LBT Q2 2008 Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.

Slides:



Advertisements
Similar presentations
Weather Discussion Synopsis Final check-up on Hurricane Adrian NC weather conditions from 6/9 (Thursday) through 6/14 (Tuesday)
Advertisements

Weather Discussion Tuesday, December 6. Powerful Santa Ana Winds on December 1 (NAM Model)
Weather Discussion August 11-16, Chaff detected by Jacksonville, FL radar…
Weather Discussion Wednesday 4 May to Tuesday 10 May.
St. Mary’s Primary School – Northern Ireland. Monday 20 th January 2014 Time:10:00am Short daily description 5° A frosty morning, clear sky, sunny, no.
Amazing Words Sam, Come Back!. Monday  needs – things people must have to live  responsibility – when you have responsibility, there are things you.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
Today Is Sunday By Dr Jean.
CPA Exam Preparation Presented by: Steve Shin March 26, 2014.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
My Week by D. Timoshenko. My name is Dima Timoshenko. I am a pupil. I go to school every day. I like to swim, to dance and to play computer games.
Ain't It A Shame 1-4 Aint it a shame to work on Sunday, Aint it a shame, (a working shame,) Aint it a shame to work on Sunday, Aint it a shame, (a working.
1 The seven days of the week. 2 Monday is our washing day. Scrub, scrub, scrub.
QUESTION 1 What day is it today? A) I’m Tuesday. B) I have Tuesday. C) Tuesday. D) It’s Tuesday.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
Autumn in Poland.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
+ Study Guide PREPARE TO SUCCEED. + THE KEY TO SUCCESS Effort is the main key to success It is not intelligence that matters most – it’s EFFORT Smart.
Time Zones The World is divided up into 24 time zones. Each time zone is approximately 15 degrees of longitude wide. The time within each time zone has.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
Flight Traveling By Emily. Surabaya – Auckland Departure time: Monday, September 29 th at 3:00 a.m. Length of flight: 9 hours and 16 minutes Auckland.
Penn Liberty Motors Automobile Dealerships. Location 20 North Broad Street Philadelphia, PA
ARISE Summer Institute UC Davis June 17-June 22, 2011.
Class Schedule Template SundayMondayTuesdayWednedayThursdayFridaySaturday 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 AM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM Title Classroom.
Idaho Weather and Climate Outlook IDWR Briefing, February 14, 2014 Temperature and Precipitation Summary Snowpack Forecast for next 7 days 3 Month Outlook.
What day is today? What`s the date?. Sunday Monday Tuesday Wednesday Thursday Friday Saturday What day is today?
Days of the week instructions. Children can; Order the days of the week. Use sentence strips and activity cards to write sentences about what they do on.
(Tentative) Plan for Last Days of School. Friday 5/8 / Monday 5/11 Work on empathy final project Tuesday 5/12 / Wednesday 5/13 (MIN.) Work on empathy.
4A : Unit 7 Busy Lizzie She has piano lessons on Sundays.
On Sundays, I work. On Mondays, I wash my car.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
Check your Good Habits 8:20 at school 8:25 moving to class 8:30 IN class for O Canada.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
8am: start testing the corner cube mounts on DX cells.
Garside: SNC2D. The following schedule is for Period 2 Class:
Click the button to begin. 12:25 What time does this clock show? 5:00 4:00.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
Radio Alarm Radio Alarm Project. 시나리오 메인화면 Set alarm Play radio Add radio channel.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Engineering Review SAB Static Balancing.
11/2 – 11/8 Daily Log. Monday Met w/ students for Lunch Admin Tasks Workout w/ Chris & Kyle.
Weather Forecasts Prepared by Claudia Doria and Terra Myers.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
Good morning. Presented by Roksana Khanum Rimu Assistant Teacher Vagobanpur Government Primary School Sadullapur,Gaibandddha.
Mount St. Helens 8:32 Sunday Morning, May 18, 1980 Occurred at Mount St Helens in the state of Washington.
Class Time Modules for the Semester Calendar Additional Senate Discussion
LBT Q Engineering and Software Review ENGG Engineering General.
Expense Report Total Miles MONDAY 5 5 TUESDAY WEDNESDAY 6 6 THURSDAY FRIDAY SATURDAY 0 SUNDAY0 TOTAL 23.
NHS Meetings Calendar All Meetings are at 2:20pm unless otherwise stated This logo denotes a General Meeting. This means that ALL MEMBERS must.
Monday October 5, 2015 WARM-UP: QUESTION #1 WEEK OF OCT 5 QUESTION - DESCRIBE HOW THE RESPIRATORY SYSTEM AND THE CIRCULATORY SYSTEM WORK TOGETHER. Unit.
The birthday calendar 2B : Unit 6 Days of the week Days of the week.
WARNING MESSAGES AND EVACUATION Hugh Gladwin. Warning messages work when they warn people who then are able to take appropriate action given the constraints.
Happy Days by Charles Fox and Norman Gimbel PowerPoint by Camille Page.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
Daily Math Review September 2-6, Monday Solve the following problems with strategies and/or algorithms 5, = 9, = 3, =
Days of the week and my activities. Oscar Sada ESL 1 Mrs. Echeverry
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
THE PRESENT SIMPLE : For actions which occur regularly, habits, permanent situations and general truths.
For actions which occur regularly, habits, permanent situations and general truths. THE PRESENT SIMPLE :
My Plan to Go to Around the world By: Benedict/5C.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
Budapest Prepared for Experience Europe Students, May 31, 2012.
LBT Q Engineering Review Primary Mirror Cells.
Presentation transcript:

