1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for 2015 11 March 2015.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
  Florence, June 28 th 2007 – RD07   – 
Ionization. Measuring Ions A beam of charged particles will ionize gas. –Particle energy E –Chamber area A An applied field will cause ions and electrons.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
Slide 1 Diamonds in Flash Steve Schnetzer Rd42 Collaboration Meeting May 14.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
GEM Development in India, test beam analysis and plan for next test beam Anand Kumar Dubey for VECC group, Kolkata.
Silicon pad detector for an electromagnetic calorimeter at future linear collider experiments: characterisation and test beam results Antonio Bulgheroni.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Xiaodong Wang ( 王晓冬 ) School of Nuclear Science and Technology Lanzhou University, Lanzhou, China MPGD activities at Lanzhou University July 5, 2013.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
High Energy Beam Test and Simulation of Silicon-Tungsten Calorimeter Test Module Shinwoo Nam (Ewha Womans University) On behalf of Ewha Womans University:
CERN Beam Test of Silicon-Tungsten Calorimeter Test Module Shinwoo Nam (Ewha Womans University) On behalf of Ewha Womans University: S.J. Baek, H.J. Hyun,
India in ALICE at CERN - Study of Quark Gluon Plasma - A journey to the beginning of Universe April 27, 2013 IIT - Bombay.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Detector development and physics studies in high energy physics experiments Shashikant Dugad Department of High Energy Physics Review, 3-9 Jan 2008.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
GEM detector development at VECC Anand Dubey. 2-GEM detector tested with source symmetric mode of biasing scheme, (i.e. same voltage across both the GEMS)
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
Upgrade of the CMS hadron outer calorimeter with SiPM’s
Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.
The Electromagnetic Calorimeter – 2005 Operation J. Sowinski for the Collaboration and the Builders Indiana Univ. Michigan State Univ. ANL MIT BNL Penn.
JRA-1 ISRSI Consortium Meeting Perugia, INAF/IASF (BO,PA)
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Rutherford Appleton Laboratory Particle Physics Department G. Villani CALICE MAPS Siena October th Topical Seminar on Innovative Particle and.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
R & D with GEMs and THGEMs at VECC, Kolkata Anand Kumar Dubey ( for the VECC Group )
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
A Prototype Diamond Detector for the Compton Polarimeter in Jefferson lab, Hall C Medium Energy Physics Group Amrendra.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
Front-End electronics for Future Linear Collider W-Si calorimeter physics prototype B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
A novel two-dimensional microstrip sensor for charge division readout D. Bassignana, M. Lozano, G. Pellegrini CNM-IMB (CSIC) M. Fernández, R. Jaramillo,
A novel two-dimensional microstrip sensor with charge division readout M. Fernández, R. Jaramillo, F.J. Muñoz, I. Vila IFCA (CSIC-UC) D. Bassignana, M.
Elena Rocco Nikhef, The Netherlands On behalf of the ALICE Utrecht-Nikhef group Jamboree – Utrecht December 2012.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
A Forward Calorimeter (FoCal) as upgrade for the ALICE experiment at CERN S. Muhuri a, M. Reicher b and T. Tsuji c a Variable Energy Cyclotron Centre,
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
Analysis of LumiCal data from the 2010 testbeam
Silicon microstrip detector for imaging of fast processes at high intensity synchrotron radiation beam. Budker INP V.Aulchenko1,2, L.Shekhtman1,2, B.Tolochko3,2,
FCAL R&D towards a prototype of very compact calorimeter
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Some proposals on HV circuits realization for segmented straw detector
F.Guber, A.Ivashkin INR, Moscow
Production and test of the LHCf microstrip silicon system
Development of thin GEM readout structures
CBM-MUCH-RPC Electronics
Presentation transcript:

1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for March 2015

Test and Characterization of a Prototype Silicon-Tungsten Electromagnetic Calorimeter VECC, Kolkata :: Sanjib Muhuri, Shuaib Ahmed Khan, Tapan K. Nayak, Rama Narayana Singaraju, Satyajit Jena BARC, Mumbai :: Sourav Mukhopadhay, Vinay B. Chandratre, Maneka Sukhwani and BEL, Bangalore Published in “Nuclear Instruments and Methods in Physics Research A 764(2014)24–29.

