2008-2 through 2008-3. Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.

Slides:



Advertisements
Similar presentations
Companies can suffer numerous problems due to poor management of resources and careless decisions. In real-world decision- making, many organizations lack.
Advertisements

Artificial Limb Project By Casey Dill. Mission Statement This project will improve upon existing plans for an artificial arm with the same capabilities.
Filament Winding Machine. Project Name – Filament Winding Machine Project Number – P09226 Project Family – Competitive FSAE Autosports Systems Project.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Project Management November 2, Introduction Eric Lemmons Customer Project/Program Manager III Gary Obernuefemann Business Consulting IV.
Project Management October 2011 Inf Sys 3810 Information Systems Analysis Fall 2011 Understand Project Management principles.
P09233 Flight Parameter Measurements Michael Skube P09233
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
Lecture 2b: Software Project Management CSCI102 - Introduction to Information Technology B ITCS905 - Fundamentals of Information Technology.
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
Nov. 13, 2003CS WPI1 CS 509 Design of Software Systems Lecture #11 Thursday, Nov. 13, 2003.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
Review Questions List and describe the purpose of the four phases of Systems Analysis. The preliminary investigation phase quickly determines whether or.
MSD-II Project Review Modular Motion Tracking Sensors 1.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Ground Scouts P09207 Project Manager: Stewart Wadsworth Faculty Guide: Dr. Sahin Starting: Ending:
ECM Project Roles and Responsibilities
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
P09651 – Visible Spectrum Imaging System Lead: Dave Lewis Brian Russell Aditi Khare.
1-2 Training of Process FacilitatorsTraining of Coordinators 3-1.
Software Engineering Institute Capability Maturity Model (CMM)
Development Processes and Organizations
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Release & Deployment ITIL Version 3
S/W Project Management
Project Life Cycle Lecture - 18.
Shanghai Jiao Tong University 1 Course Introduction ME 250: Design & Manufacturing I School of Mechanical Engineering.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Sustainable Technology For The Global Market Family of Projects James Brown Rishitha Dias Casey Dill Neranjan Dharmadasa Kevin Klucher Eric MacCormack.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Computers Are Your Future © 2008 Prentice Hall, Inc.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Project Management Why do projects fail? Technical Reasons
Lecture 2. An Overview of Engineering Design JANUARY 2016 GE105 Introduction to Engineering Design College of Engineering King Saud University.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Project Final Presentation Joe Featherall.
 P09454: Design and Testing of Centrifugal Pump Components Rishitha Dias Kevin Klucher P09454.
ELVIS Educational Laboratory Virtual Instrumentation Suite: Phase II Abstract Problem Statement The goal of this project is to convert the EE 201 labs.
Rishitha Dias (IE): Team Manager Kevin Klucher (ME): Technical Lead John Hayles (ME): Design Engineer Reme Meck (ME): Turbomachinery Expert P09454.
Project Kick Off R09233: Flight Parameter Measurements Michael Skube (ME)
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
EDGE™ Final Project Plan Presentation P08043 – Mass Spectrometry Sample Preparation.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Stoimen Stoimenov QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Turbomachinery Flow Visualization P08453
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
HEMODYNAMIC SIMULATOR II P09026
P07107: Mission Control Procedures Aerospace Systems and Technology
P10457: D-R Process Improvement
Project Readiness Review P10029 – Air Muscle Artificial Limb
Final Status Update P09006 – Upper Extremity Exerciser
Turbomachinery Flow Visualization
Chapter 2: Development process and organizations
Optical Stage Redesign
Presentation transcript:

through

Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles will diffract the light of the laser and thereby allow for imaging.  Based on the data gathered from imaging these particles, the flow through the system can be visualized.

Starting Point  The existing test system was developed for MSD in & quarters under P08453  The system consisted of a centrifugal pump that sits within an automated and instrumented flow loop.  The apparatus and pump housing will be fabricated from optically clear materials to allow flow visualization within the pump using Particle Imaging Velocimetry  The system was designed and built with a modular construction so that design variations of impellers, diffusers, and housings may be easily exchanged.

