Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management.

Slides:



Advertisements
Similar presentations
M. Reichanadter, SLACLCLS FAC Meeting - April 29, 2004 LCLS Organization & Execution M. Reichanadter LCLS FAC Meeting April 29, 2004 LCLS.
Advertisements

Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Michael Scharfenstein FAC June 17, ES&H Status of Construction and Technical System Installations Michael Scharfenstein.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
Mark Reichanadter LCLS FAC October 29-31, 2007 Report to the LCLS Facilities Advisory Committee Project Management Project.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
M. Reichanadter LCLS Project June 2008 FAC Meeting Report to the LCLS Facilities Advisory Committee Project Management.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Jess Albino Facility Advisory October 30, 2007 FACILITY ADVISORY COMMITTEE BREAKOUT SESSION 5 TURNER CONTRACT OVERVIEW.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Mark Reichanadter LCLS FAC April 16-17, 2007 Report to the LCLS Facilities Advisory Committee LCLS Project Management M.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Mark Reichanadter LCLS FAC Oct12-13, 2004 Meeting of the LCLS Facilities Advisory Committee LCLS Organization & Execution.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
M. Scharfenstein - ES&H Coordinator 8 June 2009
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Javier A. Sevilla Interface & Configuration FAC Review October 12, Interface and Configuration Management Outline.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Mark Reichanadter LCLS FAC Apr7-8, 2005 LCLS Facilities Advisory Committee LCLS Organization & Executive Status M. Reichanadter.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Anthony Indelicato DOE-Princeton Site Office February 2014 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Project Management W. J. Foyt
Meeting of the LCLS Facilities Advisory Committee
Meeting of the LCLS Facilities Advisory Committee
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
Electron Beam Systems ETC and Methodology
DOE Mini-Review of the LCLS Project
LCLS Project Management
Details supporting the increase
DOE Review of the LCLS Project
Project Management Issues John N. Galayda, SLAC April 24, 2002
DOE Review of the LCLS Project
Integrated Safety and Environmental Management
CONVENTIONAL FACILITIES
DOE Review of the LCLS Project
Installation Status & Operational Readiness Process
DOE Review of the LCLS Project
Preliminary Project Execution Plan
Department Of Energy Review Linac Coherent Light Source Project
DOE Mini-Review of the LCLS Project
Electron Beam Systems ETC and Methodology
DOE Review of the LCLS Project
LCLS e- Beams System Overview
CF Scope, Management & Organization
DOE Status Meeting of the LCLS Project
Presentation transcript:

Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management M. Reichanadter / SLAC

Mark Reichanadter LCLS FAC October 12-13, Outline Status of the LCLS Progress in the past six months Project Management Cost and Schedule Performance Contingency Allocation Organization and Integration Plans for the next six months Risks/challenges ahead

Mark Reichanadter LCLS FAC October 12-13, 2006 LCLS Status Cost Status CF subcontracts substantially over LCLS estimates Descope CLOC to stay within TPC Schedule Status Technical systems maintaining reasonable schedule progress Milestone performance ~OK, but installation activities are behind. Construction start delayed due to high subcontract bids Working new schedule & CP. New Co- and Beneficial milestones. Construction packages of LCLS beampath now awarded and construction is underway! Recent shutdown of Turner activities. Frequent cable discoveries. Management Status Procurements going reasonably well with the dedicated cell Consultants (Miller/Dee), expediter and BOA’s are on board Integration management team in place Manage the technical / CF interfaces and facilitate installation

Mark Reichanadter LCLS FAC October 12-13, TEC Project Performance - July 2006 LCLS showing steady progress overall. 31% TEC comp 28% TPC comp SPI = 0.93 CPI = 0.95 $ burn rate ~$5-6M per/mo Labor burn rate ~$2.5M/mo At SLAC ~165 FTE’s ~350 heads on LCLS

Mark Reichanadter LCLS FAC October 12-13, LCLS Project Performance – July 2006 Injector 95% complete in Jan07.

Mark Reichanadter LCLS FAC October 12-13, TEC Contingency Performance – July 2006 ~$19M contingency allocated in July. ~$18M, CF Gp #1 ~$0.4M Linac ETC ~$1.2M, XTOD ETC ~$0.2M, XES ETC All ETC’s updated except CT & CF. Aug Pending BCR’s; CF ETC CT ETC Bid Group #2 CLOC to be descoped to maintain adequate contingency.

