DN Interruption Reform Gas Customer Forum Mark Freeman 10 March 2008.

Slides:



Advertisements
Similar presentations
The difference empowerment makes Henry Tam Head, Civil Renewal DCLG.
Advertisements

UK Council of Research Repositories UKCoRR Launch - 21 st May 2007 University of Nottingham.
Using the University's repository Bill Hubbard SHERPA Manager.
THE sustainability one-stop-shop for further and higher education across the UK.
East Midlands CAN Thursday 4 th September. EMCAN Chairs Update Thursday 4 th September 2014.
The changing geography of the private rented sector in England between 2001 and 2011 Nigel de Noronha Doctoral Researcher, CCSR.
Priorities for Rail Investment in the East Midlands Andrew Pritchard Director of Policy & Infrastructure February 2012.
Do you know the way to San Jose? LO: To use an 8 point compass to describe where places are relative to each other. All of you will name the directions.
Demand Forecasting and Gas Flow Data NW GRI Transparency Workshop Chris Logue – March 2009.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
APR Site Visit and Drop-In Research APR Evidence.
Great Britain Made by: Lyamkina Yulia. Satellite image of Great Britain.
UK GAS DISTRIBUTION DN Charging Methodology Forum NGGD Oct-14 Mod0186 Dave Chalmers / Mike Lapper.
Confidential DN Interruption Tenders 2008 Interruption Seminar Ofgem 19 th August 2008 Version 1.0 Final.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
2009 Annual Interruption Invitation Gas Customer Forum - 27th of March Steven Vallender and Jonathan Dennett.
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Faslodex (Fulvestrant) Trust Formulary Status February 2015 For the use of Healthcare Professionals March 2015.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Interruption Update Liz Spierling Commercial Manager.
LDZ System Charges – Structure Methodology 26 April 2010.
BTEC Travel and Tourism Unit 14 Exploring Airports and Airlines P1 and P2 NAME:
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Shrinkage Forum 22 January 2014 Roy Malin /15 Shrinkage Proposals  Initial proposals issued December 2013  Proposed Shrinkage Quantities calculated.
East Midlands CAN & NEA Fuel Poverty Forum. EMCAN Chairs Update.
LDZ Shrinkage Forum Jonathan Dennett Elexon 22 nd June 2006.
1 Operating Margins – Request for Proposals Transmission Workstream 6 th April 2006 Dave Smith, National Grid NTS.
JURA AGM 1pm, 28 May 2010 MoJ HQ, Lower Ground Floor Meeting Room 4.
IEA Bioenergy Conference 2015 UK Biomethane Market Update 50 Plants Injecting Gas by End th October 2015 John Baldwin Managing Director CNG.
Organ Donation Past, Present and Future Donation after Brain-Stem Death DBD Dr Rowan Burnstein Dr Dale Gardiner Dr Gerlinde Mandersloot 10 th June 2013.
RbD Subgroup Dean Johnson 8 th April 2008 RbD Subgroup Dean Johnson 8 th April 2008.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011.
Draft for discussion1 Daily Outlook Gas Day : Wednesday, 15/01/06 Todays Opening Linepack296mcm Predicted Closing Linepack (PCLP1)293mcm Change in Linepack-3mcm.
NEA – Who we are…. National Fuel Poverty Charity Established 25 years ago Funding streams Activities –Campaigning & Lobbying –Training & development –Research.
EMC Strategic Housing Update March An update on the work of EMC’s Affordable Housing Task and Finish Group Maximising opportunities for delivery.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Information in this presentation is subject to change Next generation services - Broadband & voice progress - March % UK coverage 549 Next generation.
DN Interruption 2008 – Annual Results and Indicative ad-hoc Invitation Interruptible Capacity Requirements Steve Edwards & Simon Trivella – 19 th August.
Freshman: Applications submitted by December 3, 2012, will receive notification by January 18, Freshman: Applications submitted by February 4, 2013,
DN Interruption Reform (UNC Mod 90) Liz Spierling Commercial Manager, Transportation.
Introduction to ALIS Grades and to the Expectations of Universities.
California Energy Commission California Energy Demand Revised Electricity Forecast: Southern California Edison Planning Area December 17, 2015.
Region At Least One Account Yorkshire & Humber15 / 15 West Midlands14 / 14 East Midlands8 / 9 North East7 / 12 North West20 / 23 East of England11 /
Shelagh Grant, Chief Executive, The Housing Forum 12 th November T HE A FFORDABLE H OUSING G ROUP “T HE H OUSING F ORUM R OUND -U.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
HS2 in the East Midlands Stephen McFarlane HS2 Ltd Greater Nottingham Transport Partnership Forum 24th February 2016.
Презентацию подготовила Хайруллина Ч.А. Муслюмовская гимназия Подготовка к части С ЕГЭ.
National Schools Commissioner Roadshow
Unlocking a low carbon gas future
Background Current balance of LDZ System and Customer charges
(% of time spent in lectures, seminars and similar)
Institutional Strategic Objectives Performance
King's Lynn and West Norfolk 6%
2008 DN Interruption Tender
Simon Trivella – 26th April 2010 Gas Customer Forum, ENA
DN Interruption Reform Transmission Workstream
FE policy landscape – an update
The Proposals Change the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible supply.
WWU Interruption Update
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Tony Pearson, Network Planning Manager
Mark Freeman 29th January 2007
DN Interruption Reform
Simon Trivella – 27th March 2009 Gas Customer Forum, Elexon
DN Interruption Ad-hoc Tender 2008
Institutional Strategic Objectives Performance
Pricing and Margins Manager National Grid Distribution
Question 1. Question 1 What is 10 x 40? A 40 B 400 C 4000 D 4.0.
Great Eastern Mainline
Presentation transcript:

