PECO PRODUCT DESIGN SPECIFICATIONS REPORT PRESENTATION

Slides:



Advertisements
Similar presentations
DESIGN FOR XXX Design Strategies. Design for X Design Strategies 6/1/ Part shape strategies: adhere to specific process design guidelines if part.
Advertisements

Boiler Operation Procedures
Chapter 24 ECONOMIC AND PRODUCT DESIGN CONSIDERATIONS IN MACHINING
Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
Pipe Supports and Hangers
Mate Grinder MATE European Dealer Meeting Advantages of Automatic Controlled Punch and Die Grinding More regrinds, accurate material removal Protect.
PECO Group Internal and External Search Results ME 492 Winter 2008 Students: Jeff Bennet jonathan boschiero Kiehl McIntyre Ryan Ernst Advisor: David Turcic.
WHAT IS MANUFACTURING? Why do we study manufacturing?
10-2 The five most common risk factors responsible for foodborne illness: Purchasing food from unsafe sources Failing to cook food adequately Holding.
Variation Management of Key Characteristics
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
ELECTRONIC LOAD CONTROL METER Installation and Programming.
RYAN ERNST JEFF BENNETT KIEHL MCINTYRE JONATHAN BOSCHIERO FACULTY ADVISOR: DAVID TURCIC CONTACT ENGINEER: DAVID CIFUNI PORTLAND STATE UNIVERSITY ME 493.
Redesign and Packaging of Adirondack Chair Team #58 Project # F07-58ADRNDKCH Team Members Craig Craddock William Fogerson Jason Hick John Mathews Mike.
Installing Windows XP and Windows Installing two different versions of Windows on the same machine. In this example, Windows 2000 and Windows XP.
With over 60 years experience Mondial Forni ensures the highest baking quality and maximum reliability in their ovens. The Ciclomondial combustion gas.
Testing an individual module
FUNDAMENTALS OF METAL FORMING
Catheter Tube Assembly Process
Lola Redesign Progress Report Jeff Bennett Jonathan Boschiero Kiehl McIntyre Ryan Ernst David Turcic (Advisor) David Cifuni (PECO Contact)
GENERAL PROBLEMS IN HYDRAULIC PRESS
Marcos Esterman, Associate Professor Industrial and Systems Engineering Department Rochester Institute of Technology Multidisciplinary.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
1 AATC, Inc W. Catalina Dr. Phoenix, AZ USA AATC PRESENTATION – INVESTMENT CASTING PROCESS (2 OF 3 – PRESENTATIONS – REVISION.
Uniform or general corrosion is typified by the rusting of steel Uniform or general corrosion is typified by the rusting of steel.  Other examples.
NEW DRY TOWER WITH SIGNIFICANTLY QUIETER BLOWER NEW SQUEEGEES REVERSABLE AND EASY TO REPLACE NEW AIR KNIVES BETTER DRYING PERFORMANCE AND RELIABILITY BHP.
Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :
Cequent Group “The Development Of A Tie Down Ratchet Group 2 Stephen Smith Otto Gerdeman Adam Schmitz.
Multidisciplinary Senior Design Project Charles Alexander, Tom Christen, Kim Maier, Reggie Pierce, Matt Fister, Zach Mink Underwater Thermoelectric Power.
ME 418 M8, M9, & M Robert Peace
TPO Lap Splicing Lap Splicing Lap splicing on a TPO system is defined as joining two separate sheets, by way of heat welding, into one monolithic sheet.
NSTX TF Flag Joint Design Review INTRODUCTION C Neumeyer 8/7/3.
Volume melted in batch >= 20 gallons Flow Rate >= 50 lbs/hr Width
The Need Specification. References  Adapted from:  Design for Electrical and Computer Engineers, first edition, by Ralph M. Ford and Chris S. Coulston.
Open die forging Shapes generated by open die forging are simple; examples include shafts, disks and rings. An example of open die forging in the steel.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
©2008 IMI Cornelius Confidential v.0207 As we become more of a global company it has become apparent that we need to standardize the ways that we communicate.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
DESIGN FOR XXX Design Strategies. Design for X Design Strategies 1/4/ Part shape strategies:  adhere to specific process design guidelines  if.
Subtractive Manufacturing Exercise #1 Step #2 Key Fob Project Using Velocity CNC Software for the CNC Milling Machine Note: In order to use this set of.
Lock change and lock box photo requirements All rights to this document are reserved by North Georgia Services. Following this procedure will ensure that.
CNC Assembly: 3 axis rigid PVC structure NEMA 17 Motors and lead screws Off the shelf Router and Specialty collet Vacuum Table to hold down work piece.
 Open  Open an existing Autodesk Inventor file  New  Template for a new part, assembly, presentation file, sheet metal part, or drawing.
Mec-Tric Control Company In Field Valve Testing on SRV’s with on process line AVK pressure device. MEC-TRIC.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
PDS. Contents  Introduction  Definitions  1) Performance 1.0 Function 2.0 Appearance 3.0 Reliability 4.0 Environment 5.0 Ergonomics 6.0 Quality 7.0.
Lifting with Equipment During assembly operations it may be necessary to lift or move heavy equipment. The equipment used to achieve this is covered by.
WORK STUDY HOW THE TOTAL TIME OF A JOB IS MADE UP (IE411)
STEP 1: ASSEMBLE ANGLE PLATES
IDENTIFYING MAT FAULTS
Turbo Installation Manipulator Final Design Review
CUT40P training manual March.2011.
Receptacle Housings for M-Style Infinite Switches
Fastener Facts Fastener Facts.
Why do we study manufacturing?
Tool removed during cycle Fault #2
Fastener Facts Fastener Facts.
Asphalt Drum Mix Plant. What is Asphalt Drum Mix Plant ? Asphalt Drum Mix Plant is an uninterrupted mixer in which heating of aggregates, its consistent.
STEP 1: ASSEMBLE ANGLE PLATES
P08002-Automated Parallel Bars
Chapter 3: Design Solutions
Intercompany Accounting For Wings
Level 1 Module 2 Lesson 5 AXS Machines.
High wheel space Temperature issues
3M™ Universal Cover Tape (UCT) 2688A application procedure
Design Strategies Design for XXX.
CIS248 – Advanced App Development Week: 2 Update By: Nick Arneson
Presentation transcript:

PECO PRODUCT DESIGN SPECIFICATIONS REPORT PRESENTATION Group Members: Jonathan Boschiero Kiehl McIntyre Jeff Bennett Ryan Ernst

PECO Manufacturing, Inc PECO Manufacturing, Inc. produces fuel tank access doors for installation on Boeing aircraft.

A completed door consists of a nylon panel with twenty three internally threaded metal inserts pressed into pockets around the perimeter.

Mission Statement The PECO capstone design team will redesign Lola to eliminate deficiencies in its current design. Systems that identify correct insert type, provide consistent and verified insert temperatures, and verify correct pressing depth will be designed, prototyped and installed. The design will be completely documented by a design report including: analysis, detailed drawings, and a bill of material.

The process of interest is the pressing of inserts into the pockets. There are three problems with the insertion process: The wrong type of insert may be pressed into a panel. Installed inserts may not meet pull-out and torque-out requirements. Inserts may not be pressed to the correct depth.

Insert type pressed is incorrect PECO produces 2 models of fuel access door.

Insert type pressed is incorrect There are two paths that lead to the wrong insert being pressed: Inserts may be left in the machine between set-ups. Inserts loaded into the machine may be mixed. To ensure only inserts of the correct type are pressed: A quick and reliable method to remove unused inserts between set-ups is needed. Inserts loaded into the machine need to be identified as the proper type before being pressed.

Failing to meet pull-out and torque-out requirements Success of the pressing process is dependent upon temperature. Inserts pressed at a temperature that is too low fail to meet pull-out and torque-out specifications. However, if the temperature is too high, nylon flows out from around the insert causing undesirable features. Control of insert temperature before pressing is needed to ensure pull-out and torque-out specifications are met.

Pressing depth is incorrect Inserts must be pressed to a specified depth below the surface. A flange around the circumference of the ram limits maximum pressing depth by contacting the panel surface. While the flange does limit maximum depth, if too little force is applied the insert will not be pressed to the minimum depth. The depth to which inserts are pressed needs to be verified as correct during machine operation.

House of Quality

Do you have any questions?