1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Chapter 6: Animal Housing Features © 2005 Thomson Delmar Learning. All rights reserved.
Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 Asian Region Mechanical Design ILC Mechanical & Electrical Review Masanobu Miyahara /KEK Atsushi Enomoto /KEK Masahito Huse /Nikken Sekkei 2012/3/21.
Ventilation Effectiveness & Indoor Air Quality Douglas Spratt February 2001.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
 Site  Requirements  Local Resources  Initial layout ideas  Brief material selection  Supply options.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
ILC Energy Efficiency Marc Ross and Ewan Paterson, SLAC CFS-ADI Joint Meeting ICEPP University of Tokyo 9 April 2014 Three examples: 1) higher quality.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
PSB Beam Dump Cooling Constraints Glen Mason EN-CV 30 August 2012.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
3.4 Equal friction method This method of sizing is used for supply, exhaust and return air duct system and employs the same friction lose per foot of length.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL CERN TS/CV Wednesday 9 th July 2008 CLIC.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Day 3 Part 3 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
50% LBNE Concept Design LAr Infrastructure. Mechanical.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Revoir titre.
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
Americas KlyCluster Cost Analysis Overview
FCC Tunnel and Shaft Cross Sections
By Kaung Htat Nyunt DUCT WORK INTRODUCTION
Presentation transcript:

1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab

Klystron Cluster August Cost Basis 2

Single Tunnel Alcove Layout Alcove and Area of Refuge Consideration NFPA 520 …shall have fresh air from the surface during a fire emergency Air quantity shall be 34m³/hr (944 L/s, 20cfm) per person or minimum required to prevent smoke infiltration. Shall maintain 12.5Pa (0.05in.wg) relative to adjacent space. Shall be provided with food, water, emergency lighting, blankets, toilets facilities, first aid kits, two communications. 3 Area of Refuge Rack Alcove

Tunnel Section with Ventilation Piping in Floor 4 S E VENTILATION DUCTS

Area of refuge Layout 5

Single tunnel Airflow Air supply into area of refuge and rack alcoves. “Heat to air” in beam tunnel considered to be quite small. 95% reduction from RDR 6

Airflow during Emergency Smoke barrier/water curtain at approx. 600m intervals 7 test