19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.

Slides:



Advertisements
Similar presentations
Road Map To Development September 2013 December 2013 February 2014 April 2014 July 2014 Data Submission WEQ 008 Assessment CO 283 Report GTL COs Draft.
Advertisements

DAGR Receiver Default Settings
Indicative Business Case
GERB Operations: Status Report J. Rufus GIST 26 Coseners House, RAL. 3 rd May 2007 © Imperial College London.
Need to Invest Investment Objectives and Case for Change Determine Potential Value for Money Strategic Case: Economic Case: Financial Case: Affordability.
SWE Introduction to Software Engineering
IMPACT Report SSMO Receiving Review– January 23, 2007.
CXC Manager’s Status Report Chandra User Committee Meeting Roger J. Brissenden 25 June 2002.
Informal document GRPE-70-14
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Informatics Programme Progress Integrated Digital Care Record & Person Held Record 3 rd June 2015 Nia Pendleton-Watkins, IT Programmes Director.
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
Level 1.5 Processing Updates Martin Bates, RAL GIST th December, 2005.
© Imperial College LondonPage 1 Operations Report/ Operational Calibration Strategy GIST 19, RAL 28th August 2003 J A Hanafin.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration DFMC Work Plan Update.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Cormac Neeson Space Engineering and Technology GERB Project Status 22/03/2004.
GIST May 2007 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-26 meeting.
EGR101-34R "lecture on hardware- software" FB 7/10/2004 Digital Electronics Logic Gates Logic gates work with the voltage level of the signals. They are.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
DGS Recommendations to the Governor’s Task Force on Contracting & Procurement Review Report Overview August 12, 2002.
Office of Sponsored Projects & Industry Partnerships eSRA Electronic Sponsored Research Administration Jeff Weiner Office of Sponsored Projects & Industry.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
1 November 6, 2003 Systems Sustainment Management, Fundamentals LOG-102 John Baranowski Defense Acquisition University Program Director, Sustainment.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
GIST October 2006 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-25 meeting.
Mid-Semester Presentation Design I October 3, 2013.
© Imperial College LondonPage 1 Calibration Commissioning Report GIST 19 RAL, 27th August 2003 GERB Instrument Team & Operations Team.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
ECE 4330 Project Proposal 1 Motor Music Presentation by Nick Hermanson.
The SaTH Foundation Trust Programme Deborah Shaw March 29th 2007.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
GIST th -29 th Apr B.Stewart RAL In-orbit Mirror Performance.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
18th GIST 14 th -16 th May 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Descan mirror bearing life tests Battery issues Operations during eclipse.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
Oracle/CTO Enhancement Project
US-Europe Data Exchange Meeting May Page 1 EUMETSAT Status Report Simon Elliott EUMETSAT Operations Department
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Level 1.5 Processing Updates Martin Bates, RAL GIST th April, 2005.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
1 Airborne Science Program EMASHSI Kick Off Meeting Interfaces NASA Ames Research Center University of California Santa Cruz Airborne Science & Technology.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
03-May-2007GIST 26: Abingdon GGSPS status Andy Smith RAL.
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
CAA 6 th Cross Cal Meeting RAL, th Oct 2007 RAPID/IES Calibration Status J.A. Davies.
26th Oct 2006CAA cross cal meeting, MSSL RAPID Calibration Status RAPID team.
GERB Ground Calibration Overview and Status J. Rufus
The European Contribution to eXTP
COSMOS Status David Sprayberry, Sean Points & Jay Elias
GERB/CERES comparisons
SDO Flight Dynamics Subsystem
Jesper Schou Instrument Scientist
RV Safety Alarms Education Test
Fiscal Year Budget Plan
TSF Upgrade Project Overview Resources Plans and Timetable
CubeSat vs. Science Instrument Complexity
Space Weather and HI Richard A. Harrison, RAL
Presentation transcript:

19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test

19th GIST 27 th -29 th August 2003 E Sawyer RAL Status GERB1- –GERB has been returned for modifications and recalibration. –Re-calibration first at Imperial –Battery mods, TBC tomorrow.

19th GIST 27 th -29 th August 2003 E Sawyer RAL Status GERB2 –In orbit –Switched off for eclipse season –Back on 28 th April –Off again now

19th GIST 27 th -29 th August 2003 E Sawyer RAL Status GERB3 –Delivered to Alcatel in June –Now integrated onto MSG 3 –Will be returned for battery modifications and calibration check

19th GIST 27 th -29 th August 2003 E Sawyer RAL Status GERB4 –ATP received from Eumetsat for 70% funding to match the approval by Eumetsat council. –Some activities started, parts procurement, detector blacking. –Some electronics manufacture will start at RAL. –Most subsystems will kick of Jan 04.

19th GIST 27 th -29 th August 2003 E Sawyer RAL Battery Proposals have been discussed with ESA that enable safe switch down without battery power, these have been assessed by Alcatel. Agreement has now been reached on the implementation, a kick-off meeting for GERB 1 will be held tomorrow. Relatively simple modifications will be incorporated and the unit re-qualified. GERB 3 will undergo similar treatment.

19th GIST 27 th -29 th August 2003 E Sawyer RAL Battery continued GERB on MSG1 has no battery assisted power down capability GERB software patch has been coded to detect sun close to the field of view and perform safe switch down, first test failed, some more work to do. Eumetsat may be able to modify MSG software to minimise risk to GERB in the event of a spacecraft emergency. The schedule for this is not defined

19th GIST 27 th -29 th August 2003 E Sawyer RAL Eclipse First Sun avoidance period started 12 February No battery safe switch down GERB switched to SAFE mode No MSG modified software There was one unplanned switch off of GERB during this period Strategy for next eclipse period (end August to end Oct) is to switch down to SUNBLOCK mode Current plan is that during eclipse periods, GERB will be in SUNBLOCK mode for approximately 5 hours.

19th GIST 27 th -29 th August 2003 E Sawyer RAL Stray light Two issues –Contamination when sun is close to FOV –Contamination due to sun illumination of Black Body.

19th GIST 27 th -29 th August 2003 E Sawyer RAL Stray light Close to FOV +/- 20 degrees 16.2 degrees

19th GIST 27 th -29 th August 2003 E Sawyer RAL Stray light Contamination of blackbody signal

19th GIST 27 th -29 th August 2003 E Sawyer RAL Stray light Contamination of blackbody signal

19th GIST 27 th -29 th August 2003 E Sawyer RAL Evolution of GERB One in orbit, data is now available Two complete instruments on the ground One more to build Minor hardware or software mods, no redesign No funding, but potential opportunity Inputs sought from the GIST and GOT