Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)

Slides:



Advertisements
Similar presentations
E906 Gas System 1/7/09 LANL Meeting D. Northacker UIUC.
Advertisements

Amsterdam, April 2,2003P. Colas - Micromegas TPC1 Micromegas TPC: New Results and Prospects New tests in magnetic fieldNew tests in magnetic field FeedbackFeedback.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Beam Position Monitors MICE CM Harbin January, 2009.
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
TRT Leak Repair Anatoli Romaniouk, EC leak tests Side C Side A 2.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
RD51 test SPS/H4: experimental area hazards and operational procedures (preliminary version, to be discussed with Safety Experts) Matteo Alfonsi.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
RD51-WG VI 28/04/2009M. Alfonsi (CERN)1 RD51 common test beam: specifications and installation status Matteo Alfonsi (CERN)
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
NIKHEF B-field monitors Paul Balm November 11 th, 1999.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
WG7 summary 5 th RD51 Collaboration Meeting in Freiburg WG7 summary M. Alfonsi (CERN)
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
VELO-installation meeting CERN, January 17, 2006
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
RD51-WG X June test beam experience: useful information for October
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
Nikhef/Bonn LepCol meeting
Test beam setup: status report 10/02/2009
Polarized 3He target installation
Presentation transcript:

Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)

31/03/2009M. Alfonsi - CERN2 Outline Schedule Installation of gas pipes Gas system Global setup & mechanics Magnet issues

31/03/2009M. Alfonsi - CERN3 Schedule updated to v2.0

31/03/2009M. Alfonsi - CERN4 Goliath magnet Gas pipes installed! To be done: - gas panel in the experimental area - leak test with He Gas panel must include also retention buckets for flammable gas sensors. Is ok to use quick connectors? sensor

31/03/2009M. Alfonsi - CERN5 Cost of the five gas lines 6mm diam. pipes x 240m 10mm diam. pipes x 240m Mechanical supports Estimated cleaning cost Estimated manpower cost TOTAL CHF CHF CHF CHF CHF CHF Paid by: Saclay (345 CHF) + CERN Left-over material: 30m pipes per type, some support

31/03/2009M. Alfonsi - CERN6 Gas mixing racks We can connect to the main distribution: –Ar, CO 2, N 2, He, ethane, isobutan –CH 4 temporary on “melange” line –We pay the bill at the end!!! Gas mixing racks: –5 gas system  at least 2 gas mixing rack, maybe 3 (the last only for not-flammable mixes) –To put 2 mixing rack in the retention bucket, we are asking for a reorganization of the gas zone, i.e. to move out the not-flammable main distribution rack Main distribution: flammable not-flammable Roof for light flammable gases Retention bucket for heavy flammable gases

31/03/2009M. Alfonsi - CERN7 Gas mixing systems Goal: flexible, upgradable during the several runs, possibility to mix main distribution as well as premixed bottles At the moment, not enough flowmeters and controllers for all the lines.. We start building setups for June from maindistribution (use left-over 10mm pipes) Only required gases or premixed bottles (use left-over 6mm -OR- flexible ss pipes) Mixing cylinder.. Who can provide some of them? flowmeter Connection to the pipes going towards the experimetal area Gas system per line

31/03/2009M. Alfonsi - CERN8 Lack of flammable gas sensors!!!  In the gas zone, they are provided by the SPS people:  put all the gas racks closer in the same bucket  In the experimetal area, only 2 avalaible.. and 1 is for the gas panel:  Additional sensors could be charged on us  For June seems ok: no flammable gas in MM tracker, isobutan for Frascati setup  For October we want isobutan and methane !!!  Sensors could not work in magnetic field!!! In this case problems also for June!!!

31/03/2009M. Alfonsi - CERN9 Cables list (barrack  area) 1)Fiber lines x10 (from Saclay?) 2)Ethernet lines x5 (from Frascati?) Anyway better to have also: 1)Set of BNC lines (24 from GDD) 2)SHV lines (4 from GDD) HV PS and DAQ is inside the experimental area, so are required:

31/03/2009M. Alfonsi - CERN10 Sketch of the installation Gas panel Setup A electr. rack for setup A Removable cable tray for setup A electr. rack for setup B Removable cable tray for setup B? Setup B DAQ PC

31/03/2009M. Alfonsi - CERN11 Setup “A” outside the magnet Placed upstream Goliath Beam line Beam height ~ 128 cm Useful space 3.3 m Beam monitor Beam element Table with micromegas tracker If Detector Under Test is large, as in June, place it just after the table (together with your support mechanics!!!)

31/03/2009M. Alfonsi - CERN12 Table with micromegas tracker A grid of holes for fixation For flammable gas: –Retention buckets must be added on table and, in case, as a roof –Holes must be blind Lenght 120cm Height 70cm from the floor Can part of the legs be substituted by a concrete block? If yes, how can we fix on it? Width 80cm

31/03/2009M. Alfonsi - CERN13 Setup “B” inside the magnet rail wheel Beam Beam height ~ 128 cm ~ 85 cm Table with grid of holes, same issues (blind holes, retention buckets..) for flammable gases, see previous slide. Dimension to be defined Only 43 cm between beam level and the level of the Goliath coil surface!!! A specific rail system will be designed to recover some space:

31/03/2009M. Alfonsi - CERN14 Additional issues with Setup “B” Rails should extend outside Goliath: –Additional dismontable rails with some mechanical support? Should we dismount also rails every time? Gas alarm sensors in magnetic field How much close to Goliath can the electronics rack “B” be place? –Usually LVDS should be not longer than 5m –The electronics can be sensitive to magnetic field

31/03/2009M. Alfonsi - CERN15 Additional common issues Cables and gas pipes from panels to setups: –additional removable cable trays? –plastic gas pipes for this year, to be upgraded to flexible stainless steel (setup B requires flexible ones) DAQ PC inside the area: –Radiation issue to be checked (especially for pc removed after the use)

31/03/2009M. Alfonsi - CERN16 Magnet Goliath under test today Frascati is working on the field map file Proposed a week, from 4 th to 8 th of May, for all our tests: – delimitation of the range of the fringe field – PMTs test – AoB

31/03/2009M. Alfonsi - CERN17 Conclusions Gas pipes installed. Gas panel and leak test with He still to be done. Gas mixing racks designed Problem for lack of flammable gas sensor Sketch of the global setup under completion Magnet test week proposed