Guidelines Revisions Defining What RTF Means by “Savings” December 17, 2013 1.

Slides:



Advertisements
Similar presentations
Modeling Multifamily Heating Energy Use Can SEEM be used, or do we need to use a multi- zone model? Regional Technical Forum January 17, 2011.
Advertisements

Sunset Date Extension: Manufactured Homes HVAC Measures Regional Technical Forum November 18 th, 2014.
E3 Calculator Revisions 2013 v1c4 Brian Horii June 22, 2012.
Time-of-Use and Critical Peak Pricing
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
New Construction Calibration Research Results and Request for Decision Regional Technical Forum March 18, 2014.
Direction on Guidelines Savings Definition Path Results of straw vote and proposed decisions for elements of the savings definition Regional Technical.
The Demand Forecast and Conservation Analysis Interface May PNREC Massoud Jourabchi & Tom Eckman.
Scientific Irrigation Scheduling RTF Staff/CAT Discussion RTF SIS Subcommittee November 20, 2014.
The Saga Continues: Measure Interactions for Residential HVAC and Wx measures Regional Technical Forum April 23, 2014.
Savings Are What You Define Them To Be: The “Baseline” Issue Tom Eckman Manager, Conservation Resources Northwest Power and Conservation Council.
1 Total Resource Cost Effectiveness Test Utility Brown Bag Series by Tom Eckman, NWPCC Ken Keating, BPA October 4, 2006.
Residential Clothes Washers and Dryers Technical Subcommittee Ryan Firestone & Christian Douglass Regional Technical Forum March 10, PM.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
Direction on Guidelines Savings Definition Path: CONTINUED Remaining Useful Life (RUL) and Measure Interaction Regional Technical Forum February 19, 2014.
Capacity Impacts of Energy Efficiency What We Know and What We Don’t Know March 11, 2014.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
Residential Behavior Programs RTF Subcommittee Ryan Firestone September 17, 2015.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum June.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
Regional Technical Forum Future Funding Discussion November 22, 2013 RTF PAC Presentation.
Delivery Verification Jennifer Anziano Regional Technical Forum March 17, 2015.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
QC Follow-up for Single Family SEEM Calibration, HVAC UES Measures, and Weatherization Measures Adam Hadley Regional Technical Forum May 12, 2015.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015.
UES Measure Updates: Refrigerator and Freezer Recycling Adam Hadley Regional Technical Forum June 16, 2015.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Single Family Weatherization and HVAC UES Measures Follow-up from August RTF.
Staff Updates Regional Technical Forum November 19, 2013.
DRAFT Preliminary: BPA Summary of 6 th Plan Supply Curves May 15, 2009 Lauren Gage
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Goodbye, “Last Measure In” Hello, “Option X”? Staff Proposal for how to deal with the last measure in conundrum Regional Technical Forum October 15, 2013.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
Regional Conservation Progress Review of Regional Savings from September 21, 2010.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Evaluation of Wood Smoke Quantification and Attribution RTF PAC October 17, 2014.
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
Implementer’s Group May 2015 Meeting Debrief and Upcoming Meeting Prep May 19, 2015.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat UES Measure Update Regional Technical Forum March 18, 2014.
RTF Residential Lighting Subcommittee Tuesday, March 4, 11am – 12:30pm 1.
BPA Impact Evaluation Policies QSSI. 2 Drivers: Industry Best practice, Power Act, RTF Guidelines, confidence savings.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum December.
RTF Management Update Jennifer Anziano Regional Technical Forum August 18, 2015.
Residential Refrigerator UES Measure Update Regional Technical Forum April 16, 2013.
1 Summary of Reviews: Workpapers Approved by the California Technical Forum Part 2 Meeting: California Technical Forum January 28, 2016 Jeff Hirsch/Kevin.
Discussion of RTF Wood Smoke Analysis Recommendations RTF PAC November 24,
Guidelines Overview Michael Baker January 20, 2016.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Exterior LED Area Lights
Continued: DHP for New Construction Current Practice Baseline Regional Technical Forum Adam Hadley February 17, 2016.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Progress Toward the Sixth Plan’s Regional Conservation Goals 2014 Achievements November
RTF’s Engagement with Research Jennifer Light RTF Policy Advisory Committee February 19, 2016.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat UES Measure Update Regional Technical Forum June 17, 2014.
Presentation transcript:

Guidelines Revisions Defining What RTF Means by “Savings” December 17,

Treating Energy Efficiency as a Resource Implications for Defining Savings Power Act: – Resources are actual or planned load reduction resulting from a conservation measure”. 1st year might be “actual” or “historical savings” Planned savings might represent savings over the life of the measure – A resource must be “reliable and available within the time it is needed” (i.e., the reliability of EE must be comparable to other resources) Near term need might be satisfied by estimates of “first year” savings Long term need requires estimate of “persistent savings” – The Council (and BPA) are to account for historical experience with similar measures when determining the amount of power that a conservation measure may be expected to save Treatment of EE as resource, requires internal consistency between baseline used in load forecast and baselines used for savings estimates – Note: targets based on current practice are lower than those based on “existing conditions” People are using RTF savings in their cost-effectiveness analyses to make investment decisions – Cost-effectiveness calculations assume savings persist for the life of the measure 2

Process for Reaching Agreement on RTF Savings Definition Focus on UES measures Discuss options for four parts of the definition – Baseline for Current Practice – Remaining Use Life (RUL) – Baseline for Pre-Conditions – Measure interactions After meeting, members vote and explain why – See draft voting template Discuss voting and decide at subsequent meeting 3

Example Measures Current Practice – CFL’s – Clothes washers Pre-Conditions – Weatherization & Heat Pump Conversions – Refrigerator Early Decommissioning 4

Current Practice Baseline – Council’s Plan Council’s Plan: Use Baseline from Council Plan – Based on knowledge at start of Council 20 year forecast of Recent market choices Upcoming codes and standards – RTF baseline would remain constant for five years (until a new Plan). – Pro’s Simple, less updating. Aligns perfectly with Plan baseline. – Con’s For rapidly moving markets, doesn’t give programs feedback on real market. Utilities often need data more frequently (2-year IRP cycle). 5

Current Practice Baseline – Today’s Market Today’s Market: Use recent data on market choices to set a baseline for each measure’s sunset period – Based on direct observations of the current market – beginning of sunset period. – Remains constant for savings sunset period – Pro’s Helps programs adjust to rapidly moving markets. Does not require forecasting. – Con’s Likely to overstate program savings over the sunset period if market changing fast. Savings not comparable to Council baseline – so target tracking requires estimating savings since Council Plan. 6

Current Practice Baseline – Forecasted Market Forecasted Market: Estimate market choices over the sunset period – Savings could be average over sunset period or end-point of period – Sunset period could be one to five years (limit in current guidelines) – Pro’s Helps programs adjust to rapidly moving markets. Attempts to get savings correct over sunset period. – Con’s Requires forecast of baseline conditions over sunset period. Longer sunset period require longer forecasts which are less certain Savings not comparable to Council baseline – so target tracking requires estimating savings since last Council Plan 7

Estimating RUL: Options Assume any measure with a pre-conditions baseline has RUL = EUL. Generally assume RUL=EUL, but allow a case to be made for exceptional measures Use a simple rule (for example RUL is 1/3 of EUL) Use a simple rule but allow exceptions Forecast the average RUL during each sunset period Remove Pre-Condition Baseline from Guidelines – always use current practice, assuming RUL = 0. 8

Pre-Conditions Baseline: Options Today’s Conditions: Data on typical conditions (RBSA, etc.) at the beginning of each measure’s sunset period – Based on direct observations of the market Forecasted Conditions: Estimate of “average” typical conditions over the sunset period – Requires short-term forecasting 9

Measure Interactions Currently the Guidelines say… – “Interaction is significant if the RTF determines that it is likely to account for more than 10% of the measure savings.” Measure identifiers can be used to account for some measure interactions – Example: For an attic insulation measure, measure definition depends on whether there is a heat pump There would be one UES for “with heat pump”, and one UES for “without a heat pump”. – Requires more data to be collected by programs – Should this strategy be recognized by the Guidelines? 10

Measure Interactions – Other Strategies Strategies other than measure identifiers – None. Do what programs will tolerate with measure identifiers – Estimate based on “full package” (LMI, Option 3, etc.) End of sunset period End of EUL End of planning period – Estimate based on program evaluation findings Requires sample data on what measures were present when each measure was installed, and which measures were installed simultaneously Effectively defines the baseline conditions for each measure – Estimate based on general population characteristics Same as above, but data not tied to recent participants. 11