The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.

Slides:



Advertisements
Similar presentations
BLM Trip Limits Revisited May 28, 2004 Peter Kasper.
Advertisements

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Expected Sensitivity of the NO A  Disappearance Analysis Kirk Bays (Caltech) for the NO A Collaboration April 14, 2013 APS DPF Denver Kirk Bays, APS DPF.
CH 27. * Data were collected on 208 boys and 206 girls. Parents reported the month of the baby’s birth and age (in weeks) at which their child first crawled.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
The MINERnA Experiment
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Nov
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
MINERvA Overview MINERvA is studying neutrino interactions in unprecedented detail on a variety of different nuclei Low Energy (LE) Beam Goals: – Study.
Expected Sensitivity of the NO A  Disappearance Analysis Kirk Bays (Caltech) for the NO A Collaboration April 14, 2013 APS DPF Denver Kirk Bays, APS DPF.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Sept  Purpose  Requirements and Scientific Method  Important Dates  Common concerns  Research Paper  Questions.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
1 PHYSICS IN THE NuMI BEAM with a ~10 kiloton LARTPC prototype ASH RIVER or SOUDAN J.Schneps PRELIMINARY,UNFINISHED, & ROUGH Sept. 27, 2007.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Small steps make a big difference! Walk to School Week st to 25 th May.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Muon absolute flux measurement in anti-neutrino mode A.Ariga 1, C. Pistillo 1, S. Aoki 2 1 University of Bern, 2 Kobe University.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
The MINER A Experiment Sacha Kopp, University of Texas at Austin on behalf of the Minerva Collaboration.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
MINERνA Overview  MINERνA is studying neutrino interactions in unprecedented detail on a variety of different nuclei  Low Energy (LE) Beam Goals: t Study.
NOnA NuMI Off-axis ne Appearance
Monthly Report For January 2017
Presentation of Data.
Average Monthly Temperature and Rainfall
Shifter Instructions regarding the ZD, Dan Peterson
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Mammoth Caves National Park, Kentucky
Jaewon Park University of Rochester
T2K Run8 MUMON Summary.
Science CnD Business Model Results
StayTreat Wrap Up OPS 2015 StayTreat.
26 Oct 2017 – May 2019 Well water level monitoring data
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011

2 Data Congratulations to the AD have the best 7 day period to date – 0.923×10 19 POT for, Oct 7-13 Move to LE10 FHC 185 kA horn current on Oct 5, beam up on Oct 6 –1.38×10 19 POT for, Oct 6-16,  with NT-07 –0.90×10 19 POT for, Oct ×10 19 POT with NT-07 MINERvA live time Oct 7– Oct 11 – 98.8% –The Feynman computer outage has caused problem in understanding the live time Oct and the MINOS live time % live time Oct 7-11

Data Roughly, down 1 hour during the change over due to unanticipated problems when data disc in Feynman (BlueArc) went down. –Online monitoring went fine –The outage caused nearonline monitoring, which has higher statistics and uses DSTs, not to work. After we returned to the full monitoring, no detector problems were seen. –No detector problems occurred during the shutdown. Running at 36-37×10 12 POT/pulse –Beam Permit is set to trip at 37.5×10 12 POT Beam rate back to 2.2 seconds on Oct 15 as people are trying to understand why HV101 tripped off on temperature on Oct 15 3

MINER A POT/Day Nov Present 4 x

5 Accumulated POT to Oct 13 Anti- run, full scale corresponds to 1.76×10 20 POT –# POT for collected for anti- before Mar 23 10, official start of MINER A run NT02 running gives enough anti  data for doubling of the 1 st anti  data set. Minerva run, full scale corresponds to 4.9×10 20 POT – # for which MINERvA project & experiment were reviewed & the detector built. Projected assumes 0.92×10 18 POT/day –# POTs – average over the uptime during the past 1.5 years –Actual run plan not yet determined, this is one possible scenario

NuMI Beam Plots 6

Protons for the Week ×10 19 POT for best 24 day Beats out ×10 19 POT on Jan

FY2012 Protons 8

NuMI Protons over History 9