Planning

Customer Needs  Perform PIV experiments to characterize different flows through the pump system  Use as an teaching tool for undergraduate coursework, projects & labs  Use for Graduate research & projects

Deliverables  Design & manufacture interchangeable Impellers & Diffusers (3 items each)  Set up & perform PIV measurement on pump system using new Impellers & Diffusers

Mission Statement The purpose of this project is to design & develop interchangeable impellers and diffusers which will work on the existing PIV system in order to characterize different flows through the pump system. Team will deliver 3 impellers & 3 diffusers for the existing system. Furthermore, team will also be responsible for setting up experiments and performing PIV reading using the new impellers & diffusers

Constraints  Budget:  Technical Expertise: Not all KGCOE ME students possess the requisite knowledge in Turbomachinery  Time: All deliverables must be performed within the allotted 22 week timeframe  Resources: Impeller and diffuser manufacturing requires precision machining operation  Platform: The project must build upon the existing PIV system (P08453)

Assumptions  All roles planned this quarter will be filled during both quarters  Existing test stand can be used and improved for this year’s project  Existing test stand is in acceptable condition  Outsourcing the manufacture of Impellers and Diffusers will not adversely effect the timeliness of the deliverables

Work Breakdown Structure Team MemberResponsibilities Team Leader Rishitha Dias Coordinate efforts to complete project, logistics, running meetings, purchasing, and resource acquisition Chief Engineer Kevin Klucher Lead the engineering effort and ensure the final project goals are met, interchangeability, flow testing, reduced setup time, and complete test stand ME-Design Engineer All modeling of structures in relevant programs, and fluid mechanics computation and simulations ME-Turbomachinery Expert Improvement of the fluid mechanics and flow through the turbomachinery portion of the test stand for better testing ME- Systems Integration LabVIEW integration with sensors installed within the PIV system, integration of the flow loop with the PIV unit

Team MemberWeek 1Week 2Week 3 Rishitha Dias Team Leader Set up meeting times, inform everyone of their tasks Establish team values and norms Ensure team members have access to necessary resources to begin allocated tasks Oversee the information exchange between all relevant members Kevin Klucher Chief Engineer Begin examination of lab test stand and lay out engineering objectives Develop study plan for engineers to learn the necessary skills set required for the project Work with Design Engineer in finalizing the impeller to outsource ME- Design Engineer Thoroughly examine EDGE and become familiarized with the project & predecessors Reverse engineer existing and familiarize with the system Examine the existing system and identify components that are critical to the project ME- Turbomachinery Expert Thoroughly examine EDGE and become familiarized with the project & predecessors Review/study turbomachinery technical material related to project ME- Systems Integration Thoroughly examine EDGE and become familiarized with the project & predecessors Develop study plan for engineers to learn the necessary skills set required for the project Examine previous LabVIEW setup & Code

Intellectual Property Considerations Project will be open source, open architecture Thorough patent research must be carried out prior to starting design phase

Team Values & Norms Punctual Thorough Accurate Professional & Ethical Committed Good Communication

Team Values & Norms Punctual Thorough Accurate Professional & Ethical Committed Good Communication – Team members should make a conscious effort to keep all members in the team informed with new information, knowledge and project developments, especially the two leaders

Required Resources Technical learning materials such as Turbomachinery text books, research papers Access to existing (P08453) PIV pump system Time with Faculty Guide, Dr. Day Access to manufacturing resources: CNC machining, Rapid prototyping or outsourcing CAD & Engineering software packages EDGE

Concept Development

Customer Needs Customers require a upgraded PIV system to perform reading on more sophisticated flow patterns provided by new impellers & diffusers. The new impellers and diffusers must be interchangeable and must fit with the existing pump system.

Brainstorming Questions How can the team best familiarize themselves with turbomachinery concepts? What material can be used to make the impellers & diffusers? Which manufacturing method will be used to make the products?

Risk Assessment  Technical expertise of ME student might be inadequate for the design task at hand  Time needed for impeller manufacturing will affect the timeliness of deliverables  Existing PIV module may not function as desired

Risk Assessment  Flow parameters are not met by the design  Design stage leaks over allocated time due to complications  Manufacturing resources at RIT might be inadequate to produce the required parts  Budget might be insufficient to cover outsourcing of manufacturing

Risk Management  Team Lead, Lead Engineer will work with faculty advisor to develop a plan to learn the technical skills required to design turbomachinary  Team lead will look for alternative manufacturing methods to save time, cost ex: rapid prototyping, outsourcing

Risk Management  Lead engineer designs a study plan with the assistance of faculty advisor & consultants to learn the required skills  Project lead allocates excess time for manufacturing parts & reallocate labor & resources to expedite other processes.

Risk Management  Lead engineer assigns a plan and adequate labor to ensure that the existing will meet required levels of operation  Lead Engineer will reevaluate and prioritize design goals to ensure timeliness of deliverables

Risk Management  Lead engineer will reevaluate design to ensure that products can be manufactured using resources at RIT (while meeting specifications) OR  Project Lead and Lead Engineer will work towards outsourcing the manufacturing to outside vendors

Risk Management  Project Lead will work with Faculty Advisor to reevaluate the budget OR  Reevaluate the scope of the deliverable to meet the existing budget