Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.

Slides:



Advertisements
Similar presentations
DIS 2008, London Transverse Spin Physics at PHENIX Douglas Fields (University of New Mexico) For the PHENIX Collaboration 4/9/20081 Douglas Fields for.
Advertisements

Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
PHENIX local RUN9 RHIC meeting Manabu Togawa for the PHENIX 1.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
RHIC/AGS User’s Meeting PHENIX Run-15 Goals and Status Douglas Fields University of New Mexico For the PHENIX Collaboration.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX Run12 Spin John Koster RBRC RSC Meeting 2012/05/11.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Performance of PHENIX High Momentum Muon Trigger 1.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
PHENIX Measurement of Parity-Violating Single Spin Asymmetry in W Production in p+p Collisions at 500 GeV Stephen Pate (for the PHENIX Collaboration) New.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Performance of PHENIX High Momentum Muon Trigger.
High Multiplicity Trigger Operation Status RIKEN/RBRC Itaru Nakagawa On behalf of Toru Nagashima, Aaron Key, SeYoung Han, Shoichi Hasegawa 1.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
1 PHENIX Status Ed O’Brien for John Haggerty Brookhaven National Laboratory June 23, 2009.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Performance of PHENIX High Momentum Muon Trigger.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Reduction of Background in Observation of W Decay Using the Forward Vertex (FVTX) detector at PHENIX Abraham Meles New Mexico State University APS April.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
Reduction of background in observation of W – decay using FVTX tracker Abraham Meles New Mexico State University DNP2012 – Newport Beach, CA. Oct 25, 2012.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
PHENIX J/  Measurements at  s = 200A GeV Wei Xie UC. RiverSide For PHENIX Collaboration.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
BUP Discussion Input John Koster, Sasha Bazilevsky, Itaru Nakagawa Spin PWG 2013/04/03 1.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN16 Status Y. Akiba (RIKEN/RBRC) 2016/05/27 Radiation lab meeting.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Y. Akiba (RIKEN/RBRC) Radiation Lab meeting 2016/06/30
Physics event timing Use Pythia to generate hadronic decays at 125 GeV
Presentation transcript:

Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico

Time Meeting 3/17/2015 Recovery from Power Incidence PHENIX came away fairly well from the power glitch. – Our rack room air conditioner died (new motor is being installed today). – We have 4 IR air conditioning units. Two are dead, parts are being ordered/gathered to repair them (need no beam, since they are on berm). – Our rack room UPS system is dead (still dead, but being worked on). All subsystems are running in DAQ. 12/10/2014Douglas Fields 2

Time Meeting 3/17/2015 Out of Gas (Ethane) We now have ~10 days of ethane on hand. A PO has been received for 21 more bottles and a tube trailer (more than enough for the remainder of the run. We are in frequent contact with the vendor to keep track of the status of these orders. 12/10/2014Douglas Fields 3

Time Meeting 3/17/2015 MPCEX update Both MPC-EX N,S running in PHENIX DAQ since 3/17 MIP and double-mip observed in both N/S ADC spectra South shows H/L ratio same as measured in cosmics data – North needs some fine adjustment (underway) Issue with SVX4 dropout – Same positions in chain, so overlapping dead areas (~17%) – Diagnosis underway Examining multibuffered events Online says data is good for physics! Offline analysis underway…

Time Meeting 3/17/2015 PHENIX Efficiency 12/10/2014Douglas Fields 5

Time Meeting 3/17/2015 Goal Run-15 max Luminosity Progress RHIC projections ( gave Run- 12 achieved delivered luminosity as 9.3 pb −1 /week and 22 pb −1 /week max expected in Run-15 (after 5 weeks running). Converting to our recorded luminosity: 4.5 pb −1 /week and 10.1 pb −1 /week (for the |z| < 40cm program) and 1.6 pb −1 /week and 3.85 pb −1 /week (for the |z| < 10cm program) 12/10/2014Douglas Fields 6 Goal Run-15 max

Time Meeting 3/17/2015 Summary Taking physics data for HF in Muon and Central arms. MPC-EX now taking physics data (with some remaining issues being chased down). New High Multiplicity trigger now in physics mode. Could still reach both physics goals by nominal end of p+p run. 12/10/2014Douglas Fields 7

Time Meeting 3/17/2015 Backup 12/10/2014Douglas Fields 8

Time Meeting 3/17/2015 Meanwhile… J/Psis in Forward Arms 12/10/2014Douglas Fields 9 2D triggers NorthSouth 1D triggers 2D eff.

Time Meeting 3/17/2015 FVTX Multiplicity Trigger 12/10/2014Douglas Fields 10 Slide from Wei Lei, Rice University

Time Meeting 3/17/2015 FVTX Multiplicity Trigger 12/10/2014Douglas Fields 11 Trigger : #track > Threshold ~ 3/4 active wedges Online Coarse Track

Time Meeting 3/17/2015 Trigger performance 12/10/2014Douglas Fields 12 >6 tracks >7 tracks >12 tracks

Time Meeting 3/17/2015 Local Polarimeter Issues 12/10/2014Douglas Fields 13

Time Meeting 3/17/2015 Progress Towards Physics Goals (p+p) Two physics programs: – Forward direct gamma physics with the MPC-EX 200 GeV with transverse polarization for 9 weeks [Physics driven goal is 50 pb −1 recorded within |z| = 60%] – Heavy Flavor physics using the F/VTX 200 GeV with transverse polarization for 9 weeks [Physics driven goal is 21 pb −1 recorded within |z| = 60%] In our BUP, ( &materialId=0&confId=764) we state that we assume PHENIX uptime 70%, fraction of events within +/- 10 cm (25%) and +/- 40 cm (70%). &materialId=0&confId=764 12/10/2014Douglas Fields 14