ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
ECAL End Cap Schedule issues Justin Greenhalgh This presentation will be at under EE356.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
ECAL FB Meeting, D Cockerill (RAL)1 Large EE Mechanics update.
Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
CMS SLHC workshop, D.J.A. Cockerill (RAL)1 CMS SLHC Workshop The CMS ECAL Detector at SLHC D Cockerill RAL
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
The CMS Electromagnetic Calorimeter at the LHC
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Dec
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
SLHC Working Group - Nadia Pastrone1 CMS ECAL Detector at SLHC SLHC high radiation environment  consequences on ECAL Bunch crossing period:
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 26March20121.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
University of Wisconsin
Integration and Services RE3/1 and RE4/1
Integration and Services RE3/1 and RE4/1
Chamber Design and Integration RE3/1 and RE4/1
Quick link: cern.ch/cmstb04
4x5 SC array for the test beam in Apr 2007
UK CMS Oversight Committee Mtg
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
PROGRESS on EE VPTs, Dees D Cockerill
Presentation transcript:

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 2 ECAL EE End Cap components BACKPLATE SUPPORT RING SUPERCRYSTALS THIS FACE PATCH PANELS ENVIRONMENTAL SHIELD

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 3 ECAL EE End Cap Build – Layout BACKPLATE SUPPORT RING VFE ELECTRONICS MODERATOR END CAP DEESIDE VIEW ~3.6m

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 4 ECAL End Cap Build - Layers Arrangement at the Rear of the End Cap Backplate Backplate Cooling, fitting of patch panels, FOM Protection plates, HV support End Cap inner Shielding, Front Moderator Protection plates, LV support Mechatronics Support plates Umbilical connection, VFE Mothercards/support frames, LV distribution Mechtronics cooling system, internal flow and return manifolds VFE, LV and FE cards attachment, Inner Moderator Data/trigger fibre boxes plus support Rear Moderator, closure of End Cap

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 5 Backplate Cooling, fitting of patch panels, FOM Backplate cooling All 4 backplates have their associated cooling pipes However these pipes must be fitted to the patch panels and ring flange exit points to the (non existant) blocks for the quick disconnect fittings Design/fabrication of blocks Mario Mounting Jose

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 6 Backplate Cooling, fitting of patch panels, FOM Cooling completion Blocks for quick disconnect fittings mounted on patch panels and ring flanges Pipes cut to suit (use of CERN gases division?) Fit pipes to backplate and to blocks Dismount pipes Apply thermal compound to cooling plates Remount pipes, secure to blocks Leak tests

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 7 Backplate Cooling, fitting of patch panels, FOM Patch panels Have to be redesigned and remade due to the new manifold design for the electronics cooling bars The ‘plane’ of cooling is 20mm lower (nearer to backplate) than before DesignJohn ManufactureMario? FittingJose

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 8 Backplate Cooling, fitting of patch panels, FOM Fibre Optic monitoring The new laser layout has been incorporated by Saclay, new mounting drawings produced Updated locations for the diffusing spheres. Dees are mirrors of each other on an Endcap Additional mounting holes on backplate, according to Dee location in CMS Holes completed for all 4 Dees by Jose

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 9 Backplate Cooling, fitting of patch panels, FOM VPT stability pulser One Patch Panel location per Dee for LED array and associated electronics Must serve 18 L1 diffusers Allocated volume only 4cm x 15cm x 4.5cm DesignRAL/UVa RISK: Is volume enough ??

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 10 EndCap EE All large mechanical pieces are at CERN Dry assembly of env. screen produced in Russia

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 11 EE: VPT production & gluing, Supercrystals EE VPT to crystal gluing 2800 VPTs shipped from UK to CERN All tested upon receipt by Russia - INR Up to 50 EE crystals/VPTs glued each week 110 of current EE crystal stock (~350 xtals) done First “Russian” SC completed in June 2006 built using CRISTAL database

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 12 EE electronics Preliminary results, ~ 3900 e- per channel Cross talk < 0.1% Meets EE requirements SC HV cards 105 pre-production cards completed All R & C components for EE delivered Motherboards 2 prototypes on Dee4 600 cards by end 2006 EE VFE cards RC feedback on MGPA tuned for EE Input diode for VPT spark protection 30 prototypes produced in Feb cards now under test 3130 cards by end July 06 FE cards 80 pre-production cards tested 800 cards produced by Sep 2006

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 13 EE trigger Pseudostrip (5 crystal) allocations EE+ towards I.P Consequent trigger towers (TCC level) EE+ towards I.P

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 14 EE : preparing for the assembly Ensuring correct cabling of the channels Trigger map (H.Heath) LED cabling tester from UVa

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 15 EE data and trigger readout The fibre readout fan-out boxes (two layers) serving the EE DCCs and TCCs in the control room 900 readout fibres to correctly route per Dee

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 16 “Dee4” project “Dee4” First large scale test of integration philosophy 20 SCs mounted on BP Dee4 by end 2006 Trigger mapping at motherboard 10 cooling blocks, main manifold “Dee4” to testbeam in May 2007 EE assembly has started “Dee4” will provide crucial assembly and test beam insights Dee1 assembly from September 2006

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 17 EE Planning Dee 1End Sep 2007 Dee 2End Dec 2007 Dee 3Mid Mar 2008 Dee 4Mid Apr 2008 CMS window for Dee1 end Sep 07 EE+ mid Jan 08 EE- mid Mar 08

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 18 EE planning Crucial to introduce as much parallel assembly and integration as possible Quality control at each crucial step Suggestion to carry out all SC mounting and Dee assembly in bldg 867 This offers many very attractive features - all major activities under one roof - proximity of expert teams - realisation of the EE trigger, from motherboard level to fibre readout level - multiple DAQ test systems, needed for EE QA, available locally - cooling capacity for one entire Dee - LV power Crystal Palace Advance preparation of all large mechanics - Dees into OPAL frames - dry assembly tests of Environmental screens - BP cooling installation - Mounting laser monitoring system

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 19 EE - Conclusions EE assembly has started Much progress with the EE large mechanics, VPTs, SC assembly, electronics, and trigger and data mapping “Dee4” will provide crucial assembly and test beam insights Dee1 assembly from September 2006 We are on the learning curve for EE assembly

ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 20 Additional info follows, next slide