ECE 477 Design Review Team 7  Spring 2006. Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.

Slides:



Advertisements
Similar presentations
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Advertisements

ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation.
ECE 477 Design Review Team 13  Spring 2006 Elmer Chao (not pictured), Matt Cozza (not pictured), Joe Waugh (not pictured), Evan Zelkowitz (not pictured)
ECE 477 Design Review Team 15  Spring 2013 Jackson McCormick, Andrew Batek, Carey Woolet, Justin Lindley.
Jason CrayJoseph Mundackal Michael WarscoRyan Sherlock.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
ECE 477 Design Review Group 1  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 10  Spring 2012 Paste a photo of team members here, annotated with names of team members. Nathan Irvin Will Bouchonnet Allen.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review – Spring 2010 Team 15. Team Members.
ECE 477 Design Review Team 6  Spring 2011 Left to right: Kirk Iler, Brian Bentz, Stephen Wolf, Fuhe Xu.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
ECE 477 Design Review Team 1  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger Formal Design Review.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 2  Spring 2010 Digi-Brush Josh LongCaleb Ayew-ewKatie Schremser.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
Shiv Yukeun Donghan Robert.  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
ECE 477 Design Review Group 7  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Design Review Team 4  Fall 2010 (L to R) Andy Sydelko, Chris Cadawallader, Mike Wiliams, Craig Pilcher.
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 2  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 5  Fall 2009 Ben Carter – Jacqui Dickerson – Ian Oliver – Dennis Lee.
ECE 477 Design Review Team 2  Spring 2006 Prashant Grimella Andy Brezinsky Tim Sendgikoski Clark Malmgren.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
ECE 477 Design Review Team 14  Spring 2006 Jason, Nathanael, David, David.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Design Review Team 02  Fall Outline Project overview - KProject overview - K Project-specific success criteria -KProject-specific success.
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
ECE 477 Design Review Team 10  Spring 2007 JUSTIN AZAD AFIFF NUHAIRIADAM.
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
ECE 477 Design Review Team 1  Spring 2008 Alan BernsteinIan AlsmanIlya VeygmanDarshan Shah.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 12  Spring 2006 EricDaniel Atandra Sriharsha Aasenda Silva Burman Vengapaty.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
ECE 477 Design Review Team 5  Spring Project Overview Inertial based character recognition deviceInertial based character recognition device Battery.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
Eric Tarun Craig Dave ECE 477 Design Review Team 9  Spring 2006 Galamback Chawla Noble Kristof.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Design Review Team 5  Spring 2010 Fred Grandlienard Andrew Gregor Kevin Mohr Ryan DeFord.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
ECE 477 Design Review Team 5  Fall 2009 Ben Carter – Jacqui Dickerson – Ian Oliver – Dennis Lee.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Design Review.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE445: Senior Design Spring 2015 Team 17: Weather Jukebox Sang Yun Bang, Thomas Fedrigon, Shanda Lu.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
Team We Ate 9 No Glove, No Love.
ECE 477 Design Review Team 6 - Spring 2012
ECE477 Group 7 Success Criteria
Presentation transcript:

ECE 477 Design Review Team 7  Spring 2006

Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria Block diagramBlock diagram Component selection rationaleComponent selection rationale Packaging designPackaging design Schematic and theory of operationSchematic and theory of operation PCB layoutPCB layout Software design/development statusSoftware design/development status Project completion timelineProject completion timeline Questions / discussionQuestions / discussion

Project Overview Alternative HID that can replace the mouse.Alternative HID that can replace the mouse. Package the HID into a wearable glove.Package the HID into a wearable glove. Use feedback from bend sensors and/or pressure sensors to simulate mouse clicks.Use feedback from bend sensors and/or pressure sensors to simulate mouse clicks. Use two three-axis accelerometers to simulate mouse movement.Use two three-axis accelerometers to simulate mouse movement. Two components: glove and base station.Two components: glove and base station. Glove communicates to base station via RF.Glove communicates to base station via RF. Base station decodes RF data into USB signals and sends them to PC.Base station decodes RF data into USB signals and sends them to PC.

