ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Linear Collider Detector R&D Support John Jaros SiD Workshop at SLAC August 22, 2012.
White Papers, Framework Proposals, FOA’s, and LCDRD John Jaros SiD Meeting Oregon ALCPG March 23, 2011.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Slides for Project Review 15 Dec ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE.
What’s up at SLAC Linear Collider R&D organization Tom Himel SLAC Linear Collider Consortium Organizational Meeting Cornell April 19, 2002.
The SiD concept Yannis Karyotakis LAPP Annecy / IN2P3 March 21 st ‘05.
R&D Perspectives, Jim Brau, Santa Cruz, June 28, Jim Brau Univ. of Oregon Santa Cruz Linear Collider Retreat June 28, 2002 R&D Perspectives R&D.
J. Brau ALCPG Workshop at Snowmass August 27, Concluding Remarks 2005 ILC Physics and Detectors Workshop at Snowmass.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
“GLD” Detector Concept Study 21. Mar. Y. Sugimoto KEK.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
Snowmass, August 16, 2005 H.Weerts SiD Design Goals and Plans for Snowmass Snowmass H.Weerts Argonne Nat. Lab./ Michigan State Univ.
ILD meeting Welcome/Introduction 2015/4/23 Y. 1.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Charge to the SiD Workshop Andy White University of Texas at Arlington.
ALCPG Simulation Status and Plans ECFA LC Workshop, Durham Sep. 2, 2004 Norman Graf (SLAC)
ALCPG Simulation Status and Plans ACFA LC Workshop, Taipei Nov. 10, 2004 Norman Graf (SLAC)
Closing remark Weiguo Li, IHEP 9 th ACFA workshop and GDE Meeting Feb. 7, 2007 IHEP, Beijing.
Worldwide Study Organizing Committee Report from Worldwide Study on Physics and Detectors ICFA meeting, Beijing August 2004.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
Report from WWS and charge to the workshop Hitoshi Yamamoto 3/3/05 KEK.
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
Jim Brau for WWS to ICFA at Uppsala, 3 July Report of WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford March Discussing.
Workshop Goals SiD RAL Workshop April 14, 2008 John Jaros.
WWSWWS David J. Miller for WWS to ILCSC at Frankfurt, 10 May from the WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
ILC US detector R&D H.Weerts, Argonne Nat. Lab. Status & progress in the US Organizational status.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
M. Oreglia, ALCPG07, 23 Oct 2007Slide 1 (of 1) Introduction to SiD; Preparing for a LOI Quick overview of SiD Charge to SiD speakers Substance of.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
The Silicon Detector Concept Taipei ACFA Meeting November 9, 2004 John Jaros.
SiD Snowmass 05 Jaros1 Optimizing SiD getting from here….……………….to there SiD Concept/Snowmass August 16, 2005 John Jaros.
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
1 Design Activity of Large Detector for ILC July 18, 2007 Yasuhiro Sugimoto KEK.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
Tev Connection; June 25,2005 H.Weerts R&D ILC R&D H.Weerts Michigan State University / Fermilab ILC = International Linear Collider.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
VLCW06, July 23, 2006 H.Weerts Vancouver, CA 1 Where YOU can contribute in SiD. H.Weerts Argonne National Lab for SiD concept design study.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Status of the DCR Detector Chapter International Linear Collider (ILC) Workshop ILC-ECFA and GDE Joint Meeting in Valencia 7 November 2006 Detector Concept.
September 20, 2005Margaret Votava1 ILC Controls Planning.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
ECFA 04, Durham, Sept. 04 H.Weerts SiD design study Silicon Detector Design Study H.Weerts Fermilab / Michigan State University.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
SiD R&D Plan and Opportunities for New Collaborators
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Preparations for the SiD Workshop at Fermilab, April 9-11
CLIC detector at SiD meeting 28/3/2010
The SiD Detector Outline Overview
The DBD: Outline and Scope
The Silicon Detector Design Study European Kickoff Meeting
Linear Collider Simulation Tools
Presentation transcript:

ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick off meeting at ACFA-7 meeting Taipei, Taiwan Nov 9-12, 2004

ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off SiD kick-off meeting agenda Agenda  Intro Harry Weerts  Critical Questions for SiD Jim Brau  Simulation status Norman Graf  Goals/Organization Harry Weerts  Discussion/Interest? All Other talks at ACFA-7 earlier today: -The Sid Concept by John Jaros

ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off Goals for SiD Design Study from Develop an integrated detector design well- matched to LC physics at.5 and 1 TeV, starting from the SiD Detector Concept.  Generate a realistic picture of detectors, supports, readout, and services for each subdetector technology.  Optimize overall detector physics performance for benchmark reactions, constrained by rational cost.  Define the R&D needed to prove the design concept.  Estimate detector costs in time for the Machine CDR.  Write a CDR describing the design and its expected physics performance. Refine costs estimates in time for the Machine TDR.

ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off Goals and time line--draft Goal: Benchmarks physics ( agree with other designs) Conceptual design  CDR Cost estimate ( need guidelines & standards) Show technical feasibility of subsystems Define necessary R&D WWS Fall 2004 – Summer 2005: Design Studies agree on common assumptions Optimize design Make design realistic ( necessary support, etc.) Establish simulation ( common with all others ?) Performance/Response to benchmark processes August 2005, Int. Lin. Coll. Wrkshp at Snowmass Agree on strawman design Start final series of benchmark and simulations Define work needed to complete by end 2005 Hadr. Showers Algorithms

ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off Detector R&D efforts & Design Studies Vxd 4-5 SiLCTPCTPC JetJet Calic e EM Calic e HAD LC cal Cal Asia EM OR/ SLAC EM hybrid mu on SiDXXXXXXXX LADXXXXXXXXXXX HUDX?XXXXXX Nearly all detector R&D efforts are represented in the Design Studies (DS) Fwd trac Fwd cal Fwd Che DA Q  BD IR SiDXXXX LADXX?XX HUDXX?XX At least one representative of each R&D effort in each DS Goal:

ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off Draft Organization of SiD Obvious: center of gravity in US, and at SLAC & Fermilab, however this IS a global effort and we would like to see active participation from all regions of the world. Wan to reflect this in organization. Suggestions welcome….

ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off More Organization There is a SiD website: www-sid.slac.stanford.edu On this Web site you will find: Talks/presentations on SiD SiD Hypernews discussion forum Sign up for interested parties

ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off Meetings now & future Weekly/bi-weekly ( phone/video): Tracking meetings every week on Friday morning; now more emphasis on SiD tracker layout and design Monthly solenoid meetings Bi weekly calorimeter meetings will start in Dec Start other “subsystem” meetings soon Subsystem leader meeting in Jan/Feb 2005 March 17, 2005 ( Day before LCWS2005 at SLAC): One Day SiD Meeting March CALICE at NIU/FNAL …….. More to be defined August ILCWS Snowmass Big opportunity for SiD collaborative effort

ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off Summary Why are we here ? Invite your participation in the SiD Design Study We have a starting point for the SiD Design Study, but the end result will depend very much on input from participants all around the globe over the next year and beyond