Model 296ES 1. Disassembly To replace the spring, or clean any of the internal components of the valve, proceed in the following manner: DISASSEMBLY AND.

Slides:



Advertisements
Similar presentations
RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
Advertisements

RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
Waukesha Cherry-Burrell
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
Model 695AV 1. Dissasembly To replace the spring, or clean any of the internal components of the valve, proceed in the following manner: A.Cut the seal.
RPDA 4A 2½” – 6”. Modification Overview  Production of the RPDA 4A series began in  The RPDA 4A can utilize either a Type I or Type II bypass.
Blackwood Fire Company Stihl Chainsaw Maintenance.
Head jig usage procedure RKC London Office. Set the head jig 2) Put two screws with loose condition 3) Lock the plate 4) Tighten two head jig screws 5)
Model 495/496 EP Full lift safety valve with spring loading (AIT) model 495/496 - EP. 1. Disassembly and assembly. 1.1 Disassembly. To replace the spring,
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Model DISASSEMBLY AND ASSEMBLY 1- Disassembly To replace the spring (11), or clean any of the internal components of the valve, proceed in the.
Model 995 EP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner:
Model 895 AP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner:
Model 495/496 AP and CP Full lift safety valve with spring loading (AIT) model 495/496 - AP and CP. 1. Disassembly and assembly. 1.1 Disassembly. To replace.
CHAPTER 33 Drum Brake Systems.
March 19, ” Leg Valve Changeout. Required Tools and Materials 3” Wrench 9/16” Wrench 11/16 Wrench Seal Pick Clean hydraulic fluid.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
825Y(YA) 3/4”-2”. Modification Overview  Production of the 825Y began in 1978 and is current.  The 825YR ( ) had replaceable check seats. **
Compressor Replacement – ODU
806, 806YD 3”-10”. Modification Overview  806- ( ) Cast Iron body- Threaded in seats- Internal check parts are epoxy coated iron.  806YD- (1988-present)
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
XR5919 Steering Relief Valve Adjustment. Step1 Remove center cover Steering Priority Valve Test Port.
Model 466_666 Thorough and regular cleaning, in accordance with the working conditions, is recommended. The gauges are fitted with two bleed cap that.
Additional Hand Tools Harding High School Mr. Pottkotter & Mr. Robinson.
774X DCDA 21/2”, 6”, 8” 774X DCDA 21/2”, 6”, 8”. Modification Overview  Production began in  The 2 ½” 774X DCDA was discontinued in  The.
”-10”.
½”-10”.
826YD 21/2”-10”.
720A ½”-2”.
774X 21/2”, 6”, 8”.
RPDA 4AN 21/2” – 6”.
2000SS 2½”-12”.
Disassembly and Assembly of A07A-W1/W2 Electronic Governor Actuator for AD Fuel Injection Pump
805Y, 805YD 21/2”-10”.
¾”-2”.
Valve Manifold Assembly/Disassembly
3000CIV 21/2”-10”.
½”-10”.
806, 806YD 3”-10”.
¾”-2”.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
Delphi Fuel pump. Overshoot protection screw. No load throttle adjust
DC4A (LF) ½”-2”.
909 3/4”-2”.
850 2½”-10”.
4D-100, 4D-600 2½”- 10”.
LF856 2½”-10”.
950, 950XL, 950XLT ¾”-2”.
909 21/2”-10”.
2000SS 2½”-12”.
DC4A 21/2” – 6”.
880V 21/2”-10”.
709DCDA 2½ ”-10”.
975 2½”-10”.
774 2½”-12”.
3000SE 21/2”, 6”, 8”.
Target Position Guide Plate Target Ladder Rod Adjustment Screws
2000CIV 2½ ”-10”.
4000CIV 21/2”-10”.
919 ¾”-2”.
856 2½”-10”.
909 RPDA 21/2”-10”.
709 2½ ”-10”.
Presentation transcript:

Model 296ES 1. Disassembly To replace the spring, or clean any of the internal components of the valve, proceed in the following manner: DISASSEMBLY AND ASSEMBLY A.Unscrew the cap and remove B.Holding the rod steady, loosen the hollow screw nut, until the constructive limit, and the follow screw until you note a releasing of the spring C.Unscrew the bell holding the rod and the body steady D.Lift the bell and you will have access to all the components

Model 296ES 2. Assembly A.Enter the bell and the joint through the upper part the rod B.Turn the bell holding the rod and the body steady C.Replace the hollow screw with the hollow screw nut D.Adjust the set pressure with the hollow screw and fix the adjustment position with the hollow screw E.Change the washer and lightly tighten the cap DISASSEMBLY AND ASSEMBLY

Model 296ES ADJUSTEMENT OF THE BLOWDOWN A.Slack the stud B.Twist or untwist the deflector according the difference in the wished locking pressure (Blowdown) C.Fix the deflector position screwing the stud