Discovery Meeting FEMA Region [#]. 2 Introductions.

Slides:



Advertisements
Similar presentations
In coordination with FEMA Kickoff Meeting Riverside County, CA May 27, 2010.
Advertisements

Jon Keeling, PE, CFM Carey Johnson, CFM ASFPM 2012 Conference May 22, 2012 The Mission of Dam Safety Hazard Mitigation – Kentucky’s Experience.
Risk MAP Discovery Matanuska-Susitna Borough Information Exchange Sessions March 2013.
FEMA’s Flood Risk Review Meeting: Building Confidence in Risk MAP Products 2012 ASFPM National Conference San Antonio, Texas May 24, :00 pm.
Alabama’s Floodplain Management Program Tom Littlepage Alabama Office of Water Resources.
Overview of FEMA Actions and Accomplishments Doug Bellomo July 13, 2009 National Flood Risk Management Summit.
FEMA Update: Flood Map Modernization and Risk MAP Presented on behalf of FEMA by David I. Maurstad, PBS&J.
Building Disaster-Resilient Places STEP ONE – Forming a Collaborative Planning Team.
Update on Use of Hazus for FEMA Risk MAP Flood Risk Products Shane Parson – RAMPP PTS (URS)
Update on Hazus AAL Study and Data
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Discovery Meetings [DATE]
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Northwest Florida Water Management District Monday, August 22, 2011.
In coordination with FEMA Scoping Meeting Lake County, California February 19, 2010.
FEMA’s Role in National Water Policy Supporting National Water Resource Policy Introduction Sandra K. Knight National Waterways Conference September 22-24,
Integrating Community Planning and Hazard Mitigation Planning Amanda Engstfeld FEMA Region X
Risk Map Early Demonstration Project Lackawanna County, PA CCO Meeting September 13, 2011.
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
Changes to FEMA Mapping John Grace, CFM Coastal Engineer - FEMA Region 1 - Boston March 14, 2014 – The Soil and Water Conservation Society – Winter Conference.
FLOOD STUDY Chemung County, NY FEMA REGION II November 18, 2010.
This is an audio-enhanced PowerPoint presentation. To hear the audio, please open this presentation in “Slide Show” view.
Flood Risk Datasets & Products in Greenville County, South Carolina Agenda Greenville Co, SC Overview Process, Examples, Lessons Learned, and Community.
‘Community Resilience Toolbox’ Training Series: Leveraging Public and Community Data to Assess Local Flood Risk Thursday, September 26, :00–1:00.
FLOOD STUDY Oswego County, NY FEMA REGION II February 7, 2011.
Risk MAP National Outreach Strategy and Community Engagement 2010 National Flood Conference April 14, 2010 Presented by: Vince Brown, Courtney Partlow.
FEMA’s Coastal Mapping and Management Process. 2 2 Welcome  Background and Coastal study methodologies  Technical Opportunities  Management Opportunities.
Mitigation can include structural and nonstructural efforts.
Risk Map Update FGCS Meeting Paul Rooney FEMA January 13 th, 2014.
Doug Bellomo April 6, NFDA Retreat & Conference “Risk MAP--Foundation, Transition, Integration” Risk MAP: An Update to NFDA.
Flood Map Modernization Multi-Hazard Flood Map Modernization NOAA Height Mod Conference 12/1/06 Dave Jula, Michael Baker Jr., Inc.
Dr. Shane Parson, PE, CFM, URS (RAMPP Team)
STATE of OREGON “Best Practices for Supporting Locals” Marian Lahav, Natural Hazards Planner, DLCD.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
Overview of Flood Program April Doug Bellomo, Director Risk Analyses Division Mitigation Directorate, FEMA.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Map Modernization June 11,  Obtain Best Available Data  Develop Partnerships for Production that Enhance Capability (local, state, fed)
Risk MAP Early Demonstration Projects in Region II 2011 Association of State Floodplain Managers May 17, 2011 Louisville, KY.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Information Exchange Sessions [DATES]
Northwest Florida Water Management District Wednesday, August 13, 2014.
The Status of NFIP Reform and Floodplain Mapping Mayors’ Water Summit December 8, 2010.
Risk MAP and Resilience Mari Radford, CFM, Mitigation Planner Alison Kearns, CFM, Community Planner FEMA Region III.
National Association of Flood & Stormwater Management Agencies June 28, 2011 Pacific Northwest Waterways Association Mid-Year Meeting.
A New Approach to Training and Outreach ASFPM Conference – San Antonio, Texas May 24, 2012.
FEMA’s Risk MAP Coastal Updates – An Overview Jonathan E. Westcott, P.E. ASFPM 2012 National Conference San Antonio, TX Session D.8.
Passaic County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division October 6th, :00-11:00.
In coordination with FEMA Kickoff Meeting Ventura County, CA April 29, 2010.
A National Hazards Information Strategy (NHIS) Helen M. Wood Director, Office of Satellite Data Processing & Distribution “A coordinated approach for using.
Map Mod Indiana Status Next counties up Fountain Parke Randolph Martin Ripley.
Mitigation Directorate FEMA’s Mitigation Directorate and Hurricane Emergency Management The Mitigation Directorate supports Hurricane risk assessment and.
FLOOD STUDY Burlington County, NJ FEMA REGION II November 29, 2010.
Sally McConkey, P.E., D.WRE., CFM Illinois State Water Survey ASFPM Chair USACE Silver Jackets Workshop – August 2012.
Northwest Florida Water Management District Monday, August 22, 2011.
USACE Flood Risk Management and Silver Jackets Workshop Sandra K. Knight, PhD, PE, D.WRE Deputy Associate Administrator for Mitigation, FEMA August.
Coastal Outreach Advisory Team FEMA Region II COAT Kickoff Meeting April 4, 2013, 10:00 a.m. Alejandro De La Campa, FEMA Region II-Caribbean Division Director.
0 FEMA Region 6 Floods: The Response and the Costs Bob Bennett Response Division FEMA Region 6.
Examples in Quantifying Flood Risk Doug Bellomo July 13, 2009 National Flood Risk Management Summit.
ASFPM National Conference 2009 Doug Bellomo June 11, 2009 Levees in a Risk MAP World.
Community Engagement to Advance Mitigation Action.
Risk MAP Discovery Malheur & Payette Counties Information Exchange Sessions July 2015.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
Oregon Statewide Flood Hazard Framework Geodatabase and Web Library, version 1.0 Seamless statewide GIS floodplain element that conforms to standards adopted.
Risk MAP Discovery Meeting Coos County, Oregon May 12, 2016.
FEMA Risk MAP City of Yakima – Lower Yakima Discovery Information Exchange Session May 9, 2016.
All-Hazard Mitigation Plan Update Susquehanna County Kick-Off Meeting April 28, 2016.
FEMA’s Risk Management Directorate and Flood Mapping Program 2016 National Flood Determination Association Conference Sarah Ice, Risk Management Directorate.
West Virginia GIS Conference WV Flood Risk Mapping Status and Needs Lee Brancheau, GISP FEMA Region III, Risk Analysis Branch May 5, 2016 West Virginia.
Risk MAP Program Welcome all attendees
Risk MAP & the Little River Basin
Disaster Mitigation Mitigation reduces the impact of disasters by supporting protection and prevention activities, easing response, and speeding recovery.
Presentation transcript:

