A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson,

Slides:



Advertisements
Similar presentations
CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine.
Advertisements

J.C Santiard CERN EP-MIC ANALOG AND DIGITAL PROCESSING FOR THE READOUT OF RADIATION DETECTORS  J.C. Santiard, CERN, Geneva, CH
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
Status of CMS CSC upgrade in LS1 Present CSC Status ME 4/2 project ME 1/1 project 5/20/2015 Petr Levchenko NEC 2013, Varna 1.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, CERN June 18, 2005.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
CMS Physics Meeting, Dec. 6, Analysis Note on the Validation of the ORCA Simulation of the Endcap Muon CSC Front-end Electronics S. Durkin -- Ohio.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, Fermilab October.
SiLC Front-End Electronics LPNHE Paris March 15 th 2004.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
US Cathode FE Board The Ohio State University University of California Davis University of California Los Angeles CERN.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
CMS EMU CSC Upgrade Digital CFEB B. Bylsma, CMS Upgrade Workshop, FNAL, Nov. 8, Ben Bylsma The Ohio State University.
Status of the CSC Track-Finder Darin Acosta University of Florida.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Front-end readout study for SuperKEKB IGARASHI Youichi.
DAQ for 4-th DC S.Popescu. Introduction We have to define DAQ chapter of the DOD for the following detectors –Vertex detector –TPC –Calorimeter –Muon.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Digital CFEB (an Update) B. Bylsma, EMU at CMS Week, March 16, Ben Bylsma The Ohio State University.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
DAQMB Status – Onward to Production! S. Durkin, J. Gu, B. Bylsma, J. Gilmore,T.Y. Ling DAQ Motherboard (DMB) Initiates FE digitization and readout Receives.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Stan Durkin CMS Upgrade Week 1 A Digital Pipelined Cathode Front End Board (DCFEB) Stan Durkin The Ohio State University.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
University of Wisconsin
A General Purpose Charge Readout Chip for TPC Applications
The Ohio State University
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
University of California Los Angeles
University of California Los Angeles
Cathode FE Board Update
Current Status of CSC Trigger Elements – Quick Summary
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
The digital read-out for the CSC system of the TOTEM experiment at LHC
BESIII EMC electronics
The digital read-out for the CSC system of the TOTEM experiment at LHC
Pre-installation Tests of the LHCb Muon Chambers
ME1/1 Electronics Upgrade
BUCKEYE has internal shift register which controls calibration
The LHCb Front-end Electronics System Status and Future Development
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Presentation transcript:

A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson, D. Herman, T.Y.Ling, C.L. Kim, P. Nylander, V.J. Sehgal, M. Studer,C. Rush

LHC Physics

1 LHC Year = 10 5 pb -1

Collecting and Analyzing the Physics will be difficult... Muon Chambers will clearly play a major role in LHC experiments

H -> ZZ ->    

CMS Detector

U.S. Endcap Muon System Alabama, UC Davis, UCLA, UC Riverside, Carnegie Mellon, Fermilab, Florida, Stoney Brook, Northwestern, Ohio State, Purdue, UT Dallas, Wisconsin

Endcap Cathode Strip Chambers

Electronics Overview -Cathode Strip Chambers 6 layer modules anode wire hits in azimuth direction induced cathode strips in radial direction Environment is Demanding Singles Rate ~100 KHz/strip Track Rate 300 KHz/chamber - Main Functions of Electronics generate trigger primatives for Level-1 - identify local charged track segments using both cathode and anode info acquire precise muon information for offline analysis - cathode strips: precision azimuthal position from interpolation of induced strip charges - anode wires: precision timing; course radial position from ganged wires.

