Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural.

Slides:



Advertisements
Similar presentations
Project Planning: Assembling a Mortenson “Integrated Work Plan”
Advertisements

Riverview Heights Darren K. Howard Structural Option Architectural Engineering Spring Thesis 2005 Advisor: Dr. Ali Memari.
Skyscraper Construction
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
| Michael Gallagher | Construction Management AE Faculty Consultant: Dr. Riley The Pennsylvania State University AE Senior Thesis Project.
Optimizing “Big Box” Construction Lauren Hughes Josh Hogan Kevin Hanson Joseph Garrott Rose-Hulman Institute of Technology.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Penn State Architectural Engineering Senior Capstone Project Ramy Labna | Construction Option | Advisor: Prof Ray Sowers 2B + G + M + 7 Mansoura Development.
Jonathan E. Aberts Spring 2009
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
Major Assignment Construction & Structures SRT251 Lecturer: J.J. Ham Kylie Dalton
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Building With Superior Walls Introducing The Superior Advantage.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Christopher Havens Spring 2012 Dr. Chimay Anumba – CM Advisor Construction Management Penn State AE Senior Capstone Project The Northeastern Pennsylvania.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
George Read Hall The University of Delaware
Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management © Elkus Manfredi Architects Franklin & Marshall College.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Fairfax High School Renovation and Addition Washington, DC M ICHAEL F UNK Construction Management.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Sarah Lippai Spring 2005 Senior Thesis Construction ManagementPenn State University JetBlue Training Facility Orlando International Airport, Florida JetBlue.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
Mathew Nirenberg AE Senior Thesis Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Widener University Metropolitan Hall
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
North Hall | American University| Washington D.C.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
(Refer to Chapter 2 of the textbook)
Redifer Commons Addition & Renovation Project
Outline Introduction Structural Redesign Gravity System
Daniel Suter Unknown Data Center Somewhere, USA
Ryan Johnson - Structural Option
Minuteman Vocational Technical Regional High School Progress
FDA CDRH Laboratory Timothy Mueller Senior Thesis, Spring 2006
Presenter Tony Bosnich 2015
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Presentation transcript:

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural Engineering Department Construction Management Option Spring 2006

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Presentation Agenda  Project Background Info  Long Distance Procurement Process  Tilt-up Walls vs. Precast Walls  FDA Evaluation / Special Considerations  Conclusions  Questions

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Project Statistics  Function:Deboning Facility  Size:67,000 SF  Stories:One 30’ High Story  Cost:$8,000,000  Start Date:8 / 9  Completion Date:1 / 28  Delivery Method: Design-Build

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Site Pics

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Site Plan

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University  Main Problem: -Finding Quality Subcontractors  Goals: -Provide Useful Tools -Show Technology Benefits Long Distance Procurement

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Contacts  Local Suppliers  Specialty Product Manufacturers  Subcontractors  Plan Rooms

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Prequalification Checklist TOPICSQUESTIONS Integrity1.Can you meet the completion date + time commitments? 2.What projects are you currently working on? 3.Currently, what is your backlog of work? 4.Can you provide a list applicable references? Work Experience1.Have you worked on similar projects to this one? 2.What has been your largest project in the past 3 years? 3.How many years has your company been in business? 4.Do you have any repeat clients? If so, who? Qualifications of Supervisory Personnel 1.What training programs to you provide for your employees? 2.How long has your management been at your company? 3.What is their construction background/experience? 4.Who will be assigned to this project? Financial Condition1.Who is your insurance provider and agent? 2.What is your bonding capacity? Safety1.Has your organization been sited by OSHA in the last 5 years? If yes, for what? 2.What is your EMR (experience modification Rating)? 3.Do you have a corporate safety program or company quality program? Can you send us a copy of this?

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Bid Comparison Sheet

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskeySpring 2006 Senior Thesis Construction ManagementPenn State University Bid Review  Evaluate Bids  Review Scopes  Select Subcontractors

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Tilt-up vs. Precast Existing Wall Systems

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Background – Stages of Tilt-up 1 2 3

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Tilt-up Activity Sequencing 1.Mass excavation 2.Subgrade Preparation 3.Install footings and foundations 4.Install any underslab MEP work 5.Form, reinforce, pour, & cure floor slabs 6.Form & pour tilt-up walls 7.Insert leveling pads on perimeter footings 8.Set tilt-up walls with bracing 9.Grout in-between panels and footings 10.Steel erection 11.Erect insulated metal wall panels 12.Install Roofing and sheet metal 13.Remove wall bracing

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Tilt-Wall Composition

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Heat Transfer Equation: q x = (T ∞ 1 - T ∞ 2 ) * A / Total R-Value R-Value Concrete Walls10 5” Metal Insulated Panels 40 Determination = Concentrate mainly on:  Cost  Schedule  Constructability

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Tilt-Up Feasibility

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Panel Layout Diagram

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Panel Pick Points Point Lifting4-Point Lifting 8-Point Lifting Heaviest Panel < 50 Tons Larger Panels, 8-Point Harness Smaller Panels, 4-Point Harness 100 Ton Mobile Truck Crane

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Wall Comparison Chart TILT-UPPRECAST COST $376,200$438,900 MATERIAL Affordable in TNEarly delivery charge ERECTION Fewer panelsMore panels, More time LEAD TIME Cast on-site, possible weather impacts 5-8 Weeks TRANSPORTATION Cast on site, no costDelivery from plant to site CONSTRUCTABILITY Extra planningVery Similar QUALITY Potential RepairsBetter, due mainly to the controlled environment

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University FDA / Special Considerations  Finishes : ~Floors ~Walls ~Pipes ~Trench Drains High Traffic Areas Doors Cold Climate

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Conclusions  Utilize Long Distance Procurement Tools  Tilt-up Walls vs. Precast Walls ~Close Call ~Tilt-up is a good alternative ~Precast has better quality & Less Repairs Associated ~I would Pick Precast  Importance of FDA / Special Considerations

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Acknowledgements  Dr. Riley & the Architectural Engineering Department  United Insulated Structures Corporation ~Larry Lantero, Jr. ~Rich Maleczka  GEM Construction ~Gale Measel ~Greg Measel  P.J. Dick Incorporated ~Tom Berkebile ~Eric Pascucci  Family and Friends ~Mom, Dad, Jon, Scott, & Dina ~My fellow AE peers

Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Questions