Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.

Slides:



Advertisements
Similar presentations
SAFETY SERVICES PROVISION I. Bejar Alonso. Transition SC to Service Provider – From 1 st January Mechanical Inspections Pressure Lifting Safety valves.
Advertisements

PERMIT REQUIRED CONFINED SPACE ENTRY PERMIT REQUIRED CONFINED SPACE ENTRY.
Compliance - Work Permit CAKE Session 17. Purpose of the Work permit system: The Purpose of the system is to: - Prevent undesired incidents and mitigate.
Training MICE ! & User support. Where to start? If you feel that you are incompetent - a good starting position? If you don’t know if you are incompetent.
5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Safety Organization and Safety Measures for the Installation of.
Permit Required Confined Space Entry Permit Required Confined Space Entry.
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
Presentation for health and safety coordination CERN Safety Coordination Mission and Role M. Arnaud, C. Bedel, J. Etheridge, E. Paulat.
Permit to Work Procedure Document Number: KOC.SA.004
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
SHE Code 33: Safety of Pressure and Vacuum Systems Safety, Health and Environment (SHE) Group.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Ministère de l'Écologie, du Développement durable, et de l'Énergie Ageing plan in France Programme for the prevention.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
DGS/SEE Flammable Gas Safety – an update. DGS/SEE New Chemical Safety Rules New SR-C, Chemical Agents. GSI-C1, Prevention and Protection.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
John Robert Etheridge, TS/HDO, Health and Safety Coordinator for the installation of the LHC and its Experiments Enviromental Health and Safety – managing.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
HBR Best Practices Seminar Presented by CertifiedSafety Brady’s Landing June 30, 2005.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Induction Safety Course for ALICE Collaborators - Marc TAVLET / GLIMOS 1 Induction Safety Training for ALICE collaborators I.Basic safety, for any newcomer.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Managing the LHC Experimental Area Point 5, CMS: Martin Gastal (PH/CME) Point 1, ATLAS: François Butin (TS/LEA) Point 2, Alice: Sebastien Evrard (TS/LEA)
Access requirements D. Caforio Università di Bologna – INFN AFP Testbeam Organization meeting – October 18 th, 2012.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire R. Trant HSE Unit for ACCU Meeting R. Trant.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000.
GLM 22/10/2002 E.Sánchez-Corral, L. Symons / ST D. Mathieson /AS 1 AOC Project Progress Report Organization Scope, Strategy, Objectives Status: – specification,
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Safety Management System
International Technical Safety Forum CERN, Geneva, Switzerland, April 12-16, 2010 CERN Safety Coordination How it functions M. Arnaud, C. Bedel, J. Etheridge,
Health and Safety Coordination at CERN Environmental Health and Safety managing risks today for a safer tomorrow John Robert Etheridge, Emmanuel Paulat,
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Safety Training - Unit Management Why it is essential, who needs it and how to go about it February 2015 Dr Emer Bell Integrated Risk Solutions.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Hot Work Permit Osan AB Fire Emergency Services.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Cryogenic safety organisation at CERN
Test beam check list Michael JECKEL EN-EA-EC.
Some arrangements for personnel safety 1- Procedures for access
Safety in the Neutrino Platform Hall
Preview of Access Processes for Working at SURF
Safety Issues (TF, June 15, 2005)
East Area Renovation Project team #6 Launch safety agreement
Health and safety organization on construction site
EP Experiments safety validation process Safety Permits
Pre-Registration flowchart
Installation Binder / IRR – an example
Work and Service Supervisor
Presentation transcript:

Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2

Marc Tavlet - GLIMOS2 1- Access Procedures Table of Content of the Document EDMS :  1. Introduction and Scope  2. Obtaining CERN Passes (Cards) 2.1. Verify existing CERN Cards 2.2. Arriving Collaborators 2.3. ALICE Contractors for Point Underground Access 2.5. Visiting the ALICE premises  Register before you come (see secretariat 72771)  Take safety course asap (call or GLIMOS)

Marc Tavlet - GLIMOS3 1- Access Procedures  3. Working at Point Logistics to start work 3.2. Safety in SX2 SXL2 and PX Safety in underground cavern UX25 Safety equipments Specific risks during installation Specific risks during commissioning 3.4. In case of emergency  Attend dedicated safety course (GLIMOS)  Plan your work, announce you work !