Project-Specific Success Criteria An ability to detect “finger taps” based on pressure sensor and bend sensor data.An ability to detect “finger taps” based on pressure sensor and bend sensor data. An ability to detect hand movements with an accelerometer.An ability to detect hand movements with an accelerometer. An ability to detect wrist twisting with an additional accelerometer.An ability to detect wrist twisting with an additional accelerometer. An ability to wirelessly transmit encoded finger/wrist/hand movements to base station.An ability to wirelessly transmit encoded finger/wrist/hand movements to base station. An ability to translate encoded finger/wrist/hand movements into “Windows mouse” format (using USB protocol”An ability to translate encoded finger/wrist/hand movements into “Windows mouse” format (using USB protocol”

Block Diagram

Component Selection Rationale Glove uC - Freescale MC9S08GT16Glove uC - Freescale MC9S08GT16 –Packaging availability = QFP Cypress CY7C60223 = DIPCypress CY7C60223 = DIP –Standby current = 25 nA Cypress CY7C60223 = 10 uACypress CY7C60223 = 10 uA – Mhz Cypress CY7C60223 = MhzCypress CY7C60223 = Mhz –8 channel ATD Cypress CY7C60223 = no ATDCypress CY7C60223 = no ATD

Component Selection Rationale Base Station uC - Freescale MC908JB16FAEBase Station uC - Freescale MC908JB16FAE –Packaging availability = QFP Cypress CY7C63823-PXC = DIPCypress CY7C63823-PXC = DIP –Keyboard interrupts –Documentation –Keeping it in the family

Component Selection Rationale RF Module – Spark Fun RF-MiRFRF Module – Spark Fun RF-MiRF –Range = 50 ft (125 ft line of sight) Freescale xx3316 = 6 ftFreescale xx3316 = 6 ft Cypress CYWM6934 = 30 ftCypress CYWM6934 = 30 ft –Availability = immediate Cypress CYWM6934 still not receivedCypress CYWM6934 still not received

Component Selection Rationale RF Module – Spark Fun RF-MiRFRF Module – Spark Fun RF-MiRF –ShockBurst Technology

Component Selection Rationale Accelerometer – Freescale MMA7260QAccelerometer – Freescale MMA7260Q –Current consumption = 500 uA STMicroelectronics E-LIS3L02AS4 = 1.5mASTMicroelectronics E-LIS3L02AS4 = 1.5mA –Available packaging = QFP STMicroelectronics E-LIS3L02AS4 = SOICSTMicroelectronics E-LIS3L02AS4 = SOIC –Cost = free STMicroelectronics = $50 (5 X $10)STMicroelectronics = $50 (5 X $10)

Component Selection Rationale Step-Up DC-DC Converter – Maxim MAX1705Step-Up DC-DC Converter – Maxim MAX1705 –96% efficiency Need 95% for power consumption predictions based on case study to holdNeed 95% for power consumption predictions based on case study to hold –Low battery detector –Cost = free

Packaging Design Unibox 171 Battery EnclosureUnibox 171 Battery Enclosure –4.37” X 3.25” X 1.50” (L X W X H external) –Able to hold two 1” high accelerometer modules –On the top of the enclosure Low battery LEDLow battery LED On/Off switch, reset buttonOn/Off switch, reset button Axis switchAxis switch –Velcro strap to secure to forearm

Packaging Design Unibox 171 Battery EnclosureUnibox 171 Battery Enclosure

Packaging Design Glove with 2 bend sensors and 1 pressure sensorGlove with 2 bend sensors and 1 pressure sensor

Packaging Design Immersion CyberGlove IIImmersion CyberGlove II

Schematic/Theory of Operation The Glove schematic is laid out in a modular structure, with each module containing a key component of the overall circuit: The Glove schematic is laid out in a modular structure, with each module containing a key component of the overall circuit: Mobile Station Power SupplyPower Supply Sensors/User InterfaceSensors/User Interface AccelerometersAccelerometers MicrocontrollerMicrocontroller Base Station MicrocontrollerMicrocontroller

Schematic/Theory of Operation Power Supply 2 AA Batteries (NiCd/NiMH) (3.0V supply) Input2 AA Batteries (NiCd/NiMH) (3.0V supply) Input DC-DC Boost Converter (MAX1705)DC-DC Boost Converter (MAX1705) –Outputs 3.3V –Supplies up to 850mA “Low Battery” detector when battery voltage reaches 1.5V“Low Battery” detector when battery voltage reaches 1.5V

Schematic/Theory of Operation

Recommended by Data Sheet

Schematic/Theory of Operation 1.5V LED Without series resistance 1mA sink Battery voltage drops to 1.5V, LBO goes to low state Low Battery Detector

Schematic/Theory of Operation Low Battery Detector 1.25V 1.5V Voltage divider… Route from + terminal to - terminal

Schematic/Theory of Operation 1.233V ref 3.3V needed Voltage divider… Output configuration

Schematic/Theory of Operation 3-Axis Accelerometers Analog outputs representing acceleration along 3 orthogonal axes.Analog outputs representing acceleration along 3 orthogonal axes. –Filtered by 1 st order low pass filter to reduce high frequency noise. (10kHz -3dB cutoff) Digital inputs select sensitivity and sleep mode.Digital inputs select sensitivity and sleep mode.