Momentum Resolution BMU/EMU Only Momentum Resolution FULL CMS

CSC Electronics Organization Cathode Preamp/Shaper Asic - Ohio State SCA ASIC - U.C. Davis Cathode Readout Control - Ohio State Comparitor ASIC - UCLA/CERN Cathode PC Board - Ohio State Anode Preamp Shaper Disc ASIC - CMU/PNPI Anode LCT ASIC - UCLA Anode PC Board - UCLA/CMU/PNPI Motherboard DAQ - Ohio State Motherboard Trigger - UCLA DDU Board - Ohio State Low Voltage Distribution - Wisconsin

Front-End Electronics Organization 2268 cathode boards 1980 anode boards 480 motherboards

Cathode Preamp/Shaper ASIC 5 pole semi-gaussian shaper 100 nsec peaking time 1 pole/1 zero tail cancellation return to baseline in 400 nsec 4 channel prototype - AMI 1.8 u

Noise 1 % at Landau Peak -> 150  m Resolution kT limited FET amplifier, 7000 e’s at 250 pF

12 Bit Dynamic Range 8 bits for Landau peak 2 bits for Landau tail 2 bits for gas gain variation Good Linearity < 1% from 0 to 15 MIPs

BUCKEYE RADIATION TEST

EMU Radiation and Charged Track Backrounds

Cathode FE Board (July 1999) Buckeye Preamp/Shaper Analog Storage + Controller 12 bit ADC’s Digital Trigger Primitives 40 Mhz Word Transfer to Motherboard

Cathode FE Board Status BUCKEYE Preamp/Shaper Finalized Improvements for 1999: rate sensitivity 15X better latchup fixed Final Prototype due from AMI late August Preproduction run September/October UC Davis SCA ASIC Improvements for 1999: New design with LVDS signals due AMI late Aug. Preproduction run September/October Much faster 400 nsec digitization  150 nsec digitization

Trigger 1/2 Strip Generator 2nd Iteration Completed Presently testing Hopefully Complete OSU SCA Controller Uses XLINX FPGA Design Completed Board Layout Third Iteration works well One more board before production

Analog Storage Switch Capacitor Array (SCA) Free Running 50 nsec Samples Charge stored in capacitor array sample baseline (2 samples) 2-track resolution (3 samples ) Chambers are self triggered trigger logic determines good track in 500 nsec

Optical transceiver DAQ Motherboard 1999 Buffer/Event Builder/optical readout for all boards: cathode, anode, trigger 8 16K Fifos, FPGA controllers 75 MHz Optical Link Control FPGAs GLINKs FIFOs (16K,75 MHz) CFEB connectors JTAG CC B TM B ALCT B CLCT B CC TM CLCT ALCT

Counting House Electronics DDU Board Prototype, Final System with onboard pentium HP GLINK (1.5 Gbit/s, 75 Mword/s) 33 MHz PCI into Personal Computer

Cathode Integration Test

Results from Integration Test Same noise at 40 MHZ as at 2.5 MHZ ! Chamber and Electronics shipped to CERN this morning Test Beam should start Mid August

CERN Test Beam 1998 First Test of FE Electronics System: 3 96 channel anode FE Boards 3 96 channel cathode FE Boards 3 48 channel LCT trigger boards 1 trigger motherboard 1 DAQ motherboard Slow Control/JTAG Test at CERN H2 and X5 Beamlines GeV  Beam 740 GBq Cs 137 Source

CERN H GeV , No Source

Cathode Offline Resolution Spacial Resolution: -Single Layer - 6 layer chamber  ~ 100  m Time Resolution: Strip Position (cm) - single layer  ~ 7 nsec

CERN X GeV , Expected LHC  Rate

Conclusion Schedule is Tight US CMS Master L-1 Schedule -Start EMU installation 1/16/03 - Finish 8/29/04 EMU Electronics Schedule - Finish R&D by 12/ Full pilot system 2/ Construction 6/2000 Cathode Board on Schedule ! Realistic DAQ Motherboard built/tested ! Control Room DAQ boards in second design stage ! FE Board and ASIC Production Should Start on Time !