Marc Tavlet - GLIMOS4 1- Access Procedures  4. Responsibilities in matter of safety 4.1. ALICE Safety Officers 4.2. Other Safety actors  5. Sanctions  6. Requested Safety Documents 6.1. From contractors 6.2. From collaborating teams   7. References  8. Some forms

Marc Tavlet - GLIMOS5 1- Access Procedures Appendices of Document EDMS :  Appendix 1: Main Technical Contacts in ALICE + Phone No  Appendix 2: List of Safety Officers for ALICE + Phone No  Appendix 3: Safety Organization in ALICE  Appendix 4: List of Safety Link-Persons  Appendix 5: Template for Task Procedure form

Marc Tavlet - GLIMOS6 2- Tests with Beams Contact = Paolo Martinengo ( or )  For new experimental setup, ISIEC = Initial Safety Information on Experiments at CERN, to collect info / setup + safety aspects + discussion with GLIMOS, safety officers and SC.  If Flammable Gases : F1 - Risk Classification F2 - Commissioning requirements for flammable gas systems F3 - Declaration and cancellation of a flammable gas zone F4 - "Blue poster" F5 - Request for a Flammable Gas Purchase Authorisation

7 3. Safety Procedures LHC project requires Site Safety Coordinators PGCSPS Overall Safety and Health Protection Plan Civil Engineering Work Equipment Installation PPSPS Plan Particulier de Securité et de la Protection de la Santé PPSPS to be filled out by contractors as well as by collaborating institutes

8 3. Safety Procedures AOC (Notice of start of work) PPSPS Joint Inspection CERN works supervisor Contractors or Institutes (Safety Coordinator and GLIMOS check it) Safety Coordinator 30 days before 7 days before

Safety Procedures The is mandatory as soon as one or more contractor(s) (except transport and handling) are involved in the work. It must be prepared asap (in any case before the start of the work) by the Project Leader. AOC (Notice of start of work)

Safety Procedures PPSPS The simplified = the Task Procedure Who does what and how ??? + risk assessment For Institutes (GLIMOS checks it) To be prepared 30 days in advance or asap, by the Project Leader. (Available as Appendix of doc. EDMS )

Marc Tavlet - GLIMOS Task Procedure Task to be realized………………………………………………………………….. Location of work………………………………………………………………………….. Dates of workstart …………………end ……………………. Sub-project………………………………Institute ……………….. Responsible person………………………phone…………………. Safety link-person ………………………phone…………………. Local supervisor……………………… phone…………………. Persons involved…………………………task, qualification…………………. …………………………task, qualification…………………. Description of work procedure ……Step by step, associated risk(s)………………………………………………………………….

Marc Tavlet - GLIMOS Task Procedure Risk assessment Preventive measures (collective), Protective equipment (personnel) Noise generated by the taskat step No…..…………………………………. Working at heights…xx m ………..…………………………………. Needs for scaffoldings …… Needs for lifting equipt...… Needs for “nacelle”…… Flammable gas at step No …..…………………………………. Chemicals……………..…………………………………. Hot works……………..Fire Permit No …………..….. Radioactive sources……………..…………………………………. Lasers……………..…………………………………. Confined spaces……………..…………………………………. High voltages……………..…………………………………. Vacuum and pressure tanks……………..…………………………………. Other risks……………..…………………………………. Lifting and transport needs……………..………………………………….

Marc Tavlet - GLIMOS Task Procedure The Project Leader and the Local supervisor certify that the persons involved have the proper qualifications and have been properly informed about safety aspects of the work. Project Leader…………………………….. date…………………. Local supervisor…………………………….. date…………………. Sent to: Integration & Installation Coordinator, Lars Leistam …………….. Commissioning Coordinator and Deputy Glimos, Hans Taureg..……………. TSO(phone: ………..)………………………..………………. GLIMOS (70608)Marc Tavlet………………. SC Inspector(………..)………………………..………………. Safety Coordinator (163870)E. Paulat………………. This task procedure must be on display at the place of work.