HAPUA WG No.5 (ESI Services) Updates The WG2, 5, 6 and Chairman of APGCC Meeting Jakarta, Indonesia ● 26 February 2009 By WG 5 Project Coordinator: MR.

Slides:



Advertisements
Similar presentations
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Developments Transmission Workgroup 6th October 2011.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
Pilot Project – Energy Trade Data Reporting Scheme Background information Waler Boltz, Chairman CEER Gas Working Group 19th Madrid Forum March 2011.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
MAIN PREMISES TO THE FINANCIAL SECURITY RULES USED BY THE GAS TRANSMISSION OPERATOR GAZ-SYSTEM S.A. IN TRANSMISSION CONTRACTS AND NETWORK CONNECTION AGREEMENTS.
Recently Issued OHRP Documents: Guidance on Subject Withdrawal and Draft Revised FWA Secretary’s Advisory Committee on Human Research Protections October.
‘Regional Regulation between the SADC Countries’ Presentation to 18 th World Energy Congress Round Table 10 – B 23 October 2001 Xolani Mkhwanazi Chief.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
Query Health Business Working Group Kick-Off September 8, 2011.
10 th Meeting of the UNCEEA, New York, June 2016 System of Environmental-Economic Accounting for Agriculture, Forestry and Fisheries Development.
HAPUA WORKING GROUP NO. 1: GENERATION (HWG1) 10 th Meeting on 26 th Feb 2009, Jakarta, Indonesia PROGRESS REPORT AND ACTION PLAN FOR 2009 BY MR. AHMAD.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Meeting with FNQ consumers/stakeholders 15 January 2014.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Association of Energy Regulators for Eastern and Southern Africa EgyptEra Electricity Market and Regulators Status in COMESA General Assembly Meeting Lusaka,
1 FUTURE STESEG WORK - CURRENT AND NEW PROJECTS - FUTURE STESEG WORK - CURRENT AND NEW PROJECTS - SHORT-TERM ECONOMIC STATISTICS EXPERT GROUP (STESEG)
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Energy Agency of the Republic of Serbia
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
STATUS REPORT SWG SO by PLN HAPUA MEETING WORKING GROUP 2 – TRANSMISSION SUB WORKING GROUP– SYSTEM OPERATION 6th Oct 2010, Kuala Lumpur - Malaysia.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
The BEPS final reports Daniel Szmaragowski
Update on the MA Task Force on Evaluation of Teachers and Administrators Presented to the Board of Elementary and Secondary Education Associate Commissioner.
1 IRES, version 0: an overview Vladimir Markhonko United Nations Statistics Division The Oslo Group on Energy Statistics Fifth meeting, Cork, Ireland,
International Recommendations for Energy Statistics (IRES): A progress report Fourth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
1 Approved Terms of Reference for HAPUA Working Group No.5-ESI Services Project 6 Bilateral Contract Benchmarking.
Establishing the Independent System & Market Operator. (ISMO) 30 January 2013.
DEVELOPMENT OF A WHITE PAPER ON CORRECTIONAL SERVICES Ministry of Correctional Services.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Industry Dialogue on xoserve Services 14 th September 2007.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
GRI SSE Work Plan Project proposal of HEA
REWG activities in LILIIA MALON REWG Chair Prague
9th KSC meeting Bali, 23rd August 2017
Global Youth Tobacco Survey (GYTS): Proposal Development
- GDP 2011 versus 2010 – increase by 5.5%
Update on European Network Codes
Sales Process March 2017.
PARIS21 - League of Arab States
Marine Strategy Framework Directive (MSFD)
GRI SSE Work Plan Project proposal of HEA
WG Chair: Charles Ehrlich, NIST, U.S.A. CIML Member
MBIE arrangements for finalising remaining technical regulatory settings in the Telecommunications (New Regulatory Framework) Amendment Act, 2018 Presentation.
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Performance Audit Subcommittee Project for ISSAI Level 4 review 66th INTOSAI Governing Board Meeting Vienna, November 5-7, 2014.
Fees Initiative Chishala Kateka, Working Group Chair IESBA Meeting
Marine Strategy Framework Directive (MSFD)
GRI SSE Work Plan Project proposal of HEA
Why a „test phase“? Overview
Summary: 38th JSTC Meeting Sep 15 & 17, 2010 Kobe, Japan
Second Independent Evaluation of UNAIDS
European Statistical System Network on Culture (ESSnet Culture)
Roles and Responsibilities
Update on Standards of GRAP July 2019
Presentation transcript:

HAPUA WG No.5 (ESI Services) Updates The WG2, 5, 6 and Chairman of APGCC Meeting Jakarta, Indonesia ● 26 February 2009 By WG 5 Project Coordinator: MR. MELBURGO S. CHIU VP – Sales and Services, Luzon Generation, WM & DRFF National Power Corporation PHILIPPINES

Recommendations of the WC & APGCC  Conduct the study and identify features of existing bilateral arrangements to be used later to Multilateral Arrangement.  Carry out study on bilateral basis first between Members countries of Subsystem A. Commercial Issues, Tax, Regulation, Tariff System and Social Impact are to be included in the study.  Provide various contractual models between two countries and recommend for further improvement if needed.  Prioritize the major issue on the commercial/regulation tax and tariff aspect of the interconnection which may impasse the study.

