Roof integration USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University of Technology
Platform on the roof of 3184 building
Dimensions of the platform
Dimensions of the platform with tank and condenser (made from 2D drawings)
Pipe integration
Location of the valves
Two pipes: Yellow pipe – DN 200, vapour pipe from Manifold to Balcony Unit Orange pipe – DN 50, liquid pipe from Balcony Unit to Manifold
Dimensions and path of the Yellow pipe
There is no space between existing pipes and the dark blue unit, but there is a gap between floors
Dimensions and path of the Orange pipe
View from inside
View from inside – compressor room – over the entrance door
View from inside – compressor room
View from inside – manifold