Progress report Collaboration meeting 23-SEP-2009

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
André Augustinus 16 June 2003 DCS Workshop Safety.
Status Report TOTEM collaboration meetings 24-MAY-2010
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
STTC 20/08/2002 Eva Sánchez-Corral 1 ST Division W2000 Migration status report Organisation and Management Strategy and Planning Review of experience Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Status of the Roman Pot Movement System and the Interlocks Mario Deile
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michel) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin SW.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
1 Responsibilities & Planning DCS WS L.Jirdén.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
LHC Collimators Low Level Control Commissioning Status A Masi, LHC Collimators Low Level Control Commissioning Status LHC Collimators Low Level Control.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Clara Gaspar, July 2005 RTTC Control System Status and Plans.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
TOTEM Roman Pots MPP Meeting 19/06/2015 MPP Meeting 19/06/ Sylvain Ravat1.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
TOTEM DCS Report Collaboration Meeting 27-SEP-2006
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
External Data and DIP Oliver Holme 18 th January 2008.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Preparation & Commissioning of TOTEM for the Run-II of LHC S.Giani on behalf of the TOTEM Collaboration.
Injectors BLM system: PS Ring installation at EYETS
ACS news Circulator TCU: control tests in progress All cavity racks
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Progress report Collaboration meeting 23-SEP-2009

PROGRESS: motors control STATUS SW interface finalized and agreed between CCC, Totem DCS, FESA server and LabVIEW/PXI. All Use Cases and associated requirements implemented and tested in lab setup (bld. 187) Fixing of issues identified during integration tests on lab setup ongoing weeks 38 and 39. NEXT STEPS Deployment at point 5 of release candidate sw. (FESA server + LabVIEW/PXI SW) week 39. Commissioning checklist (besides Use Cases scenario) to be prepared by TOTEM team. Motorization sw. commissioning starting week 40. Deadline for completion: mid-October.

PROGRESS: HW, TOTEM General and tools Production PCs memory upgrade 1G  4G Automatic generation of HW tree to monitor the HW Rewritten FSM tree explorer: JCOP component has too many bugs Piotr’s tool to check the DCS HW status RP Si detectors Updated HW overview diagram: add pump RADMON integration (HW and SW) New subpanels for motors and RADMON

FSM tree explorer

DCS HW status panel

RP Si det pump

ELMB boxes RP boxes ready: tested in 555 installed and tested in IP5 T2 boxes ready tested in 555 T1 boxes designed

PROGRESS: T1 requirements collected by Janos (~40%) names and PBS pinout table : HV and LV need confirmation, no sensors yet summary table T2 HV and LV components integrated in IP5 and used for commissioning next: sensor integration (problems with pinout table) custom panels

3 months ago today

TOTEM DCS status --> referees BigBrother is operational in IP5 RP Si: extensive functionality with some custom panels T2: basic functionality with JCOP panels only T1: on the way interface with RP motor control tested in the lab fully CMS compatible with archiving is being used for commissioning of RP Si and T2 ongoing development according to the plan ?

MP 16 SEP months -6 months

user feedback

TEAM news TOTEM General and RP Fernando LUCAS RODRIGUEZ now a user; fellowship committee in November Ivan ATANASSOV confirmed for 2010 Federico RAVOTTI (20%) fellow until Feb 2010 (extension?) T2 Sami STOECKELL (6m) left in July; waiting for replacement T1 Janos SZIKLAI (50%) works from Budapest Technical support Antoine THYS (a fraction of 20%) confirmed for 2010 Coordination Paolo PALAZZI (50%) retires in February 2010

TEAM situation the current workforce is inadequate in 2010 it may get much worse this is a critical situation

TOTEM CR BigBrother screens

TOTEM Control Room TOTEM-only control area guests of CMS in a room of a barrack at IP5 Furniture, lights, telephone OK (well, almost..) Network to be extended A/C needs fixing Separate access group being defined installation is a few weeks late small fixes need considerable time I had an accident and have been away

TOTEM Control Room Tempo layout from the entrance door, clockwise: interlock panel DSS: 1 PC 1 screen CCC, beam etc: 1 PC 1 screen DCS: 2 PCs 6 screens, in the left corner DAQ: 3 PCs 3 screens, in the right corner RPs: 1 PC 1 screen, 1 desk facing the rack room T1: 1 PC 1 screen, 1 desk on the right from the entrance door T2: 1 PC 1 screen, 1 desk on the right from the entrance door Equipment : available now: 5 PCs, 8 screens on order: 2 PCs, 3 screens being considered: 1 or 2 large status screens, … >>> Meeting of the relevant people this Thu or FRI

?

THE END