WG5 Updates WG5 conducted on 25 Feb 2009 kick-off meetings of its 2 new projects that will undertake aforementioned APGCC-related tasks: WG5 conducted on 25 Feb 2009 kick-off meetings of its 2 new projects that will undertake aforementioned APGCC-related tasks:  Project No. 5 – Regulatory Issues & Challenges of Regulated Entity/ Owner/ Investor and Consumers  Project No. 6 – Bilateral Interconnection Arrangement

Project 5 Update  Inclusion of the following in its TOR Objectives and Scope of Study :  To identify the regulatory and legal challenges/ issues related to cross border electricity trading/ transaction.  Addition of the following Deliverable:  Information and recommendations on the regulatory and legal challenges/ issues related to cross border electricity trading/ transaction.

Project 5 Update Timeline of Work Plan was adjusted: Timeline of Work Plan was adjusted:  Conduct survey among members – March to Sept 2009  Initial draft of the report – Oct 2009  Preliminary results of the study – Dec 2009  Finalization of the study – March 2010  Submission of Project Completion Report – May 2010

Project 6 Update The Kick-off meeting of Project 6 was held with 18 participants from 9 member countries; 5 from Subsystem A and 2 each from Subsystems B and C. The Kick-off meeting of Project 6 was held with 18 participants from 9 member countries; 5 from Subsystem A and 2 each from Subsystems B and C. A brief presentation on the Project TOR already approved by HAPUA WC and APGCC meetings in December 2008 was given with additional recommendations as follows. A brief presentation on the Project TOR already approved by HAPUA WC and APGCC meetings in December 2008 was given with additional recommendations as follows.

Project 6 Update Terms of Reference (TOR) Terms of Reference (TOR)  The Meeting agreed to change the Project title from “Bilateral Contract Benchmarking” to “Bilateral Interconnection Arrangement” and the project deliverable will be the Model of Bilateral Interconnection Agreement.  The Meeting had detailed discussion on the instruction made by the APGCC that the relevant study should also include the social impact. Considering that it is a very broad issue, the Meeting agreed that it should be excluded from the Project scope of work.

Project 6 Update Framework of Study [1/3] Framework of Study [1/3]  An overview of the ASEAN interconnection: the existing, the ongoing and the potential projects in each Subsystem, highlighting on Subsystem A which is the Project first step, had been made with recommendation to update with current scheme of the ASEAN Power Grid.

Project 6 Update Framework of Study [2/3] Framework of Study [2/3]  According to the Project TOR, a common understanding had been emphasized that at the first step “Bilateral Contract” is defined here as contract for cross border power purchase and sale between utility and utility of HAPUA member countries. Also, to meet the 12 month timeline as committed in the TOR, the first stage of the Project will be focused mainly on Subsystem A.

Project 6 Update Framework of Study [3/3] Framework of Study [3/3]  The Meeting agreed with the project framework of study as proposed by the Project Leader with brainstorm covering technical, commercial, and legislations and regulatory issues. Pro and Con factors for cross border interconnection were also mentioned.  According to the meeting concept, benchmarking study of the Bilateral Interconnection Agreement will be based on exchanges of information, knowledge sharing to be developed as guidelines for the contract model.

Project 6 Update Model of Bilateral Interconnection Agreement, preliminary prepared by the EGAT Power Purchase Agreement Division, was presented to the Meeting. Model of Bilateral Interconnection Agreement, preliminary prepared by the EGAT Power Purchase Agreement Division, was presented to the Meeting.

Bilateral Interconnection Agreement Model Definitions and Interpretation Term Coordinating Committee Interconnections Interconnected Utility Responsibility Miscellaneous Provisions Sale and Purchase of Electrical Energy Billing and Payments Tax and Tariff Metering Default and Termination BIA Conditions Precedent

Model of Bilateral Interconnection Agreement (BIA) Model of Bilateral Interconnection Agreement (BIA)  Detailed discussion, comments and recommendations on each item had been deliberated and expressed.  Focus was made on commercial issue regarding the reliability and viability of the interconnection with conclusion that alternative provisions be incorporated in the model e.g. long/short term agreement, capacity and energy transactions, price quotation/fixed tariff with variable factors. Project 6 Update

Next step Next step  EGAT as Project Leader will develop the first draft of the Model Agreement as discussed and will distribute to all Project Members for consideration by e- mail expecting to have feedback incorporated in the second draft ready for the next meeting.

Project 6 Action Plan

Date and Venue of Next WG5 Meeting The WG 5 and its projects will have back to back meetings, in Vietnam around October Exact date will be confirmed at a later date. The WG 5 and its projects will have back to back meetings, in Vietnam around October Exact date will be confirmed at a later date.

Thank you! Terima kasih! WG5 Project Coordinator: MR. MELBURGO S. CHIU Vice President, Sales & Services, Luzon Gen, WM & DRFF National Power Corporation (NPC) Quezon Avenue corner BIR Road, Diliman 1100 Quezon City, PHILIPPINES Tel. no.: , Fax no.: