Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.

Slides:



Advertisements
Similar presentations
Mirror and Lens by Rifki Irawan. a surface, such as polished metal or glass coated with a metal film, that reflects light without diffusion and produces.
Advertisements

Engineer Training Media Feeder TJ8300 / TJ8500 Media Feeder.
Chapter 8 Optical fiber splicing Attenuation curve for silica optical fiber.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance 16/05/06.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
End of 2007 SPECTRAP’ is being built in London to trap Ca+ ions with real imaging capabilities Early RF operation expected Jan 2008 Penning operation Feb/Mar.
Telescope Tear-Down Anatomy of a 114mm f/8 Newtonian Reflector.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
MICE Tracker workshop, 06Nov Waveguides for Station5 H. Sakamoto / M. Yoshida.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance; status 18/05/06.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
QA for the Fibre Tracker 28 October 2004Brunel QA for fibre bundling Dr Paul Kyberd and Dr Peter Hobson School of Engineering & Design Brunel University,
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
ADAPT is a Human Resources Community Initiative supported by the European Union through the European Social Fund (ESF) Safety in Optical Fibre Systems.
C F V Light In Side S > 0 Real Object Light Out Side S ’ > 0 Real Image C This Side, R > 0 S < 0 Virtual Object S ’ < 0 Virtual Image C This Side, R
T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers;
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Φ/θ Type Mechanisms operation at different field points without a derotation NGAO Laser Guide Star 7/13/20151Alex Delacroix.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
© Copyright 2015 Rockwell Collins, Inc. All rights reserved. Proprietary Information Waveguide Displays Rob Brown.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
ACT Class Opener: om/coord_1213_f016.htm om/coord_1213_f016.htm
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
Lenses Are classified by their Focal Length. The distance from the optical center of a lens to the front surface of the imaging device.
LASER AND ADVANCES IN METROLOGY
1 NSF Engineering Research Center for Reconfigurable Manufacturing Systems University of Michigan College of Engineering Cylinder Bore Inspection Engineering.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Physics 145 Introduction to Experimental Physics I Instructor: Karine Chesnel Office: N319 ESC Tel: Office hours: on appointment.
MOUNTING PHOTOS FOR STATE FAIR
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
T. Matsushita 1 Waveguide length with 3D model Internal waveguides The shortest = 1.5 m The longest = 2.6 m Others depending on the spacing Front face.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
End Facet Roughness and Coupling Loss Hadi Baghsiahi, Kai Wang, David R. Selviah Photonics Research Group, Department of Electronic & Electrical Engineering.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
 You will receive 1 square piece of paper.  On the back, draw your design using light pencil. Try to visualize how.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
Fabric Arts I Photo Transfer Pillow. Steps 1 & 2 Pin your “A” strips to your “C” strips with face sides together.
Date of download: 5/29/2016 Copyright © 2016 SPIE. All rights reserved. DMD functionality. The light steering action of a single micromirror is illustrated.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
T. Matsushita 1 QA: Fibre Counting Software 1. Take CCD image of comb/connector 2. Cut noise 3. Find bundles: Nearest Neighbour Clustering, merge clusters.
Silver oak college of engineering and technology SUBJECT: MP-1 Prepared By: DHRUV DARPAN DIVYANG URVIL Guide: RAVIRAJ.
Aron Fish Imperial College Mice Video Conference 01/02/06
Fabric Arts I Photo Transfer Pillow.
Scintillating Fiber/Clear Fiber QA and Ribbon Production
Performance of Fibers in IFU
Remember you can revise at home!
How to make Felt Lesson 11.
Understanding the Global Apparel Manufacturing Process 2.02
Presentation transcript:

Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation

T. Matsushita 2 Bundling New comb ready: Comb in use Fibres trimmed on rubber sheet with cutter knife: - align centre fibre on horizontal white line - trim fibres along vertical white line QA image for one connector (# of fibres in a bundle) Cut surface Polished surface

T. Matsushita 3 Connectorisation Bridge ready: Bridge in use Fibre radius guide during connectorisation QA image for one connector (# of fibres in a hole)

T. Matsushita 4 Check sheet – in preparation

T. Matsushita 5 Light source LED survey finished: EG-5UV from ETG Inc. - Peak 405 nm, range nm - 12 mW output now in hand. Optics: - spherical lens for collimation is ready - cylinder lens for focusing is ready - preparing mount for lens - needs mechanical slits

T. Matsushita 6 Mechanical Connector: patch-panel connector for external waveguide revised to have gland URGENT: - go-nogo gauge to be made - station connectors to be made Carbon-fibre station - needs to be machined for connector holes Doublet-layer - want the first doublet-layer as soon as it is ready so that we can start work during manufacturing of the second/third doublet-layers. That’s all!