 Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University.

Slides:



Advertisements
Similar presentations
CON 4003 Construction Estimating Prof R. V. Locurcio.
Advertisements

© red ©
 Given: No information  Find: The Number of basketballs required to fill this classroom.
Unit 204: Common plumbing processes
APOLLON TEAM Color and color combination. Rationale and core concepts Teach: Color combination Range of colors (spectrum) Reflection Use colored geometric.
 Familiarization of system  Locations of: Hydrants FDC Knox Box FACP Sprinkler Riser Room Liquid Oxygen  Unique Fire Protection Element Smoke Curtain.
Technical boclair academy Building Drawings.
-FOCAL POINT -TRAFFIC PATTERN -ARRANGING FURNITURE Floor Plan & Furniture Arrangement.
FLOOR PLANS APPLICATIONS OF TECHNOLOGY. WHAT IS A FLOOR PLAN?  A floor plan is drawing of a building with the roof removed as seen from above.  The.
Elements of Art. Line – the path of a point moving through space Thick & Thin Organic Geometric SmoothCurved Continuous Broken.
HEAT EXCHANGER.
Air Conditioning Heating Refrigeration
Graphic Communication
The Smarthome in Europe Belgium: Engelen Mathias, Profeta Alessio, Verbiest Sam HEATING AND AIRCO.
Developing Mathematical Ideas Deborah Schifter Virginia Bastable Susan Jo Russell.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
STAIRCASE RESTRICTIONS
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
Objective 7.07: EXECUTE scaled drawings. Beginning on page 159 in Housing Decisions, define these terms.  Architectural drawings  Prints  Plan view.
Opening the doors of learning. For more fun games, go to Instructions: Press the correct platforms.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
1 July 13, 2011 Some morning photos Tank Valve Box.
Exercise Lecture 7 Completing Exercise - Lecture 6 1.Create Your Own Blocks 2.Insert Blocks to Your New Drawing 3.Using Different Hatching Types.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Pipe and station integration ALEX BITADZE CERN- European Organization for Nuclear Research ATLAS Experiment
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
COZYEON Residence Main facilities gallery. Corridor of each floor.
SIZE - Top SERVER ROOM Designed by – openbox |
Kirill Egorov Indiana University 20 October, th Thermosyphon Workshop 3D-modelling for hydraulic assembly Preliminary design of the TS “Balcony unit”
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
جمهوريـة العـراق وزارة التعليم العالي والبحث العلمي الجامعة التكنلوجية قسم الهندسة الميكانيكية التجميد او التبريد او التثليج Refrigeration عنوان المحاضرة.
You have 10 seconds to name…
Symbols and Room Finishes
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
WSHP Systems 1.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Design star project Created by Maria Perez & Melanie Gonzalez
“kicking on to the finish”
You will work in groups of 3
Prezentacii.com Welcome to the lesson.
Computing room PC farm UPS.
Interior Design Floor Plans And Elevations.
Curriculum for Excellence
Platform for moving and positioning Model test in small scale
Intro Classes : 8/21 NEW SEATS .
Cooling technology Main components and equipments
Design star project Created by Maria Perez & Melanie Gonzalez
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
Compound VCRS.
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
USA-15 Compressor displacement for maintenance
DO’s and DON’Ts of toilet construction
Tips for Creating Graphs
TRD GAS SYSTEM PRR Gas System Integration Gas building
M3 Zoned  Enterprise Zone Benefits  Located in Federal Hub Zone
Average Number of Photons
Building Drawings.
Architect’s Scale 1/4” = 1’-0”
Location Plans & Site Plans
Second Meeting of the Material Budget & Engineering Working Group
Cafeteria Entrance to media center
DO’s and DON’Ts of toilet construction
Cafeteria exit exit Entrance to media lobby 12
What Color is it?.
DO’s and DON’Ts of toilet construction
Around the room Orders of operations.
The Heat Pump-pumps heat from a cold area to a warmer area.
Colours Дополнительный иллюстративный материал
Presentation transcript:

 Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University of Technology

Platform on the roof of 3184 building

Dimensions of the platform

Dimensions of the platform with tank and condenser (made from 2D drawings)

Pipe integration

Location of the valves

Two pipes:  Yellow pipe – DN 200, vapour pipe from Manifold to Balcony Unit  Orange pipe – DN 50, liquid pipe from Balcony Unit to Manifold

Dimensions and path of the Yellow pipe

There is no space between existing pipes and the dark blue unit, but there is a gap between floors

Dimensions and path of the Orange pipe

View from inside

View from inside – compressor room – over the entrance door

View from inside – compressor room

View from inside – manifold

Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University of Technology