NLC - The Next Linear Collider Project NLC January Video conference Status of Permanent Quadrupoles James T Volk January 18, 2001.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

BROOKHAVEN SCIENCE ASSOCIATES Abstract Vibrating Wire R&D for Magnet Alignment Animesh Jain, NSLS-II Project The alignment tolerance for a string of magnets.
ADJUSTABLE STRONG PERMANENT MAGNET FOR FINAL FOCUS QUADRUPOLE T. MIHARA, Y.IWASHITA Kyoto University M. KUMADAN.I.R.S. C.M.SpencerS.L.A.C.
Magnets for the ESRF upgrade phase II
SCU Measurements at LBNL
Linac Quad Field and Position Stability Chris Adolphsen SLAC.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
LCLS Prototype Undulator Design LCLS Prototype Undulator Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
NLC - The Next Linear Collider Project Andy Ringwall 1/9/00 ME 217 NLC Magnet Project Andy Ringwall, SLAC, Liaison Jeff Rifkin, SLAC, Liaison Shun Takai,
Wrap-up 20 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
NLC - The Next Linear Collider Project Andy Ringwall 11/11/99 NLC Magnets Permanent Magnet Options Bill Fowler, FNAL Andy Ringwall, SLAC.
EM vs. PM Quads Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Enhancement of Single Stretched Wire Measurements of LHC Short Straight Sections Guy Deferne, Nikolay Smirnov, CERN Joe DiMarco, FNAL 14th International.
April 24, 2008 FNAL ILC SCRF Meeting 1 Main Linac Superconducting Quadrupole V. Kashikhin, T. Fernando, J. DiMarco, G. Velev.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
Chapter 17 DC Motors. Objectives After studying this chapter, you will be able to: Explain the principles upon which DC motors operate Describe the construction.
Forging new generations of engineers. DC Motors and Generators Instruction Plan.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
1 LHC IR Quadrupole Alignment Experience at Fermilab T. Beale, J. DiMarco, J. Nogiec, P. Schlabach, C. Sylvester, J. Tompkins, G. Velev 28 September 2005.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
NLC - The Next Linear Collider Project James T Volk May 2002 Report to MAC on Magnets James T Volk Fermilab May 11, 2002 LBNL Jose Alonso, Jin-Young Jung.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
F March 31, 2001David Finley / Fermilab Saturday Morning Physics Slide 2.1 Saturday Morning Physics - Accelerators Accelerators What’s Up Now? What’s Up.
Magnetic Fields. Properties of Magnets Polarized- has two ends (north-seeking and south-seeking) Can cause other materials to become temporarily polarized.
NLC - The Next Linear Collider Project James T Volk May 2002 Report to MAC on Magnets James T Volk Fermilab May 10, 2002.
NLC - The Next Linear Collider Project Oct 01 MAC James T Volk October 2001 MAC meeting Magnet Systems for the NLC James T Volk October 26, 2001.
rd ATF2 project meeting Permanent Magnet Updates Y. Iwashita, M. Ichikawa, Y. Tajima, M.Kumada, C.M. Spencer Kyoto University, NIRS, SLAC Contents:
ATF2 Magnets Results of the Field Measurements of three ATF2 DEA Dipoles by Single Stretched Wire and Hall Probe at IHEP over past 2 months: updated report.
Principles of Physics Magnetism and Electricity. 3 Dimensional Directions Right Left Up Down Into Out of page page xxxxx.
Forces on Current Carrying Wires. If a current carrying wire produces a magnetic field, we should expect that magnets exert a force on the wire Direction.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
NLC - The Next Linear Collider Project Status of Magnet R&D Nov. 7 th 2002 James T Volk Fermilab James T Volk 11/07/2002.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
November 19, 2008 SLAC Linear Collider Department Slide 1 ILC Superconducting Quadrupole Characterization J. C. Sheppard, Cherrill Spencer, et al. SLAC.
Drive Beam Quadrupoles Jim Clarke, Norbert Collomb, Ben Shepherd, Graham Stokes STFC Daresbury Laboratory, UK Antonio Bartalesi, Michele Modena, and Mike.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
ATF2Quad Fab & Measurement Status Cherrill Spencer 01/31/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads By Cherrill Spencer, SLAC,
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
FD Movers and Alignment Methods Superconducting Magnet Division, BNL IRENG07 Workshop: September 19, 2007.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Electron beams in order to sense nm-size mechanical vibrations? CERN: Marek Gasior: BBQ electronics (Andrea Boccardi: VME electronics) Juergen Pfingstner:
NLC - The Next Linear Collider Project James T Volk 10/03/2001 Report on Magnet Group Status May 7 th 2002 J Volk, C Spencer, B Parker.
F James T Volk Arpil Permanent Magnets for Linear Colliders James T Volk Fermilab.
Design and Measurement Results for the Permanent Magnet Undulators for the Linac Coherent Light Source Facility II D. Arbelaez BeMa2014, 01/02/2014.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
BARC First Prototype PXIE Magnets Measurements at Fermilab 9/16/2014Michael Tartaglia, TD/T&I Dept.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
September 27, 2007 ILC Main Linac - KOF 1 ILC Main Linac Superconducting Quadrupole V. Kashikhin for Magnet group.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
SC Quadrupole Magnets in ILC Cryomodules
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
CLIC Workshop 2016, CERN 20th January 2016
Electromagnetism It was observed in the 18th century that an electric current can deflect a compass needle the same way a magnetic field can, and a connection.
Magnetic Force on a Current-Carrying Conductor
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
MAGNETISM AND ITS USES Electricity and Magnetism
8-2 Electricity & Magnetism
FNAL Superconducting Quadrupole Test
Moving Charges In Magnetic and Electric Fields
Presentation transcript:

