ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,

Slides:



Advertisements
Similar presentations
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Advertisements

IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
ADJUSTABLE STRONG PERMANENT MAGNET FOR FINAL FOCUS QUADRUPOLE T. MIHARA, Y.IWASHITA Kyoto University M. KUMADAN.I.R.S. C.M.SpencerS.L.A.C.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
April 24, 2008 FNAL ILC SCRF Meeting 1 Main Linac Superconducting Quadrupole V. Kashikhin, T. Fernando, J. DiMarco, G. Velev.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
ABS Sensors Their Operation and Waveform Produced
INTRODUCTION to the DESIGN and FABRICATION of IRON- DOMINATED ACCELERATOR MAGNETS Cherrill Spencer, Magnet Engineer HOMEWORK PROBLEM for Lecture # 2 of.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
2nd ATF2 meetingRole Sharing between KEK and SLAC M.Kumada Role Sharing between KEK and SLAC 1.Performance of Demonstration power supply of KEK 2.Role.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
NLC - The Next Linear Collider Project James T Volk May 2002 Report to MAC on Magnets James T Volk Fermilab May 11, 2002 LBNL Jose Alonso, Jin-Young Jung.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Suggestion Directive from Magnet Systems Group for how to name ILC magnet types Cherrill Spencer, ILC 2 nd May 2006.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
NLC - The Next Linear Collider Project James T Volk May 2002 Report to MAC on Magnets James T Volk Fermilab May 10, 2002.
ATF2 Magnets Results of the Field Measurements of three ATF2 DEA Dipoles by Single Stretched Wire and Hall Probe at IHEP over past 2 months: updated report.
NLC - The Next Linear Collider Project NLC January Video conference Status of Permanent Quadrupoles James T Volk January 18, 2001.
ATF2 Magnets ATF2 Magnets 7 Oct 08,ATF2 weekly meeting Cherrill Spencer Report ATF2 FD Quads: Mech Msts 1 Report on the mechanical measurements of ATF2.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
November 19, 2008 SLAC Linear Collider Department Slide 1 ILC Superconducting Quadrupole Characterization J. C. Sheppard, Cherrill Spencer, et al. SLAC.
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
Magnetic field measurement of new "QM7R" (TOKIN 3581) 12/16/2008 Mika Masuzawa.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
Booster corrector measurement QA Phil Schlabach 1 May 2007 Proton Source Magnet Meeting.
ATF2Quad Fab & Measurement Status Cherrill Spencer 01/31/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads By Cherrill Spencer, SLAC,
ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 1 Information on Alignment Issues for ATF2 magnets: for.
Magnet Measurement Plan APS MBA M1 R&D Magnet Joe DiMarco, et al. 26 November 2013.
Principals of fast injection and extraction R. Apsimon.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
ATF2 Magnets ATF2 Magnets KNU,Korea ATF2 mtgSpencer & Lam SLAC Lessons learned 1 Lessons learned from designing, fabricating & installing ATF2 magnets.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
NLC - The Next Linear Collider Project James T Volk 10/03/2001 Report on Magnet Group Status May 7 th 2002 J Volk, C Spencer, B Parker.
Status of physics analysis Fabrizio Cei On Behalf of the Physics Analysis Group PSI BVR presentation, February 9, /02/2015Fabrizio Cei1.
FIELD MAPPING V. Blackmore CM38 23rd February /70.
STEVE HAYS AD E/E SUPPORT E4R POWER SYSTEM for HTS MAGNET WIRE TEST.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Idea for the low field dipoles near to IP in 2mrad crossing
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Halbach Magnets: Design, Prototypes & Results
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
CHEN, Fusan KANG, Wen November 5, 2017
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Brief Status Report on Fabrication of ATF2 Quads
ESS MEBT Quadrupole magnets
Hi-pot results summary
Presentation transcript:

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP, February 2006 By Cherrill Spencer, SLAC, for ILC-BDS weekly meeting on 28 th February 2006

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 2 Example of one of the ATF2 quads made at IHEP

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 3 What’s happened: February 2006 Goal was 24 fabricated and measured quads to have arrived at KEK, Japan, by 31 st March. Total order is 29 quads. All 120 trim coils have been wound By 23 rd Feb: 80 main coils been wound and 55 been potted Predicted that by today 96 coils will be ready. Core fabrication has had some problems: flame cutting of 20 quadrant pieces would have made final quadrant size too small (see photo on next slide). New steel had to be ordered: special order from distant steel mill, has taken longer than anticipated Conclusion: only 12 quads will be delivered by 31 st March

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 4 What Spencer did while at IHEP: Feb Monitored the ongoing main coil winding Looked at main and trim coil travellers to check dimensions were within tolerance, cooling hole passage was clear, leak test, impulse test, hipotting test all been done: YES Looked at travellers to check resistance within spec: yes Looked at CMM reports on 2 cores: poletip shape still a little out of tolerance but harmonics are within tolerance, which is what matters

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 5 Some of the 20 quadrant steel pieces that were flame-cut too small

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 6 Magnetic Measurement at IHEP Status Custom made rotating coil being tested since mid January in the first quad. Has multiple set of windings so can buck out much of the quadrupole signal in order to measure the multipoles To measure integrated strength use a single winding – this technique known not to give best precision on quad strength. Looking for 5x10 -4 precision. Been having problem with large changes (1-4%) in the quad strength from day to day, measurement to measurement. Spencer looked for cause of these jumps: took lots of temperature data, timed with the rotating coil data. Varied some conditions deliberately.

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 7 First ATF2 quad & rotating coil measurement apparatus at IHEP, February 2006

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 8 First ATF2 quad on measurement set-up at IHEP

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 9 Quad integrated strength data plotted with temperatures of the steel poletip & rotating coil Measurement number not same as time passed.

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 10 Quad integrated strength (b2) well correlated with temperature of the rotating coil

ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 11 Looking for cause(s) of quad strength jumps Considered following possible causes: –Unstable power supply –Overshoot of current when ramping up to set point –Temperature variation of rotating coil –Temperature variation of steel core –Movement of magnet on its not-tied down support –Fringe fields from nearby magnets –Electronics that process the voltage signal from the rotating coil Put Hall probe in aperture, compared its data with rot.coil Conclusion: faulty MetroLab voltage integrator: to be confirmed by switching in a different MetroLab. Waiting to hear results of switching MetroLabs from IHEP Other issues to be resolved: standardizing to 50 amps; multipole values at various currents