DN Interruption Reform Gas Customer Forum Mark Freeman 10 March 2008

DN Interruption Reform National Grid Shipper/Consumer Seminars  December 2007 Roadshows  LancasterDec 4 th  DoncasterDec 5 th  LeicesterDec 7 th  LiverpoolDec 10 th  ManchesterDec 11 th  February 2008 seminars  NottinghamFeb 19 th  ManchesterFeb 21 st

Interruption Requirements Locational East Anglia LDZInterruption Zone PostcodesInterruptible Allowance (days) Interruptible Capacity Estimate (GWh) MinMax EAStowmarketIP6, IP8, IP14, IP

NG Interruption Zones & Interruption Requirements 2011/12 - East Anglia (indicative) Interruption Requirements Interruption Zone No. of Days Peak Day GWh/Day EA A Total0.69GWh/Day Present interruption24 GWh/day Peak Day Total Network Demand412GWh/Day Peterborough Norwich Chelmsford Ipswich Cambridge Luton A

Interruption Requirements Locational East Midlands LDZInterruption Zone PostcodesInterruptible Allowance (days) Interruptible Capacity Estimate (GWh) MinMax EMDigbyLN EMBurtonDE12, DE13, DE14, DE EMCoalvilleLE EMClay CrossS45, DE EMWorksopS80, S EMDoncasterDN4, DN EMBarnby DunnDN1-3, DN7, DN EMBarnsleyS70-S EMScunthorpeDN

NG Interruption Zones & Interruption Requirements 2011/12 - East Midlands (indicative) Northampton Leicester Nottingham Rotherham Lincoln Boston Skegness A B C D E F G H I Interruption Requirements Interruption Zone No. of Days Peak Day GWh/Day EM A EM B EM C EM D200.2 EM E EM F EM G EM H EM I Total6.11GWh/Day Present interruption48 GWh/day Peak Day Total Network Demand543 GWh/Day

Interruption Requirements Locational North West LDZInterruption Zone PostcodesInterruptible Allowance (days) Interruptible Capacity Est. (GWh) MinMax NWEarbyBB18, BB9, BB8, BD NWAccringtonBB NWNorth lakesLA8-9, LA NWStalybridgeOL NWAppleby BridgeWN NWKnutsfordWA NWHall GreenSK9, SK NWRamsbottomBL0, BL8, BL NWWinsfordCW7, CW9, CW NWBramhallSK

NG Interruption Zones & Interruption Requirements 2011/12 - North West (indicative) Barrow in Furness Blackpool Liverpool Manchester Crewe Bolton Lancaster A B C D E F G H I J Max. Interruption Requirements Interruption Zone No. of Days Peak Day GWh/Day NW A NW B NW C NW D NW E NW F NW G NW H NW I NW J Total4.12 GWh/Day Present interruption44 GWh/day Peak Day Total Network Demand597 GWh/Day

Interruption Requirements (LTS) - Indicative LDZInterruption Zone PostcodesInterruptible Allowance (days) Interruptible Capacity Est. (GWh/d) MinMax EAFakenhamNR21, NR EMHooton RobertsDN4, DN12, S63, S EMGranthamNG EMSheringtonMK16, NN1, NN4, NN5, NN6, NN7, LE EMThrapstonNN3, NN5, NN6, NN8, NN9, NN14, NN NWBarrowLA12, LA14, LA NWBarrowfordBB1-3, BB5-12, BB NWWinsfordCW7-10, M5, M14, M19, M22- 24, M31, M34, M41, M NWNew MillsSK1, SK4-8, SK12-14, SK16, SK

EA NG LTS Interruption Zones & Interruption Requirements 2011/12 – East Anglia (indicative) Interruption Requirements Interruption Zone No. of Days Peak Day GWh/Day EA200.4 Total 0.4 GWh/Day Chelmsford Luton Cambridge Peterborough Ipswich Norwich

EM A B C Interruption Requirements Interruption Zone No. of Days Peak Day GWh/Day EM A EM B EM C101.0 EM D101.7 Total 3.59 GWh/Day D NG LTS Interruption Zones & Interruption Requirements 2011/12 – East Midlands (indicative) Northampton Leicester Nottingham Boston Lincoln Skegness Rotherham

A B C D Barrow in Furness Blackpool Liverpool Manchester Crewe Lancaster Bolton Interruption Requirements Interruption Zone No. of Days Peak Day GWh/Day NW A104.0 NW B NW C100.3 NW D202.5 Total7.27 GWh/Day NG LTS Interruption Zones & Interruption Requirements 2011/12 - North West (indicative)

East Anglia Actual Interruption - Days locational by postcode

East Midlands Actual Interruption - Days locational by postcode

North West Actual Interruption - Days locational by postcode

Actual Interruption days by LDZ Volume by postcode

Actual Interruption days by LDZ