NLC - The Next Linear Collider Project NLC January Video conference Status of Permanent Quadrupoles James T Volk January 18, 2001

NLC - The Next Linear Collider Project NLC Quad Specifications

NLC - The Next Linear Collider Project Corner tuner Rods rotate to adjust field Rotating tuning rods Permanent magnets Pole

NLC - The Next Linear Collider Project Wedge Quad Rods rotate to adjust field Rotating magnetsWedge Magnets Pole

NLC - The Next Linear Collider Project SSW and Wedge Quad Wire stages

NLC - The Next Linear Collider Project Gradient ((measured-average)/average)*10000 FWHM 3 units

NLC - The Next Linear Collider Project Center Stability Difference between 5 successive measurements FWHM 2 microns

NLC - The Next Linear Collider Project Calculated vs.Measured Field PANDIRA predicts 0.62 Tesla at m for m This is Tesla SSW measures Tesla 16% lower than predicted Br and Hci in calculation needs to be adjusted

NLC - The Next Linear Collider Project FWSQ001 Close to desired field 16 % low Have 20% tunable range Need to measure Center stability during adjustment The FNAL test stand is capable of these measurements New wedge tuner design in drafting magnet material on order Increase the amount of magnet material by 15% increased predicted field by 25%

NLC - The Next Linear Collider Project Status of permanent “wedge” magnet measurements at SLAC, Jan 2001,pg 1/2 Tuner rods much harder to rotate than expected –Chain drive mechanism was modified but still one rod rotated by degrees more than other 3, so resorted to no chains, rotate each rod by hand and clamp in place with special plate. If we have the rod starting positions correct, then we have the rotated the 4 tuners through the same angle to 0.37 degrees – corresponds to  1  m –Concern- does rotating one at a time introduce some magnetic hysteresis effects? Only measuring X co-ord with a stretched wire system –not the highest resolution linear stages –measuring set-up is not thermally stablilized –thermal noise is significant (signals are very small) –precision of each measurement is 3-4 microns Nevertheless we’ve measured the X center – at various tuner rod angles, corresponding to different  G.dl

NLC - The Next Linear Collider Project Status of permanent “wedge” magnet measurements at SLAC, Jan 2001,pg 2/2 X magnetic center observed to shift by up to 37  m when strength is changed by rotating tuner rods. The larger the rotation the larger the  x, 114   20% strength change  37um Several things could be causing these shifts, so not a final measurement, e.g. whole magnet moves as exert much force to rotate rods; stretched wire set-up maybe temp sensitive; rod starting angle wrong. Improvements being made to improve precision: –highest res linear stages about to be refurbished by Newport Corp –thermal noise being reduced; thermal stability to be improved –modify fitting routine From electromagnet measurements we know rotating coil’s precision in x/y is  m and is very stable so rotating coil’s length being extended so it can measure the permanent magnet prototypes Second wedge magnet being assembled with less stiff tuner rods

NLC - The Next Linear Collider Project Sliding Shunt

NLC - The Next Linear Collider Project Shunt Quad on SSW stand

NLC - The Next Linear Collider Project Shunt Quad Test Gradient Tesla\meter Maximum field Tesla Minimum Field Tesla 13.5% change Center Shift ~ 15 microns From Max field to Min field New design in works improve sliding bearings

NLC - The Next Linear Collider Project Rotational quad Permanent magnets

NLC - The Next Linear Collider Project Rotating Quad Parts are in the shop Expect to have a magnet by March

NLC - The Next Linear Collider Project Issues to test Center Stability Strength Repeatability in Tuning Speed of Gradient Change Radiation Hardness

NLC - The Next Linear Collider Project Conclusions There are three prototype permanent magnet quads Two more on their way Two test stands SLAC and FNAL capable of doing measurements Both SLAC and Fermilab agree to better than 1 part in 10,000 on strength Will start rigorous test of stability Will chose “best” model this year