Discovery Meeting FEMA Region [#]

2 Introductions

3 Meeting Objectives  Provide an overview of Risk MAP and Discovery  Present known and best available data  Discuss local flood risk and management  Discuss the responsibility for communicating about risk to the public  Discuss mitigation planning and projects  Identify the most high-risk areas in the watershed

4 Overview: Risk MAP Five year effort to modernize maps Result: digital flood data and digital maps for 92% of population Improved flood data quality Limited up-front coordination Scoping not mandatory Appendix I includes 200 pages of tables and templates Collaborative approach Goals: quality data, public awareness, action that reduces risk Watershed-oriented Focus on up-front coordination Discovery is mandatory Appendix I includes no templates and is currently draft

5 The Vision for Risk MAP Through collaboration with State, Local, and Tribal entities, Risk MAP will deliver quality data that increases public awareness and leads to action that reduces risk to life and property

6 Risk MAP Products Changes Since Last Map Improved outreach Increase transparency and trust Multi-Frequency Depth & Water-Surface Elevation (WSE) Grids 10%, 2%, 1%, 0.5%, 0.2% annual chance profiles Inundation 3 feet or less 3 to 6 feet 6 feet +

7 Risk MAP Products HAZUS Risk Assessment & National Flood Risk Layer Enables communities to understand risk by reference to existing structure loss Contributing Flood Hazard Factors Highlights areas of concern identified throughout project

8 Risk MAP DFIRM/FIS FIS Reports and DFIRM Maps will continue to fulfill regulatory requirements and support the NFIP

9 Discovery Discovery is the process of data mining, collection, and analysis with the goal of initiating a flood risk or mitigation project and risk discussions with the watershed When: After an area/watershed has been prioritized Before a Risk MAP project is scoped or funded Required for new and updated… Flood studies Flood risk assessments Mitigation planning technical assistance projects Why: Increases visibility of flood risk information, education, involvement Helps inform whether a Risk MAP project will occur in the watershed

10 Discovery Discussions  View collected spatial data across watershed  Discuss Areas of Concern and identify Risk MAP needs Need new flood study data? Need support with mitigation planning? Need mitigation projects? Need training on floodplain management? Need support developing a flood risk outreach program? What else can FEMA do to help your community become flood resilient?  Post-Discovery: FEMA to identify Risk MAP Projects