1 LSSG Green Belt Training Improve: How do we get there?

Slides:



Advertisements
Similar presentations
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
Advertisements

Project leaders will keep track of team progress using an A3 Report.
Ledger Size DEFINE / BACKGROUND INFORMATION Problem Statement: Goal OR Objective: Scope (if needed):  Problem Statement  Project Scope  Goal Target.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Presented By The University of Texas-School of Public Health
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Chapter 10 Quality Improvement.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
Lean Sigma Overview and its Significance to Project Management Harjit Singh, PMP
Overview of Lean Six Sigma
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
1 Industrial Design of Experiments STAT 321 Winona State University.
“Safety is a Measure of Success”
ENGM 620: Quality Management 26 November 2012 Six Sigma.
Black Belt Level DMAIC Certification Checklist
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
MGS8020 Improve.ppt/Apr 9, 2015/Page 1 Georgia State University - Confidential MGS 8020 Business Intelligence Improve Apr 9, 2015.
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Agenda Week 1 Define Day 1 Introductions & Agenda LSS Overview
Designing, Controlling, and Improving Organizational Processes
Quality improvement. What is 6 sigma?  Level of 6 sigma: 3.4 DPMO (Defects Per Million Opportunities)  Indexes concerned:  FTY (First Time Yield) 
Sigma Lean Execution Plan for Black Belts
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Introduction to Kaizen Introduction Kaizen Facilitation.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
Kaizen Event Flow Kaizen Facilitation Project Management.
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
Traditional Economic Model of Quality of Conformance
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram) What solutions.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Define Phase Wrap Up and Action Items. Define Phase Overview—The Goal The goal of the Define Phase is to: Identify a process to improve and develop a.
Analyze Wrap Up and Action Items
Name: Project: March – April 2017
TM 720: Statistical Process Control DMAIC Problem Solving
Lean Six Sigma Road Map Improvement Process Road Map
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Name: Project: March – April 2017
Control Phase Wrap Up and Action Items
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Define Phase Wrap Up and Action Items
Name: Project: MSD IT – December 2017
Quality Management Six Sigma
Framework for Success: DMAIC
6 Six Sigma Basics GEOP 4316.
DMAIC Analyze, Improve, Control
LEAN SIX SIGMA PROJECT TEMPLATE
Improve Phase Wrap Up and Action Items
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Measure Phase Wrap Up and Action Items
Name: Project: MSD IT – December 2017
Lean-Green belt six sigma program
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

1 LSSG Green Belt Training Improve: How do we get there?

2 DMAIC Six Sigma - Improve Develop Potential Solutions Identify potential solutions through data analysis, brainstorming, benchmarking Create Future State Develop and implement future state process map and/or innovative solutions for the project Evaluate and Mitigate Risk Analyze the impact of the solution and error proof the process Measure Control Analyze Improve Define

3 Agenda for Improve 1. Optimize Solutions (6 Sigma) 2. Kaizen Events (Lean) - Develop and Simulate Future State 3. Mistake-Proof New Process/Risk Management 4. Develop / Implement Pilot Plan 5. Service Recovery

4 Six Sigma Improve Activities Identify available relationships Determine interactions Reduce list of X’s to a critical few Determine optimum settings for X’s Tools: Multivariate Analysis, DOE, RSM/Optimization, and Simulation Implement improvement Verify benefits Verify measuring system

5 Lean Improve Activities Plan for and conduct a week long Kaizen event Learn by doing, and doing it again Repeat Kaizen’s for key processes The Lean Transformation Fight Fires React Improve Processes time “Each new improvement reveals new problems!” Freddy Ballé

6 Kaizen Events The “Improve” process for Lean, where obvious waste has been identified A team-based, 3-5 day event with no down time Cross-functional teams meet full-time (100% of their time!) to solve a specific problem with pre- specified scope, metrics and goals Results presented to management at the end of the week, with project completion in 30 days Assumption is made that the team will have all the support and resources needed from management

7 Kaizen Events Meet within 100 feet and “walk” the process to identify opportunities that are not working right and do not require detailed data to justify change Count the number of steps within and between tasks; estimate task and handoff times; add improvement opportunities to Value Stream Map Share “peak” experiences (“Appreciative Inquiry”) Develop hypothesis and test immediately to see if it works Make quick and not so elegant changes Expect the unexpected!

8 Kaizen Event Team The team should include the following: 6-8 people People who work in the process and will have to live with the changes and at least one supervisor from this area Representatives from upstream and downstream processes Support personnel (IT, HR, etc.) One neutral observer Plus a neutral facilitator

9 Kaizen Event - Day 1 Travel - am Lean Classroom Training - pm All participants required to attend half-day Lean training (Intro, waste, VSM, takt time, etc.) Review plan for the week Clarify charter and scope; special needs; available data Clarify roles/form sub-teams Distribute materials/post white paper on walls

10 Kaizen Event - Day 2 Current State Mapping - am Sub-teams create current process map using large yellow post-its Label with key data; identify missing data Identify major opportunities for improvement Adjust project scope if required Interview Employees/ Collect Data - pm Sub-teams time a sample of existing sub-processes (with stop-watches) Key personnel interviewed for knowledge of problems, suggestions for improvement, and reasons why sample data collection may not be “normal” May be preceded by a tour of the entire process

11 Kaizen Event - Day 3 Complete Current State - am Report-outs of key learnings Addition of collected data Identify key opportunities Experiments to test viability Management progress review Create Future State - pm Perform experiments brainstorm improvement opportunities and potential benefits Create high level future state (“desired” state)

12 Kaizen Event - Day 4 Complete Future State Map - am Include full value stream linked to customer Return to plant to test proposed final recommended changes Fine tune improvements Create high-level documentation of new standard procedures Create presentation - pm

13 Kaizen Event - Day 5 Practice Presentation - am Noon - Lunch Presentation to management Debrief; Discuss obstacles to success Next Steps/Responsibilities/Kaizen “Newspaper” Create new standard procedures Write report /Send to stakeholders Celebrate!!! #Action steps to achieve goal ResponsibilityDue Date Date Completed % Complete Goal_________ Date__________ Implementation Team______________

14 Poka-Yokes: Product and Service Failsafing Keeping a mistake from becoming a defect Prevention Determine potential problems Develop fault-proof designs Create prevention plans A proactive approach Detection Develop signaling system/identification Plan for quick response at operator level Do root cause analysis; use “5 Whys” Eliminate special causes An extension of FMEA

15 Prevention vs. Detection Order New Order Call Center PreventionDetection

16 Process for Mistake Proofing Describe Defect and Defect Rate Determine Defect Location Study the Process Flow Observe the Process Identify Errors and Determine Cause Determine Prevention Method Test/Re-test in Extreme Conditions

17 Service Recovery A real-time response to a service failure Involves training front-line workers to immediately respond to customer problems Involves identification of potential “incidents” and determination of optimum response Process Improvement can take too long. What do we do in the meantime?

18 Service Recovery - How it Works “Empowerment can only take place when every associate can personally assure customer satisfaction every time!” Gary K. Johnson Process Identification Incidents Remedies Cost of Incident Measurement of Frequency Customer Identification Mission Statement Cost of Poor Quality