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting

21-Jul-2008LBT Q Engineering Review Highlights (Q2/2008) None None

21-Jul-2008LBT Q Engineering Review Progress (Q2/2008) Planning From Q1 Review Planning From Q1 Review Make duplicate cell feedthrough for Sfigotto, pressure gauge, etc √ Make duplicate cell feedthrough for Sfigotto, pressure gauge, etc √ Make duplicate Sfigotto pressure control √ Make duplicate Sfigotto pressure control √ Next Aluminization is Aug (on SX) Next Aluminization is Aug (on SX)

21-Jul-2008LBT Q Engineering Review Open Issues Technical Technical Documentation for Aluminization System from OSU improved but needs more work Documentation for Aluminization System from OSU improved but needs more work Keep cleaning fluids out of cell Keep cleaning fluids out of cell Upgrade of Aluminization System Upgrade of Aluminization System Cleaning/Stripping System Cleaning/Stripping System Glow discharge ? Glow discharge ? Locking devices unreliable Locking devices unreliable M3 swing arms need to be retracted farther than normal to clear belljar M3 swing arms need to be retracted farther than normal to clear belljar LBT personnel can do most of the process now, as long as nothing goes wrong LBT personnel can do most of the process now, as long as nothing goes wrong Something always goes wrong Something always goes wrong Schedule Schedule None None Financial Financial None None Resources Resources None None

21-Jul-2008LBT Q Engineering Review Planning (Q3/2008) Next Aluminization starts 11 Aug on SX Next Aluminization starts 11 Aug on SX Monday 11th: Mirror Wet with Chemicals 11AM-3PM Monday 11th: Mirror Wet with Chemicals 11AM-3PM Tuesday 12th: Final Wipe of SX Mirror Surface at Zenith, Tip telescope to Horizon Tuesday 12th: Final Wipe of SX Mirror Surface at Zenith, Tip telescope to Horizon Wednesday 13th: Mount Bell Jar & Start Pumpdown Wednesday 13th: Mount Bell Jar & Start Pumpdown Shoot aluminum Thursday night or Friday morning depending on weather and other issues. Shoot aluminum Thursday night or Friday morning depending on weather and other issues. Warmup on Saturday Warmup on Saturday Vent to atmosphere on Sunday (or Monday AM). Vent to atmosphere on Sunday (or Monday AM). Dismount Bell on Monday 18th. Dismount Bell on Monday 18th. Park Bell on Tuesday 19th Park Bell on Tuesday 19th Prep for Washing DX on Weds 20th Prep for Washing DX on Weds 20th Wash DX on Thursday 21st AM (with enough manpower, we might be able to wash DX on Weds 20). Wash DX on Thursday 21st AM (with enough manpower, we might be able to wash DX on Weds 20).