Field study in Cesena/Italy 2008 Claudio Venturelli, Dipartimento Sanità pubblica, Ausl Cesena, Italy Christian Engelbrecht, University Regensburg Germany.

Slides:



Advertisements
Similar presentations
Biogents ® Eisenhans ™ protection belt. Over 15 years of fundamental research at the University of Regensburg, Germany has lead to the development of.
Advertisements

DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Managing the risk of vector borne diseases in adaptation measures Luciana Sinisi, Italy Chair Task Force Extreme Weather Events
Thomas P. Breaud, Ph.D. Manager August 5, 2014 Mosquito-borne Disease Threats.
Chubaka Producciones Presenta :.
The Months and The Seasons Prepared by Claudia Doria and Terra Myers.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
APNEE-TU Spain: WP7 DISSEMINATION 4th meeting UPM, Madrid, Spain 3-5 December 2003 Air Pollution Network for Early Warning and online information exchange.
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Aedes albopictus in Bermuda: seasonality, spatial correlates and density dependence David Kendell 1, Camilo Khatchikian 2, Laran Kaplan 2 and Todd Livdahl.
Chicas, este calendario si es pa' nosotras !!!!!.

January 2013 SundayMondayTuesdayWednesdayThursdayFridaySaturday.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
2003 OZONE DATA SHARING PROJECT UPDATE Air Quality Advisory Committee September 23, 2003.
Calor 2002, march 2002Auguste Besson1 Argon purity measurement of the D0 calorimeter Auguste Besson (ISN - Grenoble) for the D0 collaboration 10.
Alternative Application Technology Daniel L. Kline USDA-ARS, CMAVE Gainesville, FL
EUROPEAN WATER RESEARCH DAY 8 SEPTEMBER 2008 ASSAY: Manual TIME: 60 minutes LOD: 200 cells in 100 ml Kit coli = 0.78 × LOG (cfu E. coli 100 ml -1 ) – 2.5.
Program Overview Dengue Vector Surveillance Training and Website Appreciation Seminar.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN 30 June1 July2345/65/ / / / August2/32/3.
DOST Ovicidal Trap System. DOST develops mosquito trap In response to the marked increase in dengue cases last 2010 DOST launched the Ovicidal Trap System.
© Hamilton Trust Keeping Up Term 3 Week 3 Day 3 Objective Count up to find a difference between four-digit numbers.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
2010 Yellow Sticky Trap Monitoring Program To monitor for variant western corn rootworm population that lays eggs in soybean crop.
REPENTURN July 5, 2015 REPENTURN REPENTURN REPENTURN.
Moisture Flux and Specific Humidity overlaid with Wind vectors (850mb) Moisture Flux Scale Specific Humidity Scale.
Deadline for Requisitions Payment Processing Date
Calculations & Parameters
What does the red line measure? How can you tell?
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Uruguay West Germany Brazil Argentina Brazil July 30, 1930
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Year 2 Autumn Term Week 12 Lesson 1
Life in the Weimar Republic
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
McDonald’s Kalender 2009.
MEADOW LANDS GYMNASTICS SUMMER ROLL TOT CLASSES
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
Specialist Care of the Older Person’s Essentials Course 2017
Customer Care Center Root Cause Analysis
McDonald’s calendar 2007.
Year 2 Autumn Term Week 12 Lesson 1
1 - January - Sun Mon The Wed Thu Fri Sat
Visual English You understand English can eyes ! your with.
Teacher name August phone: Enter text here.
Florida Atlantic University
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
MEADOW LANDS GYMNASTICS SUMMER PRESCHOOL CLASSES
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Tropical cyclones movement
Numbers Time By 張映芬老師.
February 2007 Note: Source:.
MEADOW LANDS GYMNASTICS SUMMER ROLL TOT CLASSES
Calendar Time.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Silver CREST Award Impact Research Study
McDonald’s calendar 2007.
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Mosquitoes Control.
Presentation transcript:

Field study in Cesena/Italy 2008 Claudio Venturelli, Dipartimento Sanità pubblica, Ausl Cesena, Italy Christian Engelbrecht, University Regensburg Germany Martin Geier, Biogents AG, Regensburg Germany Control of Asian Tiger Mosquitoes by the use of Biogents Mosquito Traps

Location: Cesena/Italy, city with people Time: June to October 2008 Study design: Selection of 6 areas in Cesena where Asian Tiger mosquitoes (Aedes albopictus) occur. (Based on ovitrap measurements of the last years)‏ 3 areas are randomly allocated to receive the treatment with traps, the other 3 areas are control areas where no traps are placed. The treatment sector receives 8 traps, placed outdoor, run constantly for 24h, from June to October. The control sector has no traps. Following parameters are measured in all sectors: - Human landing rates (same person, 1h in the afternoon, every 5-7 days)‏ - 2 Ovitraps are placed in a sector, weekly collections

Intervention and control areas Six areas with simlar environmental conditions have been selected -Three intervention areas with placement of traps: red dots -Three control areas without placement of traps: blue dots

Area 1: Treatment with traps 25 m 40m x 45m = 1800sqm M Biogents traps Ovitraps (for monitoring deposited eggs) Position, where human landing rates are measured

Area 2: Treatment with traps 60m x 50m = 3000 sqm 20 m M Biogents traps Ovitraps (for monitoring deposited eggs) Position, where human landing rates are measured

Area 3: Treatment with traps 113m x 55m = 6215 sqm 20 m M M Biogents traps Ovitraps (for monitoring deposited eggs) Position, where human landing rates are measured

Area 4: Control 30 m M Ovitraps (for monitoring deposited eggs) Position, where human landing rates are measured

Area 5: Control 30 m M Ovitraps (for monitoring deposited eggs) Position, where human landing rates are measured

Area 6: Control 30 m M Ovitraps (for monitoring deposited eggs) Position, where human landing rates are measured

May June July August September October Mean human landings per hour With traps No traps Summary of all three areas: Reduction of human landing rates

Summary of all three areas: Reduction of egg production

Areas without traps 67,41612Total number of colleceted eggs in ovitraps 89,381Total human landing counts Reduction in %Areas with traps From 1 August to 30 September Summary