Schematic/Theory of Operation

Low pass filters 10kHz -3dB cutoff (Recommended in data sheet)

Schematic/Theory of Operation Sensors/Interface Bend Sensors – Click OperationBend Sensors – Click Operation –10kOhm in rest state, ~35kOhm MAX 1lb applied Pressure Sensor – Click EnablePressure Sensor – Click Enable –Filtered by 1 st order low pass filter to reduce high frequency noise. (10kHz -3dB cutoff) On/Off switch – disconnects batteryOn/Off switch – disconnects battery Axes switchAxes switch –Move mouse up-down-left-right, or forward-backward- left-right

Schematic/Theory of Operation Voltage difference between 0lb and 1lb = 3.3*max(R/(10k+R) – R/(35k+R)) ~= 1V R ~= 20k

Schematic/Theory of Operation

Microcontroller (Mobile) 500kHz Clock Frequency500kHz Clock Frequency Sensors/AccelerometersSensors/Accelerometers –A/D module RF ModuleRF Module –I/O input pins/shift register Programming/DebuggingProgramming/Debugging –6 pin header for programming –Switch on reset pin –IRQ brought out to a header

Schematic/Theory of Operation

Recommended by data sheet

Schematic/Theory of Operation Programming /Debugging

Schematic/Theory of Operation Microcontroller (Base) 6MHz Bus Speed, 5.0V USB power supply6MHz Bus Speed, 5.0V USB power supply RF moduleRF module –Connected RF ModuleRF Module –Powered by on-board 3.3V regulator –I/O input pins/shift register (5.0V to 3.3V bidirectional level translator) –“Data Received” pin connected to IRQ Programming/DebuggingProgramming/Debugging –USB, switch for reset pin

Schematic/Theory of Operation

Recommended/required by data sheet

Schematic/Theory of Operation 5.0V to 3.3V Bidirectional Level Translator Translator

PCB Layout Outline Packaging Constraints and InterfacingPackaging Constraints and Interfacing EMI ReductionEMI Reduction –Power System –Capacitors –Component Placement RFRF SensorsSensors Clock CircuitryClock Circuitry –Traces

UpdateOld PCB Layout

PCB Packaging Not too bulkyNot too bulky Fit on wristFit on wrist All Surface Mount PartsAll Surface Mount Parts –Mostly mil spaced headers100 mil spaced headers Currently x 2.285Currently x 2.285

PCB Interfacing SensorsSensors RFRF AccelerometersAccelerometers DebugDebug PowerPower RF Modules BDM AXIS Accelerometers LED On/Off Battery Reset USB Sensors Base Station Glove IRQ

PCB Power System Glove Wide Power/Ground RailsWide Power/Ground Rails Stable GroundStable Ground Copper PourCopper Pour Top Power Bottom Ground

PCB Power System Base Wide Power/GroundWide Power/Ground Multipoint GroundMultipoint Ground Copper PourCopper Pour Bottom Power Top Ground

PCB Capacitors Decoupling CapsDecoupling Caps Bypass CapsBypass Caps RecommendedRecommended

PCB Component Placement RFRF A/DA/D Clock CircuitryClock Circuitry Clock Circuitry RF Modules A/D Inputs

PCB Traces Trace width – 12 milTrace width – 12 mil Power/Ground – milPower/Ground – mil Avoided 90 Degree AnglesAvoided 90 Degree Angles Minimized amount of viasMinimized amount of vias –28 in updated glove –22 in updated base station 60 mil Trace Avoid!

Software Design/Development Status Transmitter –Main routine Check sensor data place in FIFO bufferCheck sensor data place in FIFO buffer Check accelerometer data place in FIFOCheck accelerometer data place in FIFO Do power managementDo power management – RF timer interrupt Check FIFO and send data.Check FIFO and send data.Receiver –Main routine Checks buffer and converts data to USB format to be sent to host.Checks buffer and converts data to USB format to be sent to host. –Timer interrupt. Catch RF data and place in buffer.Catch RF data and place in buffer. –USB interrupt routine

Project Completion Timeline Final Documentation Packaging Testing Software Building 4/234/164/94/23/263/193/123/52/27Week

Questions / Discussion