CMS Week, CERN, 07-11 June 2004 10 June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.

Slides:



Advertisements
Similar presentations
CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
Advertisements

CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
04 Dec 2001CMS Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University and.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
22 Jan 2002Tracker Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Strasbourg status Ring 7 pilot run François Didierjean.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Catania Production Center S.Albergo Universita’ & INFN Catania.
Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
Status Report on Bonding at Catania
Preproduction Status & Results
Hybrid & Module Testing Status
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Module Failures on RODs
FNAL Module Testing Status
Module Production Status in Florence
Module production in Italy
Bari production centre resp. M. de Palma
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
US Hybrid/Module/Rod Testing Model
Module Testing in Florence Carlo Civinini INFN-Florence
Module Testing Status Week of 6/14-6/20.
C 4 Insulator Changeout With Hoists
Production Status 39 modules produced
A. Kaminskiy, CMS Tracker week , Apr 2004
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
C5.21L Three Phase Dead End Insulator Changeout
Cutting in Bells Three Phase
C3 Insulator Changeout With Hoists
A5 Insulator Change Transformer Pole
Hybrid & Module Testing Status
A1 Pole Changeout Energized
Hybrid & Module Testing Status
Installing a single phase tap on an existing C1.11
Università di Catania and INFN – Sezione di Catania
Università di Catania and INFN – Sezione di Catania
FNAL Hybrid Testing Status
Presentation transcript:

CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore Costa Università di Catania and INFN – Sezione di Catania

10 June 2004CMS Week - TPO2 Salvatore Costa - Catania General remarks General remarks: debug –We perceive these centers more as debug places where teams of dedicated people study in deeper detail Modules with non-trivial problems, so that normal production can continue at the usual rate. –Strictly speaking, trivial mechanical Module bonding failures should not be matter for these Centers: a) there is nothing to study; b) bonding centers (operators) are either able to repair them right away or, if they can’t, then most likely the debug centers can’t either. –To repair damage to APV-PA bonds (typically caused by handling accidents), we would like the official procedure to be sending Module back to the Hyb bonding place. –For all other cases, which means a variety of electrical misbehaviors that may or may not be related to bonding problems, report the problem and let the ‘experts’ at the Center decide if they think they want to study that Module [following the report procedure that will be decided here]. Criteria in detail: –Based on type of failure, see next slide  At the Bonding WG Meeting of 08 June 2004 we discussed the criteria to send a Module to the new official Repair Centers, from a Bonder’s point of view.

10 June 2004CMS Week - TPO3 Salvatore Costa - Catania Criteria in detail 1.Trivial bond failure detected during bonding or at post-bonding inspection: –Wire won’t stick –Bond pops up (lift off) –Foot is misplaced and causes a short somewhere  We repair these right away as usual if we can and/or list as unbonded the strips that are such as a result of the failure or of the “repair” action. 2.Trivial (bond) failure detected during post-bonding ARCS or LT tests: –Pinhole (caused by bonding/handling accident or pre-existing and either undetected in Sensor test or on untested Sensor) –Short (caused by bonding/handling accident or by misplaced foot) –Open (bond popped up)  Same action. 3.Non-trivial electric failure detected with ARCS at any (?) stage (pre-bonding, post-bias-pre-readout-bonding, post-bonding or LT tests which dos not exhibit a clear link to bonding: –Increased LV current –Anomalous IV  We post the problem for the debug Center to consider; they ask for the module at their discretion. 4.Non-trivial electric failure detected during post-bonding ARCS or LT tests, which might be traced back to a bonding failure: –Example: “pseudo”-pinhole: At post-bonding ARCS test, a “PHL-” (likely pinhole) is found. We pull the readout bond as prescribed for pinholes but the test keeps saying “PHL-”, so the Hyb ch is damaged. Since it was OK at ARCS test on arrival perhaps we killed it with bonding (seen in some TIB centers).  We post the problem for the debug Center to consider; they ask for the module at their discretion.