Mark Reichanadter LCLS FAC October 12-13, Major Schedule Variances Linac System: SPI = 0.72, CPI = 1.09 Linac (and Injector) controls hardware current installation. Work behind schedule but recovering. Linac Controls work, RF waveguides and vacuum hardware for 2007 installation being deferred to support immediate needs. Undulator System: SPI = 0.85, CPI = 0.92 Single Undulator Test (SUT) system development at ANL developed into a larger test than anticipated. SUT is nearing completion. SLAC’s Magnetic Measurement Facility (MMF) is not yet prepared for undulator segment tuning. The Undulator alignment monitoring HLS behind on hardware procurements. Increased SLAC-LCLS oversight to recover schedule. XES Controls System: SPI = 0.72, CPI = 1.07 XES controls effort has been focused on preparations for Injector installation and commissioning period. Replan future XES controls work.

Mark Reichanadter LCLS FAC October 12-13, Schedule Status Old Schedule – Critical Path (CP) - Und B.O. – install – FEL commission. Total float 213d to CD-4. Near CP – Undulator vacuum system, Undulator testing, New Schedule – Updating project schedule and CP with Turner BO milestones. Provides “Co-occupancy” Target dates allow installation prior to BO. Estimate ~60 days loss of float resulting from evaluation of bids, additional value engineering effort and possible options. Near-term L3 milestone performance 6/2/06 – 1st Article Undulator 1 SLAC. Done – 6/12/06 7/10/06 – Award CF subcontracts Done, Group #1 packages out, Group #2 ~ready, NTP to Turner on Aug 1 7/28/06 – MMF Qualified & Ready to Measure Prod Undulators ~Aug 28. Benches are installed and measuring the first magnets. 8/21/06 – FY06 Shutdown: HW Reqd for Installation Aug 16 Conducted Hardware Installation Readiness Review Aug 30 Conducted Controls Installation Readiness Review 11/15/06 – Start Drive Laser Commissioning. On schedule

Mark Reichanadter LCLS FAC October 12-13, LCLS Organization Chart Strengthened Senior Mgmt APD-C APD-E (TBD) IMT Procurement Miller Dee Conv. Fac. Turner Jacobs T3

Mark Reichanadter LCLS FAC October 12-13, LCLS Integration - IMT addresses the “5I’s” LCLS establishes IMT IMT under direction of RM Boyce Described under PMD Integration management (gaps/conflicts) Review and ownership of Interfaces (ICD’s) CF-Tech leads identified for construction Installation readiness & planning Aug06 shutdown underway APD Engineer – To facilitate LCLS system engineering and inter-lab integration Interview process complete LCLS Design Reviews - ~35-40 have been conducted across the project to mature the design, validate progress and identify integration issues early.

Mark Reichanadter LCLS FAC October 12-13, LCLS design continues to mature LCLS Specs 77% PRD’s 65% ESD’s Most open requirements are in photon area. Need to do better. 100% RDS’s 92% ICD’s IMT reviews ICD’s

Mark Reichanadter LCLS FAC October 12-13, LCLS Risk Registry Risk registry has been modified to provide a more tactical plan (FAC recommendation) System Managers identify and ‘own’ risk Improves consistency on risk characterization SM’s have authority and resources to prioritize risks. Risks reviewed each month at senior mgmt meeting Bulleted tasks identified to reduce risk Status punch list each month Avoid the broad, non-actionable risks

Mark Reichanadter LCLS FAC October 12-13, Near-Term Project Objectives Project Management Hire APD-Engineering Emphasize the IMT in resolving integration issues Cost Management Complete ETC’s and ensure remaining scope fits LCLS TPC Schedule Management Complete Injector / Linac shutdown effort safely Injector (RF Gun – BC1) Conduct Injector ARR and begin laser/injector commissioning Deliver 50% of undulators to MMF ~ Dec06 Monitor MMF measurement throughput Perform on civil construction, safe operations are a must to stay to cost/schedule.

Mark Reichanadter LCLS FAC October 12-13, Risks / Challenges Ahead Execution Phase – Safety is primary concern Fully staffed in ES&H, construction safety and oversight (UTR’s) Regular job site inspections, enforced procedures Aligned DOE, SLAC, Turner, Subcontractor team Technical / Quality – Missing scope/gaps are a risk Scrutinize ICD’s, LCLS / LUSI interface needs attention Improve technical specs, continue emphasis on design reviews Emphasize role and influence of IMT and APD-E Schedule - Installation activities and coordination IMT to facilitate installation planning Need to get APD-E on board Cost - Site conditions, field orders and staying to schedule CLOC descoped to maintain adequate contingency Recent bottoms-up ETC for the project Strong procurement and negotiating team in place