructure upgrades & repairs, misc. subsystem work 2012NCC S, upgrades contingency & wishlist, infrastructure upgrades & repairs, misc. subsystem work, TBD new and improved upgrades * Years refer to the shutdown year and follow the run with the similar number (i.e. work in 2008 is to be done in the shutdown that follows run 8, and so on)

1/31/2008 Weekly Planning Meeting21 Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Where To Find PHENIX Technical Info Happy Valentine’s Day ! Don’t forget your significant other Or you’ll be in big trouble !