Silicon Pad 5x5 Arrays Each pad: 1cm 2 Laboratory set up: Layout of a 5*5 array of 1cm*1cm Silicon Detector 28 October 2014Sanjib Muhuri, IWAD 2014, VECC 3

Laboratory set up and results 28 October 2014Sanjib Muhuri, IWAD 2014, VECC 4 PMT1 PMT 2 Source- Sr90 Very thin scintillator to get 2 fold triggers Arrangement for the laboratory experiment

Development of the mini prototype Test Beam set up: Arrangement at T10 28 October 2014Sanjib Muhuri, IWAD 2014, VECC 5

Results From Test Beam Experiment: 28 October 2014Sanjib Muhuri, IWAD 2014, VECC 6 Responses from am minimum ionizing particle

Responses from electron ADC 28 October 2014Sanjib Muhuri, IWAD 2014, VECC 7

Actual Signal pions & electrons 4 GeV pions electrons Satisfactory Signal to noise separation 28 October 2014Sanjib Muhuri, IWAD 2014, VECC 8

Longitudinal Shower Profile Reconstruction 28 October 2014Sanjib Muhuri, IWAD 2014, VECC 9

To check The Linearity of the detector… 28 October 2014Sanjib Muhuri, IWAD 2014, VECC 10 Shows good linear behavior with respect to the simulation

36 element Silicon Pad detector 1 sq cm silicon pads in 6×6 array.320 microns. common n. Bias applied negative to p type pads. Signals from p type pads through capacitors. Bonding diagram for pads.

Detector assembled on the PCB Bias resistors and coupling capacitors 40 pin connector for signals Wire bonds from pads Guard ring position one corner Before wrapping in a black sheet and Al foil Guard rings left floating

PMT1 PMT2 Detector FEE Board Translator Board Testing 2 fold from PMTs is trigger to DAQ. Same backplane PCB made for 25 elements. MANAS/ANUSANSKAR readout X ? X X X 7 ? ? Numbers inside the squares are DAQ channels. 4 channels left out(marked as X), since we can only read channels bad on FEE board. Fig needs minor corrections. Test SetupMapping of Pads to DAQ Channels for one position Backplane PCB

RMS study with Bias  4 detector pcbs can be connected to one backplane PCB. Read by 2 FEE boards.  2 detector PCBs are read by one FEE(64 channels).  Connected only detector PCB to backplane PCB.  So only 32 channels (0 to 31) show higher RMS compared to other 32(32 to 63)  RMs is high at bias 0v and decreases with increasing bias voltage. Stabilizes >45V.  Few times rms has gone bad for some channels. Mean adc values have gone down to zero. See next

On Pedestal Study-1 Mean ADC values for some channels have gone down- channels above colored circles. Suspect humidity- The silicon gels have gone pale.

0n Pedestal Study-2 Mean ADC values for all channels have normal values. None close to zero Kept the detector inside desiccators with new silicon gels over night. Humidity in the lab also more due to rains..

First signals

Status and plans for the test beam (PS and SPS) A new PCB for Silicon pad detectors is being made Pad detectors to be mounted on the PCB Prepare the readout with MANAS and ANU chips Prepare the tower Present tower design is 4 Si-pad detectors in each plane Tests can be done with single Si-pad detector in each plane or with 4 Si-pad detectors in each plane We have 25 tungsten plates (10 cm x 10 cm) We can organize properly to gain maximum information during the tests Provision for inserting MAPS detector in between ….

Arrangement for the Test Beam – Oct Pad detectors: each 6x6 array Each pad: 1cm x 1cm 4 tungsten plates: each 10cm x 10 cm